| 1 | Implementation of ATCS and ITMS |
| 2 | Submission of Preliminary Project Plan and Agreement signing and submission of BG |
| 3 | Submission of designs, CAD drawings, execution plan,junction-wise assessment, and GVMC approval |
| 4 | Material Supply and Delivery - Approval of Quality assurance plan (QAP) for procurement of Materials by Customer & Delivery of materials at site/Central store with OEM certificates, inspection & verification |
| 5 | MTX 808.3 PCB set, SOM& NVME pair inserted, Heat sink mounted |
| 6 | Image sensor PCB with Lens Mount, IR cut filter & FFC cable 5MP/8MP based on site requirement |
| 7 | Light sensor PCB with tube & wires |
| 8 | Lightining protection PCB |
| 9 | IP 66 Housing - CBC LHI-X33D-BH |
| 10 | Fan + Grill |
| 11 | Internal cabinet - Metal enclosure |
| 12 | Lens 25mm/16mm - C mount: based on actual field requirement. |
| 13 | Military connector: 14 Pin Male part panel mount |
| 14 | DC FAN |
| 15 | DSUB connector |
| 16 | Silica or Desiccant Bags ( for fixing inside housing) |
| 17 | Wiring materials & fastners |
| 18 | LAN IP66 assembly - RDP-00DFFA-SLM7001 ( Make - Amphenol) |
| 19 | IR flash pulsed 350W/700W as per requirement with Motorized TILT option for easy night alignment, with Required Drivers, 48VDC input & Rs 485 dual exposure trigger input. |
| 20 | Sub Junction box IP65 as per drawing/requirement |
| 21 | Compact System controller |
| 22 | 4/5 Port Industrial switch – Giga Ethernet, 75 deg C operation |
| 23 | MIL & LAN cables, LAN protection for Sub Junction Box |
| 24 | Power supply for Sub Junction box |
| 25 | Lightning protection, Surge protector etc. |
| 26 | Main Junction Box for RLVD System - Outdoor Junction Box for field hardware units, with enough space to occupy - UPS with battery, Industrial network Switch, Edge processing units, power supplies, surge protector, lightning protection, wiring, cooling Fan etc. LIU, Power strip, etc. Size as per requirement. |
| 27 | Edge processing units 8/16GB Memory, 512GB/1TB Storage as per requirement |
| 28 | Industrial Network Switch 8Port/4Port based on requirement |
| 29 | Power supply for Main JB |
| 30 | Lightning protection, Surge protector etc. |
| 31 | Cables, power strip etc. |
| 32 | Cooling Fan |
| 33 | Main Junction box IP65 as per drawing/requirement |
| 34 | Main Junction box IP65 as per drawing/requirement for 2 x 8 MP Camera, 6x IR Illuminator Systems - |
| 35 | Edge processing units 8GB Memory, 512GB Storage |
| 36 | Edge processing units 16GB Memory, 1TB Storage |
| 37 | Compact System controller with : ARM Cortex M4 based system, full power control, IR sync with camera, watch dog functions, Industrial power supply with under / over voltage & Surge protection, high voltage boost drivers for IR illuminators |
| 38 | 8 Port Industrial switch – Giga Ethernet, 75 deg C operation |
| 39 | MIL & LAN cables, LAN protection for Sub Junction Box |
| 40 | Power supply for Sub Junction box |
| 41 | Lightning protection, Surge protector etc. |
| 42 | Supply of 8MP Camera for Face detection and recognition |
| 43 | Supply of PTZ Camera with NVR and HDD. |
| 44 | All additional IT hardware and field equipment required for the complete implementation of ITMS solution and Approval of Quality assurance plan (QAP) for procurement of Materials by GVMC & Delivery of materials at site/Central store with OEM certificates, inspection & verification (As per module 1,2,3,6 of GVMC Tender Document) |
| 45 | Supply of Jetson Orin NX 16GB, with carrier board |
| 46 | Supply of Enclosure for Itrams |
