| 1 | The work of cutting and removing the wornout pipe line from half inch to 12 inches dia and installing the new pipe at the same place | The work of cutting and removing the wornout pipe line from half inch to 12 inches dia and installing the new pipe at the same place |
| 2 | Fabricating and replacing wornout bands nipples crosses reducer with new one from half inch dia to 12 inches dia | Fabricating and replacing wornout bands nipples crosses reducer with new one from half inch dia to 12 inches dia |
| 3 | Renovation work of half inch to 12 inch diameter coils | Renovation work of half inch to 12 inch diameter coils |
| 4 | The work of fabricating and installing new flanges of 6 to 12 inches diameter | The work of fabricating and installing new flanges of 6 to 12 inches diameter |
| 5 | The work of cutting and removing the 14 inch to 40 inch wornout pipe line and fabricating a new one and installing it at the same place | The work of cutting and removing the 14 inch to 40 inch wornout pipe line and fabricating a new one and installing it at the same place |
| 6 | Cutting and removing wornout bands nipples crosses tees reducer with new one from 14 inches to 40 inches dia and fabricating new ones and installing them at the same place | Cutting and removing wornout bands nipples crosses tees reducer with new one from 14 inches to 40 inches dia and fabricating new ones and installing them at the same place |
| 7 | The work of making and installing new flanges of 14 inches to 40 inches diameter in place of warn out flanges | The work of making and installing new flanges of 14 inches to 40 inches diameter in place of warn out flanges |
| 8 | fabricate the round and square tank in the mill and installed it and put all the connections up to 01 meter | fabricate the round and square tank in the mill and installed it and put all the connections up to 01 meter |
| 9 | fabricate the round and square tank in the mill and installed it and put all the connections above 1 meter diameter | fabricate the round and square tank in the mill and installed it and put all the connections above 1 meter diameter |
| 10 | Strengthening with heavy structures at various places | Strengthening with heavy structures at various places |
| 11 | Strengthening with light structures at various places | Strengthening with light structures at various places |
| 12 | Strengthening and repairing wornout platform at various places | Strengthening and repairing wornout platform at various places |
| 13 | Making and replacing manholes at various places | Making and replacing manholes at various places |
| 14 | replacing old and wornout cones at various places with new one and making it with 8 or 10 mm ms plate installing up to 01 meter | replacing old and wornout cones at various places with new one and making it with 8 or 10 mm ms plate installing up to 01 meter |
| 15 | replacing old and wornout cones at various places with new one and making it with 8 or 10 mm ms plate installing Above 01 meter | replacing old and wornout cones at various places with new one and making it with 8 or 10 mm ms plate installing Above 01 meter |
| 16 | Making and replacing wornout casing with newone and making it with 6 or 8mm ms plate at various places of fan | Making and replacing wornout casing with newone and making it with 6 or 8mm ms plate at various places of fan |
| 17 | Making and installing catchers at various stations including all connections | Making and installing catchers at various stations including all connections |
| 18 | Patching work of wornout equipment at various stations | Patching work of wornout equipment at various stations |
| 19 | Replacing wornout truff of cane carrier baggase elivatore and rbc with new ms plate | Replacing wornout truff of cane carrier baggase elivatore and rbc with new ms plate |
| 20 | replacing wornout side plate with new ms plate of various places | replacing wornout side plate with new ms plate of various places |
| 21 | Replacing wornout runner base and installing a new runner base of Cane Carrier and Baggage Elevator and R B C | Replacing wornout runner base and installing a new runner base of Cane Carrier and Baggage Elevator and R B C |
| 22 | Replacing wornout runner with new one of Cane Carrier and Baggage Elevator and R B C | Replacing wornout runner with new one of Cane Carrier and Baggage Elevator and R B C |
| 23 | Removing wornout angle iron and T iron of the cane carrier and reinstalling it by straightening the crooked part | Removing wornout angle iron and T iron of the cane carrier and reinstalling it by straightening the crooked part |
| 24 | Removing the wornout part of the suit from different places and fitting it with new one | Removing the wornout part of the suit from different places and fitting it with new one |
| 25 | Chevron grooving of new rollers of the mill | Chevron grooving of new rollers of the mill |
| 26 | Chevron grooving of old rollers of the mill | Chevron grooving of old rollers of the mill |
| 27 | Remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it | Remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it |
| 28 | Installing ribs at the top and bottom partitions of the juice heater | Installing ribs at the top and bottom partitions of the juice heater |
| 29 | Repairing save all of qurdbody | Repairing save all of qurdbody |
| 30 | Removing old wornout gutters installed at various places and installing it with new gutters | Removing old wornout gutters installed at various places and installing it with new gutters |
| 31 | Remove the old wornout save all from pan and quard and install it with new one | Remove the old wornout save all from pan and quard and install it with new one |
| 32 | Reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one | Reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one |
| 33 | Replacement ribbon arm of the mascute receiving crystallizer | Replacement ribbon arm of the mascute receiving crystallizer |
| 34 | Making new separator of A Centrifugal machine | Making new separator of A Centrifugal machine |
| 35 | Removing the wornout truff of the hopper and installing it with new one | Removing the wornout truff of the hopper and installing it with new one |
| 36 | Making and installing new separators for continuous centrifugal machines | Making and installing new separators for continuous centrifugal machines |
| 37 | Removing the tubes of Quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of Size 42 mm | Removing the tubes of Quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of Size 42 mm |
