| 1 | Repairing and Supply of Spares for 13 Nos. of 11/0.433KV sick Distribution Transformers |
| 2 | HV Coil SE Copper / Kg for 100 KVA |
| 3 | H.T. Bushings Insulator (I.S. 3347 ) for 100 KVA |
| 4 | L.T. Bushings Insulator(I.S. 3347) for 100 KVA |
| 5 | H.T. Rod (Brass) with Metal parts (Brass) (IS 3347) for 100 KVA |
| 6 | L.T. Rod copper with Metal parts Brass each (IS. 3347) for 100 KVA |
| 7 | Breather for 100 KVA |
| 8 | Wheel valve of size 1 ¼”each (superior quality) for 100 KVA |
| 9 | New Transformer Oil per litre conforming I.S. No.335-1993 with latest amendments for 100 KVA |
| 10 | C.R.G.O Lamination for 100 KVA |
| 11 | Radiator Fins for 100 KVA |
| 12 | Tap switch Assembly for 100 KVA |
| 13 | Inter coil Insulation per limb for 100 KVA |
| 14 | Re-insulation of L.V. Coils for 100 KVA |
| 15 | Oil Resistance Paint for inner side of Tanks per Transformer for 100 KVA |
| 16 | Gray Paint for outer side of Distribution Transformer for 100 KVA |
| 17 | Gasket for tank cover / Transformer for 100 KVA |
| 18 | Loading of Distribution Transformers at Department site, Transportation and unloading Distribution Transformers at Factory site per Transformer for 100 KVA |
| 19 | Opening, lifting the core and re-Examination: Per Transformer for 100 KVA |
| 20 | Positioning the core back after repair, and complete electrical connection, replacing gaskets and boxing up with top cover for each repairable Transformer for 100 KVA |
| 21 | Electrical connections: Star Connection for 100 KVA |
| 22 | Electrical connections : Delta Connection for 100 KVA |
| 23 | Cleaning tank, tubes, conservator tank etc., internal surface of and make them fit for use and painting with oil resistive paint excluding cost of paint per transformer for 100 KVA |
| 24 | Cleaning, scraping the external surface of the transformer and painting with good quality Siemens grey paint with two coats excluding cost of paint per transformer for 100 KVA |
| 25 | Charges for hot oil circulation after filling for 100 KVA |
| 26 | Drying out of the repaired core after assembling the coils for 100 KVA |
| 27 | Welding per cm for 100 KVA |
| 28 | Total amount for repairing of 11KV, 100KVA Distribution Transformer (A) |
| 29 | HV Coil SE Copper / Kg for 200 KVA |
| 30 | H.T. Bushings Insulator (I.S. 3347 ) for 200 KVA |
| 31 | L.T. Bushings Insulator(I.S. 3347) for 200 KVA |
| 32 | H.T. Rod (Brass) with Metal parts (Brass) (IS 3347) for 200 KVA |
| 33 | L.T. Rod copper with Metal parts Brass each (IS. 3347) for 200 KVA |
| 34 | Breather for 200 KVA |
| 35 | Wheel valve of size 1 ¼”each (superior quality) for 200 KVA |
| 36 | New Transformer Oil per litre conforming I.S. No.335-1993 with latest amendments for 200 KVA |
| 37 | C.R.G.O Lamination for 200 KVA |
| 38 | Radiator Fins for 200 KVA |
| 39 | Tap switch Assembly for 200 KVA |
| 40 | Inter coil Insulation per limb for 200 KVA |
| 41 | Re-insulation of L.V. Coils for 200 KVA |
| 42 | Oil Resistance Paint for inner side of Tanks per Transformer for 200 KVA |
| 43 | Gray Paint for outer side of Distribution Transformer for 200 KVA |
| 44 | Gasket for tank cover / Transformer for 200 KVA |
| 45 | Loading of Distribution Transformers at Department site, Transportation and unloading Distribution Transformers at Factory site per Transformer for 200 KVA |
| 46 | Opening, lifting the core and re-Examination: Per Transformer for 200 KVA |
| 47 | Positioning the core back after repair, and complete electrical connection, replacing gaskets and boxing up with top cover for each repairable Transformer for 200 KVA |
| 48 | Electrical connections: Star Connection for 200 KVA |
| 49 | Electrical connections : Delta Connection for 200 KVA |
| 50 | Cleaning tank, tubes, conservator tank etc., internal surface of and make them fit for use and painting with oil resistive paint excluding cost of paint per transformer for 200 KVA |
| 51 | Cleaning, scraping the external surface of the transformer and painting with good quality Siemens grey paint with two coats excluding cost of paint per transformer for 200 KVA |
| 52 | Charges for hot oil circulation after filling for 200 KVA |
| 53 | Drying out of the repaired core after assembling the coils for 200 KVA |
| 54 | Welding per cm for 200 KVA |
| 55 | Total amount for repairing of 11KV, 200KVA Distribution Transformer (B) |
| 56 | HV Coil SE Copper / Kg for 315 KVA |
