|
| 1 | Design, Supply, Installation, Testing & Commissioning of Automated Sewage Treatment Plant of capacity 4 KLD based on SBR Technology with tertiary treatment and two year DLP for Kochi Water Metro terminals at Willington Island. The plant consists of the following; 1. IoT Controller - Control unit with intranet webaccess microprocessor control with pre-set work cycles, real-time controlled, graphic display, operating hours’ counter, optional manual and automatic mode, acknowledgeable visual and acoustic fault message, mains failure alarm, logbook function operating levels, (operator, service, administrator)2. SBR Reactor- MSFRP Prefab reactor tank suitable for 4 KLD SBR STP and additional freeboard as per project needs3. Panel Board enclosure - Panel board (Class IP 55/65) for the enclosure of controller and necessary electrical equipment (MCB, indication lamps, measuing instruments, phase failure relay, MPCB, contactors) - 1 Unit4.Compressor / Side channel blower - Compressor / Side channel blower - 300 LPM, 0.33 Kw, 1~ - 1 Unit5. Diffusers in aeration tank - EPDM Fine bubble Tubular diffusers - 1m/.75m tubuler diffuser) with SOTE < 7.5%/m at a flow rate of 5cu.m/hr or equivalent - 4-6 No’s (As per tank dimensions)6. Diffuser stands - Diffusion system in SS 304 (8/6 outputs) stands - As per requirement and as per the tanks dimension,7. Airhose - Hose, PVC braided at 10 kg/ sq.cm at temperature rating of 85 deg. C - Appx. 50 m (Machine room <3m from aeration tank)8. Airlift units / mechanical pumps (as suitable) for transfer of water in collection tank , aeration and treated water tank - Air lift arrangement and functional mechanisms, technology - Minimum- 2 units or as required in the site; Charging process by Pump flow rate 3cu.m/hr @ 9m head - 1W + 1SDischarging unit by airlift - 1 Unit ; Sludge return unit by airlift - 1 Unit ; Collection tank to aeration tank - 1 unit (airlift / mechanical pump as suitable)9(a).Power, control & instrumentation cabling including heavy duty conduits - As per requirement in the site9(b). Earthing of the complete SBR system/ components as per the IS 3043.10. SS 304 pipe clamps - Clamps and fittings for wall mounting in SS 304 - As per requirement in the site. 11. Components for assembling and fixing solenoid valve set a) SS 304 output for valve arrangement (1”) (2 outputs / 3 outputs) - as per requirement b) Solenoid valve for airlift arrangement (1”) - 3 Units |
| 2 | 12.Valve stand for valves (SS 304, 2mm thickness) - 1 Unit13. Filtration Plant – Filter Feed Pump, Pressure sand filter, Activated Carbon Filter, AMPV and UV system suitable for 4 KLD plant - 1 Lot14. HDPE filter water tank having capacity of 2000 litres15. Design & construction of Machine room including all civil and MEP works as per scope and GFC drawings16. SITC of Pump for treated water with starter panel, CPVC pipeline upto OHT, removing of existing paver blocks, excavation, refilling, relaying of Paver Blocks17. Civil work for the transfer of sewerage and providing temporary arrangement for collection of sewage during the construction and disposal, shifting/re-routing existing utilities, earth mat. Earthwork in excavation and refilling, providing manholes with FRP manhole covers, core-cutting, pipe fittings, hose connections and modifying existing tank as required.18. Civil work for the modification of existing tank as required including removal of concrete top slab & rectification as required with FRP manhole cover .All as per the scope of works, drawings, detailed technical specifications and instructions of the Engineer in Charge.Payment shall be done as followsI. Design, Development and Approval of Good for Construction Drawing of MS-FRP SBR reactor STP that include all the necessary technical details in accordance with the Work requirements and Technical Specifications - 5%II. Supply, delivery of MS-FRP Prefab reactor, IoT Controller, Compressor / Side channel blower, Diffusers, Airlift units, solenoid valve set and all related accessories in accordance with the Work requirements and Technical Specifications - 20%III. Installation of SBR STP along with setting up of machine room with all necessary filtration systems at site including all civil and MEP works in accordance with the Work requirements and Technical Specifications - 25%IV. Testing and commissioning of the STP and providing the O&M manual, as-built drawings, test reports, water quality report, training for staff in accordance with the Work requirements and Technical Specifications .- 25%VI. Completion of all electrical, plumbing and finishing works in all respects and handover the STP and other infrastructure in all respects in accordance with the Work requirements and Technical Specifications - 25% |
