|
| 1 | Removal of Centrifugal Monobloc Pumpset |
| 2 | 150HP |
| 3 | 180HP |
| 4 | MOTOR REWINDING CHARGES |
| 5 | 150HP |
| 6 | 180HP |
| 7 | MOTOR TOP BEARING HOUSING (C.I) |
| 8 | MOTOR & PUMP FIXING STUD WITH NUT |
| 9 | OIL SEAL (Rubber) |
| 10 | OIL SEAL BUSH (G.M) |
| 11 | MOTOR BEARING (G.M) |
| 12 | MOTOR STUD RING |
| 13 | BUSH LOOCK NUT |
| 14 | MOTOR SHAFT RECONDITIONING CHARGES |
| 15 | PAINTING THE PUMP SETS |
| 16 | Towards cost of transportation charges for upto 180HP Centrifugal motor from Tiruparkadal Head House to Tiruttani Work shop |
| 17 | Towards cost of transportation charges for upto 150HP Centrifugal motor from Tiruparkadal Head House to Tiruttani Work shop |
| 18 | Rotor reconditioning charges |
| 19 | Servicing, commissioning testing of Centrifugal Motor Pump set |
| 20 | Motor Re-erection Charges |
| 21 | 150HP |
| 22 | 180HP |
| 23 | Supply of the following Centrifugal Motor panel board |
| 24 | 150HP |
| 25 | 180HP |
| 26 | Centrifugal Motor panel board fitting changes |
| 27 | Supply and fixing capacitor 400 kV including all labour charges etc completed |
| 28 | Over Load Relay unit Set for 180HP |
| 29 | Single Cum Dry running Preventer 180HP with CT Transformer |
| 30 | Contact Point Set Kit |
| 31 | Servicing and commissioning of accessories in the panel board such as starter, main switch. Contact unit etc and rectifying electrical defects |
| 32 | Fuse carrier Top – 200A (HRC) |
| 33 | Fuse Carrier Top – 250A (HRC) |
| 34 | Fuse Carrier Top – 300A (HRC) |
| 35 | Fuse Carrier Top – 350A (HRC) |
| 36 | Fuse Carrier Top – 400A (HRC) |
| 37 | Fuse Carrier Bottom – 200A (HRC) |
| 38 | Fuse Carrier Bottom – 250A (HRC) |
| 39 | Fuse Carrier Bottom – 300A (HRC) |
| 40 | Fuse Carrier Bottom – 350A (HRC) |
| 41 | Fuse Carrier Bottom – 400A (HRC) |
| 42 | 3.3.5.3.5 core 1 .1kv grade armoured alumium conducted cable |
| 43 | 185 sqm |
| 44 | 240 sqm |
| 45 | 300 sqm |
| 46 | 400 sqm |
| 47 | Cable Laying charge For laying below GL including earth work |
| 48 | Upto 95 sq.mm |
| 49 | 95 to 240 sq.mm |
| 50 | 240 to 400 sq.mm |
| 51 | Cable Laying charge For laying in trenchesinside the pump room orin air |
| 52 | Upto 95 sq.mm |
| 53 | 95 to 240 sq.mm |
| 54 | 240 to 400 sq.mm |
| 55 | Cable Clamps |
| 56 | Upto 95 sq.mm |
| 57 | 95 to 240 sq.mm |
| 58 | 240 to 400 sq.mm |
| 59 | Teak Wood Board – 2\\"x2\\" size |
| 60 | TWIN GI Erthing 60 HP to 150HP Installation work |
| 61 | TWIN GI Erthing above 150HP Installation work |
| 62 | 400\\"CI NRV |
| 63 | 500\\"CI NRV |
| 64 | 400\\"CI Sluice Valve |
| 65 | 500\\"CI Sluice Valve |
| 66 | Supplying & Fixing of 500\\" Sluice Valve Specials |
| 67 | SS Spindle including threading & all Workshop labour etc. |
| 68 | G.M Nut For Spindle |
| 69 | Gland |
| 70 | CI Flange |
| 71 | GI 5/8 X 4\\" Bold Nut |
| 72 | Packing Rope For Valve With Fixing Labour |
| 73 | 400 Sluice valve & NRV fitting labour charges |
| 74 | 500mm Sluice Valve & NRV fitting labour charges |
| 75 | Towards cost of transportation charges for upto 20\\" Sluice Valve from Tiruparkadal Head House to Tiruttani Work shop Please Enable Macros to View BoQ information |