|
| 1 | TOTAL |
| 2 | Supply and fixing of 230V indicating lamps (red, blue ,& yellow colour) |
| 3 | Supply and delivery Modular Push button actuators (with plastic front ring),Illuminated actuator (with holder for contact block) -a) Normal, colour: Red, green, blue, Amber white, yellow, clear (Make: L&T/ABB/ Schneider/Simence/ GE) |
| 4 | Supply and fixing of analog Ammeter ranging 0-100Amps having C.R ratio of 100/5A, 144 mm sq size(Make : AE/KAPPA/IMP). |
| 5 | Supply and fixing of analog voltmeter ranging from 0-500 V of 144 mm sq size (Make: AE/KAPPA/IMP). |
| 6 | Supply and installation of Motor Protection Relay (MPR) - MM10 (L&T) or equivalent, with provision for monitoring phase failure, unbalance, overcurrent, and locked rotor protection and also necessary connection to be completed. (Make-L&T/Siemens/ABB or equivalent) |
| 7 | Supply and replacement of spare contact kit for power contactor MNX70 (Make-L&T/Schneider/Siemens or equivalent) including installation required to be done. |
| 8 | Supply and replacement of spare contact kit for power contactor MNX50 (Make-L&T/Schneider/Siemens or equivalent) including installation required to be done. |
| 9 | Supply ,delivery and fixing of 1.5 sq mm 1.1KV grade single core FR PVC insulated unsheated annealed copper conductor flexible cable. (Make- Havells/Finolex/Polycab or any reputed brand) |
| 10 | Supply fitting and fixing of insulated ring type protection CT having ratio of 100/5 A, 2 VA ,accuracy class -5P10 and also necessary electrical connection required to be done. |
| 11 | Thorough dismantling of the defective components, worn out wiring and other damaged parts from each starter panel without damaging the other components by engaging a skilled Electrician. |
| 12 | Repairing, servicing and overhauling of the control wiring by using 1.5 sq mm, 1.1 kV grade single core flexible copper cable (as required) and also supply and fixing of appropriate size terminal block ,nuts-bolts, sockets, lugs, etc for each motor starter panel. Necessary electrical connection required to be done. |
| 13 | Complete inspection and testing of the components and electrical connection in the starter panel, both power and control sides and also trial runs of the motor need to be performed to check proper functioning of the starter panels upto satisfiction of EIC. Please Enable Macros to View BoQ information |