| 57 | H.T. Bushings Insulator (I.S. 3347 ) for 315 KVA |
| 58 | L.T. Bushings Insulator(I.S. 3347) for 315 KVA |
| 59 | H.T. Rod (Brass) with Metal parts (Brass) (IS 3347) for 315 KVA |
| 60 | L.T. Rod copper with Metal parts Brass each (IS. 3347) for 315 KVA |
| 61 | Breather for 315 KVA |
| 62 | Wheel valve of size 1 ¼”each (superior quality) for 315 KVA |
| 63 | New Transformer Oil per litre conforming I.S. No.335-1993 with latest amendments for 315 KVA |
| 64 | C.R.G.O Lamination for 315 KVA |
| 65 | Radiator Fins for 315 KVA |
| 66 | Tap switch Assembly for 315 KVA |
| 67 | Inter coil Insulation per limb for 315 KVA |
| 68 | Re-insulation of L.V. Coils for 315 KVA |
| 69 | Oil Resistance Paint for inner side of Tanks per Transformer for 315 KVA |
| 70 | Gray Paint for outer side of Distribution Transformer for 315 KVA |
| 71 | Gasket for tank cover / Transformer for 315 KVA |
| 72 | Loading of Distribution Transformers at Department site, Transportation and unloading Distribution Transformers at Factory site per Transformer for 315 KVA |
| 73 | Opening, lifting the core and re-Examination: Per Transformer for 315 KVA |
| 74 | Positioning the core back after repair, and complete electrical connection, replacing gaskets and boxing up with top cover for each repairable Transformer for 315 KVA |
| 75 | Electrical connections: Star Connection for 315 KVA |
| 76 | Electrical connections : Delta Connection for 315 KVA |
| 77 | Cleaning tank, tubes, conservator tank etc., internal surface of and make them fit for use and painting with oil resistive paint excluding cost of paint per transformer for 315 KVA |
| 78 | Cleaning, scraping the external surface of the transformer and painting with good quality Siemens grey paint with two coats excluding cost of paint per transformer for 315 KVA |
| 79 | Charges for hot oil circulation after filling for 315 KVA |
| 80 | Drying out of the repaired core after assembling the coils for 315 KVA |
| 81 | Welding per cm for 315 KVA |
| 82 | Total amount for repairing of 11KV, 315KVA Distribution Transformer (C ) |
| 83 | HV Coil SE Copper / Kg for 630 KVA |
| 84 | H.T. Bushings Insulator (I.S. 3347 ) for 630 KVA |
| 85 | L.T. Bushings Insulator(I.S. 3347) for 630 KVA |
| 86 | H.T. Rod (Brass) with Metal parts (Brass) (IS 3347) for 630 KVA |
| 87 | L.T. Rod copper with Metal parts Brass each (IS. 3347) for 630 KVA |
| 88 | Breather for 630 KVA |
| 89 | Wheel valve of size 1 ¼”each (superior quality) for 630 KVA |
| 90 | New Transformer Oil per litre conforming I.S. No.335-1993 with latest amendments for 630 KVA |
| 91 | C.R.G.O Lamination for 630 KVA |
| 92 | Radiator Fins for 630 KVA |
| 93 | Tap switch Assembly for 630 KVA |
| 94 | Inter coil Insulation per limb for 630 KVA |
| 95 | Re-insulation of L.V. Coils for 630 KVA |
| 96 | Oil Resistance Paint for inner side of Tanks per Transformer for 630 KVA |
| 97 | Gray Paint for outer side of Distribution Transformer for 630 KVA |
| 98 | Gasket for tank cover / Transformer for 630 KVA |
| 99 | Loading of Distribution Transformers at Department site, Transportation and unloading Distribution Transformers at Factory site per Transformer for 630 KVA |
| 100 | Opening, lifting the core and re-Examination: Per Transformer for 630 KVA |
| 101 | Positioning the core back after repair, and complete electrical connection, replacing gaskets and boxing up with top cover for each repairable Transformer for 630 KVA |
| 102 | Electrical connections: Star Connection for 630 KVA |
| 103 | Electrical connections : Delta Connection for 630 KVA |
| 104 | Cleaning tank, tubes, conservator tank etc., internal surface of and make them fit for use and painting with oil resistive paint excluding cost of paint per transformer for 630 KVA |
| 105 | Cleaning, scraping the external surface of the transformer and painting with good quality Siemens grey paint with two coats excluding cost of paint per transformer for 630 KVA |
| 106 | Charges for hot oil circulation after filling for 630 KVA |
| 107 | Drying out of the repaired core after assembling the coils for 630 KVA |
| 108 | Welding per cm for 630 KVA |
| 109 | Total amount for repairing of 11KV, 630KVA Distribution Transformer (D) Total amount for repairing of 13 Nos. of 11 KV sick Distribution Transformers (3 Nos. of 100 KVA, 5 Nos. of 200 KVA, 3 Nos. of 315 KVA and 2 Nos. of 630 KVA) (A+B+C+D) Please Enable Macros to View BoQ information |