| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. 1: 3: 6 or richer mix. |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar. |
| 3 | Plaster on new surface on walls in cement sand mortar 1:4including racking of joints etc. complete fine finish : 25 mm thick. |
| 4 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M20 grade Nominal Mix1: 1.5: 3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). |
| 5 | Finishing with neat cement (punning). |
| 6 | Providing and fixing steel gate, grating , and grills made ofangles, tees, square bars, flats,or black pipe with holdfast andfittings complete as per design and drawing including cuttingwelding and fabrication with priming coat of red oxide |
| 7 | Structural steel work in single section fixed with or without connecting plate including cutting, hoisting ( height upto 10 m), fixing in position and applying a priming coat of approved steel primer all complete. |
| 8 | Add Extra if I/rail section is used |
| 9 | Providing and fixing welded mesh/expanded metal mesh in frame work, flat iron beading 20x3mm including top cross laps inside and out sides welding, iron bolts, crews, clips etc. complete (excluding frame work) of size. Welded mesh 25 mmx 25 mm x 2.1 mm |
| 10 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats on new work |
| 11 | White washing with lime to give an even shade including allscaffolding: Old work (two or more coats) including scrapping old surfaceand repairing with whiting where ever necessary. |
| 12 | Carriage of following material including loading unloading and stacking if required complete in all respect.Earth, Sand, Lime, Moorum, manure or sludge, Building Rubbish, Stone Metal (Girt and ballast etc), Stone for Masonry work & Soling and Excavated rock etc. for 1 km. Please Enable Macros to View BoQ information |