| 3 | Design, Supply, Installation, Testing & Commissioning of Automated Sewage Treatment Plant of capacity 4 KLD based on SBR Technology with tertiary treatment and two year DLPfor Kochi Water Metro terminal at Kadamakudy. The plant consists of the following; 1. IoT Controller - Control unit with intranet webaccess microprocessor control with pre-set work cycles, real-time controlled, graphic display, operating hours’ counter, optional manual and automatic mode, acknowledgeable visual and acoustic fault message, mains failure alarm, logbook function operating levels, (operator, service, administrator) 2. Panel Board enclosure - Panel board (Class IP 55/65) for the enclosure of controller and necessary electrical equipment’s (MCB, indication lamps, measuing instruments, phase failure relay, MPCB, contactors) - 1 Unit 3.Compressor / Side channel blower - Compressor / Side channel blower - 300 LPM, 0.33 KW, 1~ - 1 Unit 4. Diffusers in aeration tank - EPDM Fine bubble Tubular diffusers - 1m/.75m tubuler diffuser) with SOTE < 7.5%/m at a flow rate of 5cu.m/hr or equivalent - 4-6 No’s (As per tank dimensions) 5. Diffuser stands - Diffusion system in SS 304 (8/6 outputs) stands - As per requirement and as per the tanks dimension6. Airhose - Hose, PVC braided at 10 kg/ sq.cm at temperature rating of 85 deg. C - Appx. 50 m (Machine room <3m from aeration tank)7. Airlift units / mechanical pumps (as suitable) for transfer of water from collection tank, aeration and treated water tank - Air lift arrangement and functional mechanisms, technology - Minimum- 2 units or as required in the site; Charging process by Pump flow rate 3cu.m/hr @ 9m head - 1W + 1S; Discharging unit by airlift 8(a). Power, control & instrumentation cabling including heavy duty conduit for the plant - As per requirement in the site8(b). Earthing of the complete SBR system/components as per the IS 3043.9. SS 304 pipe clamps - Clamps and fittings for wall mounting in SS 304 - As per requirement in the site. 10. Components for assembling and fixing solenoid valve set a) SS 304 output for valve arrangement (1”) (2 outputs / 3 outputs) - as per requirement b) Solenoid valve for airlift arrangement (1”) - 3 Units |
| 4 | 11.Valve stand for valves (SS 304, 2mm thickness) - 1 Unit 12. Filtration Plant – Filter Feed Pump, Pressure sand filter, Activated Carbon Filter, AMPV and UV system suitable for 4 KLD plant - 1 Lot 13. SITC of Pump for treated water with starter panel, CPVC pipeline upto OHT, removing of existing paver blocks, excavation, refilling, relaying of Paver Blocks 14. Civil work for the transfer of sewerage and providing temporary arrangement for collection of sewage during the construction and disposal, shifting/re-routing existing utilities, earth mat. Earthwork in excavation and refilling, core-cutting, pipe fittings, hose connections and modifying existing tank as required.15.Civil work for the modification of existing tank as required including cutting of concrete slab as required.All as per the scope of works, drawings, detailed technical specifications and instructions of the Engineer in Charge.Payment shall be done as followsI. Design, Development and Approval of Good for Construction Drawing of MS-FRP SBR reactor STP that include all the necessary technical details in accordance with the Work requirements and Technical Specifications - 5%II. Supply, delivery of MS-FRP Prefab reactor, IoT Controller, Compressor / Side channel blower, Diffusers, Airlift units, solenoid valve set and all related accessories in accordance with the Work requirements and Technical Specifications - 20%III. Installation of SBR STP along with setting up of machine room with all necessary filtration systems at site including all civil and MEP works in accordance with the Work requirements and Technical Specifications - 25%IV. Testing and commissioning of the STP and providing the O&M manual, as-built drawings, test reports, water quality report, training for staff in accordance with the Work requirements and Technical Specifications .- 25%VI. Completion of all electrical, plumbing and finishing works in all respects and handover the STP and other infrastructure in all respects in accordance with the Work requirements and Technical Specifications - 25% |
| 5 | Design, Supply, Installation, Testing & Commissioning of Automated Sewage Treatment Plant of capacity 4 KLD based on SBR Technology with tertiary treatment and two year DLPfor Kochi Water Metro terminals at Paliyamthuruth. The plant consists of the following; 1. IoT Controller - Control unit with intranet webaccess microprocessor control with pre-set work cycles, real-time controlled, graphic display, operating hours’ counter, optional manual and automatic mode, acknowledgeable visual and acoustic fault message, mains failure alarm, logbook function operating levels, (operator, service, administrator) 2. Panel Board enclosure - Panel board (Class IP 55/65) for the enclosure of controller and necessary electrical equipment’s (MCB, indication lamps, measuing instruments, phase failure relay, MPCB, contactors) - 1 Unit 3.Compressor / Side channel blower - Compressor / Side channel blower - 300 LPM, 0.33 KW, 1~ - 1 Unit 4. Diffusers in aeration tank - EPDM Fine bubble Tubular diffusers - 1m/.75m tubuler diffuser) with SOTE < 7.5%/m at a flow rate of 5cu.m/hr or equivalent - 4-6 No’s (As per tank dimensions) 5. Diffuser stands - Diffusion system in SS 304 (8/6 outputs) stands - As per requirement and as per the tanks dimension6. Airhose - Hose, PVC braided at 10 kg/ sq.cm at