| 1 | Drilling of borewells of size 6” to 8” dia. in sedimentary formation using hand boreset including insertion of casing pipe etc., and supplying and packing of pebbles (Conveyance of hand bore set including loading and unloading to be done by the contractor) (Page No:217.) |
| 2 | Supply and delivery of 200 mm dia PVC causing pipe 6KSC/CM2 including cost of pipe ea complete (Page No:7.) |
| 3 | Labour Charges for inserting PVC Casing pipes assembly (with slots or without slots) in the drilled hole including jointing the pipes with PVC Couplers with Cement paste etc., complete, supply and packing the annular space with pebbles of size and quality as approved by the executive engineers of TWAD Board 200 mm dia Casing Pipes assembly (Page No:304.) |
| 4 | Supply and delivery of Wet type Submergible including all labour charges etc., complete., Submergible Motor 500x75 12.50 H.P (Page No:121) |
| 5 | Supply and delivery of Star-Delta starter confirming to IS 13947, IEC60947-1 and as amended thereafter with suitable KW rating for operation in AC/ Three Phase/50HZ (+/- 5%) and 415V (+/- 10%) including 3 pole magnetic contactor with under voltage release - 3 nos., CT operated Ammeter (65 mm dia) with suppressed scale, Voltmeter (65mm dia), Voltmeter selector switch, Miniature circuit breaker, Thermal Overload relay, Air Break contactors suitable for next Standard higher KW rating, Single phasing preventor, dry running preventor and On/Off Push button switches, wiring with 1 sq.mm/4 sq. mm copper pvc insulated cable, powder coated vermin proof box, including the capacitor (the cost of capacitor is to be taken separately). 20 HP |
| 6 | Supply of CHANGE OVER SWITCHES 400A 3 phase 4 pole change over switch including cost and conveyance of materials etc., complete |
| 7 | Supplu and fixing of TRIPLE POLE SWITCHES (SIDE HANDLE) 400 Amps TPN Switch with HRC fuses sheet steel double break |
| 8 | Supply of 80 mm UPVC Pipes specially made for deep borewell Submersible motor erection (ISI Make) including all cost materials, conveyance labours etc., complete as directed by departmental officers. (Page No:24) |
| 9 | Cost and supply of pvc 4Sqmm cable 4 core including cost and conveyance of materials etc., complete (Page No:122) |
| 10 | Cost and supply of Nylon rope including cost and conveyance of materials etc., complete |
| 11 | Cost and supply of L.T. cables 3 core 1.1 kv grade armoured aluminium conductor cross linked poly ethylene insulated pvc sheathed cables conforming to is 7098 (part i)/1988 and as amended thereafter with ISI marking including cost and conveyance of materials etc., complete |
| 12 | 16 Sqmm |
| 13 | 185 Sqmm for genset |
| 14 | Earthwork excavation in all types of strata for laying of pipes with the standard trench width as per TWAD Board Circular No.28/AE10/P&D /2001 / dt.01.10.2001 & JCE (P&D) Lr.No.LM /AE10 / P&D/ 2001/ Dt.22.11.2001. Complete as per standard specfications. (300mm DI pipe -1.05 m depth x 0.75 m width) |
| 15 | Cost and supply of 100 mm GI pipe inculding cost and conveyance of materials etc., complete (Page No:40) |
| 16 | Supply and fixing of GI PipeSpecials. (Page No:44) |
| 17 | 100mm GI Coupling |
| 18 | 100 mm Bend |
| 19 | 100mm GI Gatevalve |
| 20 | 100mm GI Elbow |
| 21 | 100mm Flange set |
| 22 | 80mm Clamp Set |
| 23 | Lowering of 100 mm GI Pipes and specials in the trenches and laying to proper grade and alignment and as directed by the TWAD Officers |
| 24 | Refilling with excavated soil complying with standard specification in layers of 15cm thick well rammed and consolidated after the pipes and specials are laid and tested. |
| 25 | Cost and supply of 200 mm Pvc end cap including cost and conveyance of materials cost etc., complete |
| 26 | Labour charges for Errection of submergible Pump set in bore well including fixing and jointing submergible cable with proper clamps up to the starter to required depth and also fixing of riser pipes to the required depth values Errection clamps pressure gauges up to the exterior wall of pump room and errction of panel board consisting of TPICN switches starter volmeter ammeter three pilot indicator lamps complete and testing the pump set and trail run for 10 days up to 12.50 HP. (Page No:226) |
| 27 | Supply and delivery of RCC Ring well 0.9M m dia using RCC M 30mm using 20mm &10mm HBG stone excluding cost of reiforcement but including cost of curing etc complete and as directed by TWAD Board Officers. |
| 28 | Supply and delivery of RCC Ring well 0.6M m dia using RCC M 30mm using 20mm &10mm HBG stone excluding cost of reiforcement but including cost of curing etc complete and as directed by TWAD Board Officers. |
| 29 | Cement concrte 1:2:4 mix ( one cement, two sand and four aggregate ) including the cost and conveyance of all materials and excluding the cost of steel and including the labour charges for mixing, laying of concrete and curing etc complete as per the standard specifications. |
| 30 | Supply and delivery and fixing of 12V 150 MAH battery for Genset including cost and conveyance of materials cost etc., complete (LR) |
| 31 | GST. 18% (CGST-9%, SGST-9%) Please Enable Macros to View BoQ information |