| 1 | APPENDIX-B: Premonsoon Works |
| 2 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means |
| 3 | OD42380/2026-2027:Lifting the precast RCC covering slab from drain for removal of silt and placing the same slab in position after cleaning |
| 4 | OD42388/2026-2027:Earth work excavation in all classes of soil including removal of garbage ,old plastic bags,and other debris from the chalked culverts, drains and from the berm of the road conveying the deposit of soil and garbage anywhere within 5 km from the site including all labour charge ,hire charge of lorry loading, unloading etc. complete |
| 5 | OD42389/2026-2027: Engaging Mazdoor for various works |
| 6 | OD42390/2026-2027:Engaging woodcutter with tools and accessories required for cutting trees / branches of trees of any girth overhanging above any structures including stacking of serviceable materials and disposal of unserviceable materials without making any damages to nearby structures etc. complete |
| 7 | 3.24.A:Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil by mechanical Means to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres) |
| 8 | OD42386/2026-2027: filling up potholes with bituminous ready mix compound(25 kg) and compacting by ramming to get a compact surface including of cost of materials laying charges transportation to site etc complete rate is arrived for a bag of 25kg(Assuming average of 30 bag of 25kg ready mix will be laid in pothole in a day) |
| 9 | 10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor |
| 10 | OD42381/2026-2027:Engaging hydraulic excavator cum dozer for removal of soil on the berm of the road and clearing the drainage and culverts etc. |
| 11 | OD42387/2026-2027:Engaging tipper of minimum 5cum. capacity on daily basis for removal of slipped earth and excavated materials including all cost etc. complete |
| 12 | OD42382/2026-2027:Engaging Mobile crane for removing the branches of trees including all cost ,conveyance labour charge etc . |
| 13 | OD42385/2026-2027:Filling up with granular material ,including compaction ,all cost of material ,Labour charges conveyance etc complete. Please Enable Macros to View BoQ information |