| 1 | Dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads complete as per direction of E/I. |
| 2 | Dismantling plain cement or lime concrete work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads complete as per direction of E/I. |
| 3 | Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 M. including all lifts, levelling, ramming the foudation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/l. |
| 4 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering royalty and taxes all complete as per building specification and direction of E/I |
| 5 | Providing designation 75 B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/l.(75MM THK) |
| 6 | Centering & shuttering including strutting propping etc.and removal of form work foundation ,footing bases of column etc. for mass concret |
| 7 | Providing and laying in position cement concrete specified grade of cement concrete excluding the cost of centering shuttering finishing and reinforcement - All works upto plinth level. 1:1.5:3 (1 cement: 1.5 coarse sand(zone III):3 graded stone concrete 20mm nominal size) |
| 8 | Providing tor steel reinforcement of 10mm,12mm & 16mm bars as per approved design and drawing.10mm fe 500 |
| 9 | Providing and fixing fan hooks of 16mm dia M.S. bar 1 meter long bent to required size and shape --do-- complete as per drawing and technical specification and direction of E/I. |
| 10 | Providing and placing in position 100 mm thick factory made machinebatched & machine mixed Precast RCC Rectangular Covers ondrains of footpath of various sizes, of M-25 grade cement concretefor RCC work, including cost of centering, shuttering, reinforcementof 8 mm dia TMT bars of Fe 500 grade @ maximum 100mm c/c onboth ways , neat cement punning on finished surface, properlyencased on all edges with 1.6 mm thick , 100 mm wide MS sheetduly painted over priming coat , reinforcement to be welded at edgeswith MS sheet and providing 2 Nos. 12 mm dia bar for hooks etc i/ccost of cartage, all leads & lift, handling at site etc. all complete asper direction of Engineer-in-Charge. |
| 11 | Earth filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50mm and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted volume). |
| 12 | Carriage of MaterialsCement |
| 13 | Bricks |
| 14 | Stone Chips |
| 15 | Steel |
| 16 | Add GST @18% |
| 17 | Add Labour Cess @1% Please Enable Macros to View BoQ information |