| 1 | Surface dressing of the ground including removing vegetation and in- equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m |
| 2 | Clearing jungle including up rooting of rank vegetations grass,push wood trees and samplings of grith upto 30 cms measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of area cleared |
| 3 | Tractor with trolly including POL and driver.for Surface Dressing and Jungle Cleaning |
| 4 | Supply of labour SOR-2020/ SI NO-12 |
| 5 | water tanker with sprinkler 6000 lit. or above cap.with POL/Drier Including filling of water etc. |
| 6 | Tractor with water tanker with Cost of Water Including POL with Driver etc. |
| 7 | Providing hydraulic excavator cum loader including POL & driver 1 cum bucket |
| 8 | Excavation (by machnical/manual mean) in foundation in mixed soil with Moorum, shingle, kankar, bricks (requiring the use of special tools and plant such as pickaxes, sabbals etc.) including lift up to 1.5m and lead up to 30m. and including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth ad directed by the Engineer in charge up to a distance of 30m. from the foundation trenches including all T&P phowarah and basket etc. complete |
| 9 | Cartage of Surplus Earth, Ballast, Kankar Coal, Grit or Sand including loading & Unloading etc. complete |
| 10 | Cement Concrete with 2 cm gauge approved stone ballast coarse sand & cement in the proportion of 1:2:4 including supply of all materials labour tools & plants etc reguired for proper complection of the work |
| 11 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete As per DSR 2023/13.80 |
| 12 | Painting or varnishing work in small areas or new wood work with one coat (upto one square metre of ready mixed priming paint and one coat of approved superior quality ready mixed paint or varnish including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. Paint to be used should confirm the ISI no. 103-1950 |
| 13 | Cement Concrete with 4 cm gauge approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & plants etc reguired for proper complection of the work |
| 14 | First class Brick Work in 1:4 cement & coarse sand 1.25 F.M. mortar in foundation and plinth including supply of all materials. labour and T&P etc. requried for proper completion of the work. SOR 6.02 |
| 15 | Distempering (first coat) with oil bound distemper of approved brand and manufacture and of required shade on undecorated wall surface to give an even shade over and including a every coat after the First Coat with cement primer of approved brand and manufacture such as Berger, J&N, Shalimar, Asian Paint after thoroughly brushing the surface free from mortar dropping and other foreign matters and also sand papered smooth including supply of all materials, labour, Tools & plants etc. required for proper completion of the work |
| 16 | Providing and laying 80 mm thick cement concrete paver block of M-35 grade with approved colour, design & pattern. factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50 mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge. |
| 17 | 12 mm thick Plaster with Cement and Coarse sand of 1.25 fineness modules in 1:4 over brick work minimum thickness not to be lessthen 1 Cm including supply of all materials, labour, tools & Plants etc required for proper completion of the work. |
| 18 | R.C.C. work with cement, approved coarse sand & 20mm approved stone ballast in proportion of 1:1.5:3 in Slab including aupply all materials but excluding supply of reinforcement & its bending but including its fixing in position & binding the same with 24 BWG GI binding wire & including the cost of binding wire & including providing & fixing necessary centering & shuttering & its removal after completion of work & supply of all other materials, labour T&P etc.required for proper completion of work. SI No. 5.1 |
| 19 | S/F M:S (tor steel or plain) in plain work such as R:C:C work including bending for proper shape as necessary including bending for proper completion of the work and including supply of all steel & wastage, bend, hooks, and authorised overlapping shall be measured etc all complete as per direction of engineer in charge. |
| 20 | Earth work in cutting or in embankment in ordinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5 m lift and 30m lead. The earth in form of cutting to be used as spoil banks within 50m distance as directed by the Engineer-in- Charge. Lead Upto 10 Kms. |
| 21 | Painting roofs or other iron work in large areas with one coat priming and one coat of approved (above one Sq. Metre) paint (British antesol or equivalent) including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. Paint to be used should confirm the ISI no. 103-109. |
| 22 | M.S. or iron work of small sizes and section such as holding down bolts, hold fast, tie rods grating etc. wrought to required from including supply of steel bolts, nuts wastage etc. and their fixing required for proper completion of the work. As per SOR No. 502 |
| 23 | Providing and applying tack coat on bituminious surface @ 0.20Kg/Sqm. Bitumen of grade VG-10, includig heating the bitumen, spraying the bitumen the mechanical operated spary unit fitted on bitumen boiler, cleaning and preparing the exiting road surface as per specifications.(As per Analysis Attached) |
| 24 | Providing and laying bituminous concrete 40 mm thick with higher capacity batch type hot mix plant using crushed aggregates of specified grading , premixed with bituminous binder @ 5.0 per cent of mix and filler , transporting the hot mix to work site , laying with a hydrostatic paver finisher with sensor control to the required grade , level and alignment , rolling with smooth wheeled , vibratory and tandem rollers achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects . As per CRRI Recommendation ( As per Sanctioned JOB No. CD-I (114) Dated 29.08.2024 ) |
| 25 | Providing and fixing 1mm thick M.S. Angles r with frame of 40x40x6mm (1 1/2\\"x 1 1/2\\"x1/4\\") angle iron 3.15 mm (1/8\\") thick M.S. gusset plate at the junction and corners including supply and fixing of necessary fittings. Lock rail of 15\\" length of oxidised iron and including pintels hooks at the top and applying priming coat of red lead paint on all sides complete. Please Enable Macros to View BoQ information |