|
| 1 | New Openwell pumpset Erection including all wire connectionand cabil joint GI,Fittings |
| 2 | Above1HP to 3HP |
| 3 | 3HP to 7.5HP |
| 4 | 7.5HP to 20 HP |
| 5 | Removal of Openwell pumpset |
| 6 | Above1HP to 3HP |
| 7 | 3HP to 7.5 HP |
| 8 | 7.5HP to 20HP |
| 9 | MOTOR REWINDING CHARGES |
| 10 | Above1HP to 3HP |
| 11 | 3HP to 7.5HP |
| 12 | 7.5HP to 20HP |
| 13 | MOTOR & PUMP FIXING STUD WITH NUT |
| 14 | OIL SEAL (Rubber) |
| 15 | OIL SEAL BUSH (G.M) |
| 16 | TIE BOLT & NUT (M.S) |
| 17 | MOTOR BEARING BUSH (G.M) |
| 18 | MOTOR TOP BEARING SLEEVE |
| 19 | MOTOR STUD RING |
| 20 | THURST BEARING TOP (G.M) |
| 21 | THURST BEARING BOTTOM (G.M) |
| 22 | IMPELLER (G.M) |
| 23 | CABLE GLAND (M.S) |
| 24 | MOTOR SHAFT RECONDITIONING CHARGES |
| 25 | PAINTING THE PUMP SETS |
| 26 | Towards cost of transportation charges for Upto 10HP sub motor from Thiruparkadal Head House to Tiruttani Work shop |
| 27 | Towards cost of transportation charges forUpto 10HP sub motor from Thiruparkadal Head House to Tiruttani Work shop |
| 28 | Rotor reconditioning charges |
| 29 | Motor Re-erection Charges |
| 30 | Above 1HP to 3HP |
| 31 | 3HP to 7.5HP |
| 32 | 7.5 HP to 20HP |
| 33 | Supply of the following Openwell panel board TWAD-P110/11.2-5 |
| 34 | Above1HP to 3HP |
| 35 | 7.5HP Star -Delta |
| 36 | Openwell panel board fitting changes |
| 37 | Supply and fixing capacitor 2KVR including all labour charges etc completed |
| 38 | Supply and fixing capacitor 3KVR including all labour charges etc completed |
| 39 | Supply and fixing capacitor 5KVR including all labour charges etc completed |
| 40 | Supply and fixing capacitor 20 KVR including all labour charges etc completed |
| 41 | Over Load Relay unit Set for 5HP |
| 42 | Single Cum Dry running Preventer upto 7.5HP |
| 43 | Contact Point Set Kit |
| 44 | Magnet (No Volt Coil) |
| 45 | Volt Meter (0-500V) Range |
| 46 | Ammeter (0-30A) Range |
| 47 | Volt Meter Selector Switch |
| 48 | “OFF” Button |
| 49 | Servicing and commissioning of accessories in the panel board such as starter, main switch. Contact unit etc and rectifying electrical defects |
| 50 | Fuse carrier Top – 200A (HRC) |
| 51 | Fuse Carrier Top – 250A (HRC) |
| 52 | Fuse Carrier Top – 300A (HRC) |
| 53 | Fuse Carrier Top – 350A (HRC) |
| 54 | Fuse Carrier Top –400A (HRC) |
| 55 | Fuse Carrier Bottom – 200A (HRC) |
| 56 | Fuse Carrier Bottom – 250A (HRC) |
| 57 | Fuse Carrier Bottom – 300A (HRC) |
| 58 | Fuse Carrier Bottom – 350A (HRC) |
| 59 | Fuse Carrier Bottom – 400A (HRC) |
| 60 | Supply of the following 3 Core Submersible Cable |
| 61 | 2.5 Sq. mm 3core submersible cable – 1Mt. p114/ |
| 62 | 4 Sq. mm 3core submersible cable – 1Mt. |
| 63 | 6Sq. mm 3core submersible cable – 1Mt. |
| 64 | 10 Sq. mm 3core submersible cable – 1Mt. |
| 65 | 16 Sq. mm 3core submersible cable – 1Mt. |
| 66 | 3.3.5.3.5 core 1 .1kv grade armoured alumium conducted cable |
| 67 | 35 sqm |
| 68 | 50 sqm |
| 69 | 70sqm |
| 70 | 95 sqm |
| 71 | 120 sqm |
| 72 | 150 sqm |
| 73 | Cable Laying charge For laying below GL including earth work p114/12.3 |
| 74 | Upto 95 sq.mm |
| 75 | 95 to 240 sq.mm |
| 76 | 240 to 400 sq.mm |
| 77 | Cable Laying charge For laying in trenchesinside the pump room orin air |
| 78 | Upto 95 sq.mm |
| 79 | 95 to 240 sq.mm |
| 80 | 240 to 400 sq.mm |
| 81 | Cable Clamps |
| 82 | Upto 95 sq.mm |
| 83 | 95 to 240 sq.mm |
| 84 | 240 to 400 sq.mm |
| 85 | Teak Wood Board – 2\\"x2\\" size |
| 86 | TWIN GI Erthing 1 HP to 25HP Installation work |
| 87 | Welding Charges |
| 88 | 80mm,CI NRV |
| 89 | 100mm, CI NRV |
| 90 | 125mm,CI NRV |
| 91 | 80mm,CI Gate Valve |
| 92 | 100mm,CI Gate Valve |
| 93 | 125mm,CI Gate Valve |
| 94 | 80mm, CI Gate valve & NRV fitting labour charges |
| 95 | 100mm, CI Gate valve & NRV fitting labour charges |
| 96 | 125mm, CI Gate valve & NRV fitting labour charges |
| 97 | GI 5/8 X 4\\" Please Enable Macros to View BoQ information |