| 1 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 2 | Erecting one LT PSC Pole in position including digging & back filling pit in ordinary soil. |
| 3 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 4 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 5 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 6 | Renewal of existing damaged/old LT PSC/RCC (single phase line) pole with new PSC pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items except street light fitting etc. and conveyance of all materials except pole. |
| 7 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 8 | Straightening one slanted LT pole after unbinding the line and binding the line after work. |
| 9 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires. |
| 10 | Providing Fly stay for LT pole using LT PSC pole including digging and back filling pit in ordinary soil. |
| 11 | Providing Stay for LT poles including digging & back filling pit in ordinary soil. |
| 12 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 13 | Renewal of existing damaged/broken old LT stay in existing stay rod. |
| 14 | Providing Strut using LT PSC pole including digging and back filling pit in ordinary soil. |
| 15 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 16 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 17 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane |
| 18 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 19 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 20 | Erection of suspension clamp for LT ABC of any size |
| 21 | Installation of Pre-insulated straight through joints for 16sqmm cable |
| 22 | Installation of Pre-insulated straight through joints for 70sqmm cable |
| 23 | Installation of Pre-insulated straight through joints for 50sqmm cable |
| 24 | Installation of Insulation piercing connector for main to service line main:16-95 sqmm, Tap 16-95 sqmm |
| 25 | Installing One No. Insulation piercing connector of size Main :16 to 95 ,Tap:1.5 to 16 Sq.mm |
| 26 | Fitting of one No. pole top service connection box of standard size (up to 4 way) using ss strap/B&N of suitable size in to the PSC/A poles at the standard height excluding giving connections |
| 27 | Quoted Amount of BOQ1 in figures |
| 28 | GST Rate in percentage Please Enable Macros to View BoQ information |