| 47 | Supply of chasis fan |
| 48 | SD Card 64GB |
| 49 | 10- Port POE switch |
| 50 | IP Camera(5mp, POE) |
| 51 | Cabinet for Itrams as per annexure 1 |
| 52 | Polycarbonate housing for LED Aspect - Make Essar Engineers |
| 53 | Hensel Box for Police Control Panel |
| 54 | Solid State Relays Make :ERI |
| 55 | Meanwell SMPS 24 |
| 56 | DC-DC converter -12V |
| 57 | Any additional IT hardware and field equipment required for the complete implementation of ATCS solution for 101 Junctions including new junctions and Approval of Quality assurance plan (QAP) for procurement of Materials by GVMC & Delivery of materials at site/Central store with OEM certificates, inspection & verification (As per module 4&5of GVMC Tender Document) |
| 58 | Installation & Integration Completion (All Modules) |
| 59 | Completion of installation Testing and commissioning of ITMS, FRS, FFDS, Command Center integration (As per module 1,2,3,6 of GVMC Tender Document) |
| 60 | Completion of installation of ATCS, Pedestrian Signals, (As per module 4&5of GVMC Tender Document) |
| 61 | System Testing & Final Acceptance Testing (FAT) |
| 62 | Completion of FAT, third-party audits, compliance to technical specifications (Module 1,2,3,6 of GVMC Tender Document) |
| 63 | Completion of FAT, third-party audits, compliance to technical specifications (Module 4&5 of GVMC Tender Document) |
| 64 | Go-Live & UAT Completion |
| 65 | Go Live and Integration of all systems UAT sign-off,dashboard integration, SLA compliance for first month(Module 1,2,3,6 of GVMC Tender Document) |
| 66 | Go Live and Integration of all systems UAT sign-off,dashboard integration, SLA compliance for first month(Module 4&5 of GVMC Tender Document) |
| 67 | Milestone based Annuity Componenet including deferred warranty (Module1,2,3,6 of GVMC Tender Document Payable in 10 Installments) |
| 68 | Milestone based Annuity Componenet including deferred warranty (Module 4&5) of GVMC Tender Document Payable in 10 Installments) |
| 69 | Operation and maintenance |
| 70 | On site warranty support of all field equipment, Operation and maintenance of project (Module 1,2,3,6 of GVMC Tender Document) (Half yearly) |
| 71 | On site warranty support of all field equipment, Operation and maintenance of project (Module 4&5 of GVMC Tender Document) (Half yearly) 0.0 |
| 72 | Module 1 – Detection of Violations on junctions (90Junctions) |
| 73 | Module 2 – Free flow traffic management system (14 Locations) |
| 74 | Module 3 - Facial Recognition system (12 Locations) |
| 75 | Module 4 –Adaptive Traffic Control System (ATCS) for 101 Junctions |
| 76 | Module 5 : Installation of Pedastrain signals at 5 selected locations |
| 77 | Module 6 – Command control Centre and Network |
| 78 | Operational Expenses for Year 1 |
| 79 | Module 1 |
| 80 | Module 2 |
| 81 | Module 3 |
| 82 | Module 4 |
| 83 | Module 5 |
| 84 | Module 6 |
| 85 | Operational Expenses for Year 2 |
| 86 | Module 1 |
| 87 | Module 2 |
| 88 | Module 3 |
| 89 | Module 4 |
| 90 | Module 5 |
| 91 | Module 6 |
| 92 | Operational Expenses for Year 3 |
| 93 | Module 1 |
| 94 | Module 2 |
| 95 | Module 3 |
| 96 | Module 4 |
| 97 | Module 5 |
| 98 | Module 6 |
| 99 | Operational Expenses for Year 4 |
| 100 | Module 1 |
| 101 | Module 2 |
| 102 | Module 3 |
| 103 | Module 4 |
| 104 | Module 5 |
| 105 | Module 6 |
| 106 | Operational Expenses for Year 5 |
| 107 | Module 1 |
| 108 | Module 2 |
| 109 | Module 3 |
| 110 | Module 4 |
| 111 | Module 5 |
| 112 | Module 6 0.0 Please Enable Macros to View BoQ information |