| 1 | Earth work in excavation for laying of different types and sizes of R.C.C. spun pipes with disposal of excavated earth within intial lead and lift as per specification and direction of E/I. (I). For classification of soil item-A (3.3.1) |
| 2 | Providing course clean sand in filling in foundation tranches or in plinth including ramming and watering in layer not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building a specification and direction of E/I.(5.1.10) |
| 3 | Providing designation 75B one brick on flat soling joints filled with local sand including cost of watering taxes royality all complete. buiniding specifiacation and as per direction of E/I.(5.6.3) |
| 4 | Supplying 300 mm dia NP2 RCC Hume pipe with collar …..do…do…direction of E/I. |
| 5 | Providing labour for fitting and fixing 300 mm dia NP2 RCC Hume pipe …..do…do…direction of E/I.[3.3.6.4] |
| 6 | Earthwork in back filling the trench after laying different types and sizes of R.C.C. spun pipes …do..do..E/I.[3.3.2] |
| 7 | Disposal of excavated earth in borrow area of lead 1km(k) +2km(p) |
| 8 | Providing and laying PCC M-20 with nominal mix (1:1.5:3)in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :[5.3.1.1] |
| 9 | Providing designation 75 B brick work with c.m (1:6) in foundation ......... do ........ do ...........E/I. [5.2.6] |
| 10 | Plastering of 12 mm thickness with c.m [1:6] ......... do ........ do ...........E/I. [5.7.3] |
| 11 | Providing 1.5 mm cement punning ......... do ........ do ...........E/I. [5.7.11] |
| 12 | Providing precast rcc slab of m - 20 with nominal mix (1:1.5:3) on prepared chamber ......... do ........ do ...........E/I. [5.3.4] |
| 13 | Providing TMT reinforcement bar ......... do ........ do ...........E/I. |
| 14 | 12 mm dia main bar [5.5.5 b] |
| 15 | 10 mm dia longitudinal bar [5.5.5 a] |
| 16 | making connection of drain or sewer line with existing manhole including breaking into and making good the walls, floors with cement concrete for pipes 100 to 250mm dia do……………do………as per direction of E/I.[dsr-19.21.2] |
| 17 | Providing and laying 80mm factory made cement concrete interlocking paver block of M40 grade made by block making machine with strong vibratory compaction of approved size,design and shape,laid in required colour and pattern over bed as per relevant IRC code,filling the joints with fine sand etc. all complete as per the direction of Engineer in Charge.[JHSOR Corrigendum Item No4.23B] |
| 18 | Carriage of Materials |
| 19 | Sand 1Km(K) + 5Km(P) |
| 20 | Chips 1Km(K) + 40Km(P) |
| 21 | Bricks 1Km(K) + 14Km(P) |
| 22 | Reinforcement bar 5 Km(P) |
| 23 | Hume Pipe 5Km(P) |
| 24 | Cement 5Km(P) |
| 25 | Add 18% GST |
| 26 | Adding Labour Cess @ 1% |
| 27 | For Sign board and Photography Please Enable Macros to View BoQ information |