| 1 | Clearing of Grass and removal of rubbish upto a distance of 50m outside the periphery of the area including cost of labour T&P etc complete as per the direction of the Engineer-in-Charge |
| 2 | Earth work in excavation of foundation in ordinary soil including dressing and leveling the bed to required profile for receiving the sand filling and concrete and depositing the excavated materials away from the working area with all leads, lifts & delifts etc complete as per the direction of the Engineer-in-Charge |
| 3 | Collecting, conveying and stacking river sand at work site & filling foundation & plinth with sand well watered & rammed with cost, carriage, royalty of all materials etc complete as per the direction of the Engineer-in-Charge |
| 4 | Cement concrete M-15 using 40mm size & downgraded crusher broken hard granite chips from approved quarry free from weathered skin and dusts mixed with screen and washed sharp coarse river sand and port land cement of ISI standard and grade as approved by the department including finishing and watering for curing for a period as approved by the department including all cost, carriage, royalty, taxes of materials etc complete as per the direction of the Engineer-in-Charge |
| 5 | Cement concrete M-25 using 20mm size & downgraded crusher broken hard granite chips from approved quarry free from weathered skin and dusts mixed with screen and washed sharp coarse river sand and port land cement of ISI standard and grade as approved by the department including finishing and watering for curing for a period as approved by the department including all cost, carriage, royalty, taxes of materials etc complete as per the direction of the Engineer-in-Charge |
| 6 | Rigid smooth centering & shuttering for PCC/RCC work including false works and dismantling them after required days of casting including cost, carriage, and all other taxes etc complete as per the direction of the Engineer-in-Charge |
| 7 | Filling foundation and plinth with excavated materials including watering and ramming with all cost, labour T&P etc complete as per the direction of the Engineer-in-Charge |
| 8 | Supplying, fitting and placing uncoated HYSD bar reinforcement with cutting, bending, binding, straightening, tying the grills and placing in positing as per drawing & technical specification with cost & conveyance of M.S rod and binding wire 18 to 20 gauge, cost of labours, T&P required for the work etc complete as per the direction of the Engineer-in-Charge |
| 9 | Providing stone riprap (lunching) to the slopes of earth dam and dyke with quarred and blasted granite stone boulders not less than 0.30m and above size including dumping on slope filling interstices with small stones & weadges and packing sufface to proper line and levels including fixing wave breakers complete with cost, conveyance, royalty and transportation of all materials of approved quality and from approved quarry with all leads, lifts, delifts etc. and all other incidental charges required to complete the work as per the specification and direction of Engineer-in-Charge. (Measurement will be taken on finished level section). |
| 10 | Collecting, conveying, stacking good quality of hard granite stone boulder from approved quarry Rough stone dry packing in aprons and revetment with hard stone (above 0.003cum size) including cost, carriage, royalty of all materials etc complete as pert he direction of the Engineer-in-Charge |
| 11 | Reinforcement Cement concrete M-20 using 20mm size & downgraded crusher broken hard granite chips from approved quarry free from weathered skin and dusts mixed with screen and washed sharp coarse river sand and port land cement of ISI standard and grade as approved by the department including finishing and watering for curing for a period as approved by the department including all cost, carriage, royalty, taxes of materials etc complete as per the direction of the Engineer-in-Charge Please Enable Macros to View BoQ information |