| 38 | Removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of Size 96 mm | Removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of Size 96 mm |
| 39 | Removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates | Removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates |
| 40 | Removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate | Removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate |
| 41 | Removing the damaged boiler damper and installing a new one | Removing the damaged boiler damper and installing a new one |
| 42 | Making bagasse suit and installing. | Making bagasse suit and installing. |
| 43 | Replacement of juice over flow box of clarifier | Replacement of juice over flow box of clarifier |
| 44 | Making and installing bed of motor and pumps at various places as per requirement | Making and installing bed of motor and pumps at various places as per requirement |
| 45 | Replacement 6 inch dia cooling pipe of sulfur furnace | Replacement 6 inch dia cooling pipe of sulfur furnace |
| 46 | Removing the monitor casing of A machine from old machine and installing it and giving its a trial | Removing the monitor casing of A machine from old machine and installing it and giving its a trial |
| 47 | Making amd replacing manholes at various places | Making amd replacing manholes at various places |
| 48 | Making and replacing the enternals of cather of the pan. | Making and replacing the enternals of cather of the pan. |
| 49 | Making and replacing the new hood of cane cutter | Making and replacing the new hood of cane cutter |
| 50 | Removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial | Removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial |
| 51 | Reinstalling the stirrer of the clarifier and giving a satisfactory trial | Reinstalling the stirrer of the clarifier and giving a satisfactory trial |
| 52 | Removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones | Removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones |
| 53 | Removing and refitting the shaft of a Brown Sugar Magma mixer and installing with new bush | Removing and refitting the shaft of a Brown Sugar Magma mixer and installing with new bush |
| 54 | Reinstalling the trufff of connecting rod of the hopper | Reinstalling the trufff of connecting rod of the hopper |
| 55 | Making and installing new catcher strainer | Making and installing new catcher strainer |
| 56 | Removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level | Removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level |
| 57 | Reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc | Reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc |
| 58 | Removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement | Removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement |
| 59 | Cutting and straightening old plates installed at various places as per requirement | Cutting and straightening old plates installed at various places as per requirement |
| 60 | Removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections | Removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections |
| 61 | Removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial | Removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial |
| 62 | Re-installation alignment and trial of hopper driving end | Re-installation alignment and trial of hopper driving end |
| 63 | Making and installing the top cover of the centrifugal machine | Making and installing the top cover of the centrifugal machine |
| 64 | Making an arm and installing it on the shaft of pug mill | Making an arm and installing it on the shaft of pug mill |
| 65 | Making and installing scrubber and bottle jackets of sulfur furnace | Making and installing scrubber and bottle jackets of sulfur furnace |
| 66 | Making and installing drum type sulfur furnace | Making and installing drum type sulfur furnace |
| 67 | Cutting out the corroded save all and making and fitting it with a new plate | Cutting out the corroded save all and making and fitting it with a new plate |
| 68 | Modify the juice sulfiter by reducing the cell diameter as per the drawing | Modify the juice sulfiter by reducing the cell diameter as per the drawing |
| 69 | Removing the screen of Old DSM and fitting a new one and replacing its wornout frame | Removing the screen of Old DSM and fitting a new one and replacing its wornout frame |
| 70 | Removing the wornout mixed juice spreader installed in the mill and installing a new one as per the instructions | Removing the wornout mixed juice spreader installed in the mill and installing a new one as per the instructions |
| 71 | Cleaning all the tubes of the transient heater and giving hydraulic testing | Cleaning all the tubes of the transient heater and giving hydraulic testing |
| 72 | Replacement and straighthening of wornout plate of unloader trolley | Replacement and straighthening of wornout plate of unloader trolley |
| 73 | Cutting out the corroded juice tray of Mill and installing a new one and giving satisfactory trial | Cutting out the corroded juice tray of Mill and installing a new one and giving satisfactory trial |
| 74 | Installing guides on both sides of the chain near the cutter in the cane carrier | Installing guides on both sides of the chain near the cutter in the cane carrier |
| 75 | Making and Replacing of wornout suit with new one of cane carrier | Making and Replacing of wornout suit with new one of cane carrier |
| 76 | Dismantling the wornout catcher of the quad s fourth body and making and installing its with new 8 mm plate | Dismantling the wornout catcher of the quad s fourth body and making and installing its with new 8 mm plate |
| 77 | Removing old and damaged gear of vacuum crystallizer and installing new gear doing alignment and giving satisfactory trial | Removing old and damaged gear of vacuum crystallizer and installing new gear doing alignment and giving satisfactory trial |
| 78 | Making and installing the oil tray of mill house with new one. | Making and installing the oil tray of mill house with new one. |
| 79 | Making new frame of inter carrier using 8 mm plate and angle and channel | Making new frame of inter carrier using 8 mm plate and angle and channel |
| 80 | Straightening of wornout columns of cane carrier and bagasse carrier approx 2 fit hight | Straightening of wornout columns of cane carrier and bagasse carrier approx 2 fit hight |
| 81 | Repairing central saft of dorr | Repairing central saft of dorr |