Supply Of aerosol fire detection & suppressions system
Tender Overview
Project Description
Supply Of aerosol fire detection & suppressions system , supply & installation of aerosol fire detection & suppressions system cartridge 20gm(1no) pr ovided in power panel of non ac lhb coaches in line with technical parameters as per rdso letter no. el/7. 1.108/mssbc dt. 12.05.2022, & edml-0184 and rdso approved makes only. all necessary modifications & accessories required for the installation of this item shall be within the scope of the supplier. action temper ature shall be 68 to 72 degree celsius.installation of this item shall be with the scope of the sup plier. eligibility criteria: 1) rdso approved makes for aerosol fire detection & suppression s ystem- oem (viz. firepro/stat-x/pyrogen/dspa bv.) and their authorized dealers shall only be considered.sample may got approved before bulk supply. [ warranty period: 30 months after the date of delivery ] ] , supply & installation of aerosol fire detection & suppressions system cartridge 100gm provid ed in non ac lhb coaches in line with technical parameters as per railway board letter no. 2000/elect. (g) /113/4/safety dated 30.06.2022 & rdso letter no ell7.1.108/mssbc dated 17.09.2021 and rdso approved makes only. all necessary modifications & accessories required for the installation of this item shall be with in the scope of the supplier. action temperature shall be 68 to 72 degree celsius.installation of this item shall be with the scope of the supplier. eligibility criteria: 1) rdso approved makes for aerosol fire detection & suppression system- oem (viz.firepro/stat-x/pyrogen/dspa bv.) and t heir authorized dealers shall only be considered.sample may got approved before bulk supply. [ warranty period: 30 months after the date of delivery ] ]
BOQ
| Sl. No. | Item Description |
|---|---|
| 1 | Supply & Installation of aerosol fire detection & suppressions system cartridge 20GM(1No) pr ovided in power panel of Non AC LHB coaches in line with technical parameters as per RDSO letter no. EL/7. 1.108/MSSBC Dt. 12.05.2022, & EDML-0184 and RDSO approved makes only. All necessary modifications & accessories required for the installation of this item shall be within the scope of the supplier. Action temper ature shall be 68 to 72 degree Celsius.INSTALLATION OF THIS ITEM SHALL BE WITH THE SCOPE OF THE SUP PLIER. ELIGIBILITY CRITERIA: 1) RDSO APPROVED MAKES FOR AEROSOL FIRE DETECTION & SUPPRESSION S YSTEM- OEM (VIZ. FIREPRO/STAT-X/PYROGEN/DSPA BV.) AND THEIR AUTHORIZED DEALERS SHALL ONLY BE CONSIDERED.Sample may got approved before bulk supply. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 2 | Supply & Installation of aerosol fire detection & suppressions system cartridge 100GM provid ed in Non AC LHB coaches in line with technical parameters as per Railway Board Letter No. 2000/Elect. (G) /113/4/Safety dated 30.06.2022 & RDSO letter no ELl7.1.108/MSSBC dated 17.09.2021 and RDSO approved makes only. All necessary modifications & accessories required for the installation of this item shall be with in the scope of the supplier. Action temperature shall be 68 to 72 degree Celsius.INSTALLATION OF THIS ITEM SHALL BE WITH THE SCOPE OF THE SUPPLIER. ELIGIBILITY CRITERIA: 1) RDSO APPROVED MAKES FOR AEROSOL FIRE DETECTION & SUPPRESSION SYSTEM- OEM (VIZ.FIREPRO/STAT-X/PYROGEN/DSPA BV.) AND T HEIR AUTHORIZED DEALERS SHALL ONLY BE CONSIDERED.Sample may got approved before bulk supply. [ Warranty Period: 30 Months after the date of delivery ] ] |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 days