temperature rating of 85 deg. C - Appx. 50 m (Machine room <3m from aeration tank)7. Airlift units / mechanical pumps (as suitable) for transfer of water from collection tank, aeration and treated water tank - Air lift arrangement and functional mechanisms, technology - Minimum- 2 units or as required in the site; Charging process by Pump flow rate 3cu.m/hr @ 9m head - 1W + 1S; Discharging unit by airlift 8(a). Power, control & instrumentation cabling including heavy duty conduit for the plant - As per requirement in the site8(b). Earthing of the complete SBR system/components as per the IS 3043.9. SS 304 pipe clamps - Clamps and fittings for wall mounting in SS 304 - As per requirement in the site. 10. Components for assembling and fixing solenoid valve set a) SS 304 output for valve arrangement (1”) (2 outputs / 3 outputs) - as per requirement b) Solenoid valve for airlift arrangement (1”) - 3 Units |
| 6 | 11.Valve stand for valves (SS 304, 2mm thickness) - 1 Unit 12. Filtration Plant – Filter Feed Pump, Pressure sand filter, Activated Carbon Filter, AMPV and UV system suitable for 4 KLD plant - 1 Lot 13. SITC of Pump for treated water with starter panel, CPVC pipeline upto OHT, removing of existing paver blocks, excavation, refilling, relaying of Paver Blocks 14. Civil work for the transfer of sewerage and providing temporary arrangement for collection of sewage during the construction and disposal, shifting/re-routing existing utilities, earth mat. Earthwork in excavation and refilling, core-cutting, pipe fittings, hose connections and modifying existing tank as required.15.Civil work for the modification of existing tank as required including cutting of concrete slab as required.All as per the scope of works, drawings, detailed technical specifications and instructions of the Engineer in Charge.Payment shall be done as followsI. Design, Development and Approval of Good for Construction Drawing of MS-FRP SBR reactor STP that include all the necessary technical details in accordance with the Work requirements and Technical Specifications - 5%II. Supply, delivery of MS-FRP Prefab reactor, IoT Controller, Compressor / Side channel blower, Diffusers, Airlift units, solenoid valve set and all related accessories in accordance with the Work requirements and Technical Specifications - 20%III. Installation of SBR STP along with setting up of machine room with all necessary filtration systems at site including all civil and MEP works in accordance with the Work requirements and Technical Specifications - 25%IV. Testing and commissioning of the STP and providing the O&M manual, as-built drawings, test reports, water quality report, training for staff in accordance with the Work requirements and Technical Specifications .- 25%VI. Completion of all electrical, plumbing and finishing works in all respects and handover the STP and other infrastructure in all respects in accordance with the Work requirements and Technical Specifications - 25% |
| 7 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil |
| 8 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 9 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 10 | Laying old cement concrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. |
| 11 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching , refilling & testing of joints complete as per direction of Engineer- in-Charge. External work32 mm nominal outer dia pipes |
| 12 | Supply of following size 1.1 KV grade XLPE insulated, PVC sheathed, FRLS armoured copper conductor cable conforming to IS 7098 (Part 1) amended upto date.4C 10 Sq.mm Cu(Armouring- Galvanized Steel Round Wire)) |
| 13 | Supplying and making end termination with brass double compression gland and Copper lugs for following size of XLPE insulated PVC sheathed aluminium/copper conductor cable of 1.1 kV grade as required. 4C 10 Sq.mm Cu |
| 14 | Laying and fixing of one number PVC insulated and PVC sheathed/ XLPE power cable of 1.1 KV grade of following size on wall surface as required.Cable size upto 35sq mm |
| 15 | Laying of one number PVC insulated and PVC sheathed / XLPE power cable of 1.1 KV grade of following size in the existing RCC/ HUME/ METAL/HDPE pipe as required.Cable size upto 35sq mm |
| 16 | Supply of ISI marked HDPE pipes with following size of 10 kgf/cm2 conforming to as per IS 4984,1985 PE-100 including all fittings and specials such as tees, elbows, bends, reducers, end caps,complete so as to withstand the internal design pressure of 10 fkg/cm2 as directed by Engineer -in-Charge.63 mm dia (OD) |
| 17 | Laying, jointing and hydrostatically testing ISI marked HDPE pipes with following size of 10 kgf/cm2 conforming to as per IS 4984,1985 PE-100 including cost of all jointing materials as required63 mm dia (OD) |
| 18 | Supply and Installation of following rating isolators mounted on suitable thermo plastic type box of IP 65 protection. The enclosure shall be mounted suitably on wall / plate / pedestal mounting (Make Hensel KV PC 8104 or equivalent approved make) Scope shall be complete with necessary minor civil works,grouting etc. 63A FP Please Enable Macros to View BoQ information |