|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 50% ordinary rock and 50% Hard Rock (Blasting Prohibited) |
| 2 | Coursed Rubble Masonry with hard stone in foundation and plinth and curing complete with Lime mortar 1:1:1 (1 Lime putty: 1 Surkhi: 1 Fine sand) 2nd sort |
| 3 | Coursed rubble masonry with hard stone (first or second sort) in superstructure above plinth level and upto floor five level including curing complete with Lime mortar 1:1:1 (1 Lime putty: 1 Surkhi: 1 Fine sand) |
| 4 | Providing and laying in position lime concrete with graded stone/brick aggregate 40 mm nominal size and 40% mortar comprising of 1:1:1 (1 lime putty: 1surkhi: 1fine sand) including curing complete but excluding cost of centering andshuttering. All works upto plinth level with: Graded Stone Aggregate |
| 5 | Pointing on stone work with cement mortar 1 : 3 (1 cement/Lime putty : 3 fine sand) Raised and cut pointing |
| 6 | Providing and laying chisel dressed Devri Stone of size 300x200 mm face with 150 mm depth in cement mortar 1: 6 (1 lime putty : 6 coarse sand) upto plinth level including curing. One face dressed Fine chisel dressed |
| 7 | Extra for fine chisel dressed Devri Stone in square or rectangular Pillars |
| 8 | Providing and fixing Ornamental heritage type stainless steel (Grade 304) railing made of Hollow tubes channels, plates etc. including welding ,grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete ,including fixing the railing with necessary accessories and stainless steel dash fasteners, stainless steel bolts etc. of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.). |
| 9 | Applying two or more coats of Ethyl silicate chemicals as approved by Archaeological survey of India/ Engineer-in-charge, of approved brand and manufacturer, with brush or spray on the existing stone masonry surface till there is no further absorption of chemical by stone surface, including protecting the applied surface from direct sun light by suitable means during application, all complete as per direction of the Engineerin-charge ( the rate is inclusive of all materials and labours involved except scaffolding) |
| 10 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): Second class deodar wood |
| 11 | Providing and fixing plained eaves boarding.2nd class Deodar wood 300x40 mm (nominal size) |
| 12 | Finishing with Deluxe multi surface paint system for interiors and exteriors using primer as per manufacturers’ specifications:Painting wood work with deluxe multi surface paint of required shade. Two or more coats applied @ 0.90litre/10sqm over an under coat of primer applied @ 0.75litre/10sqm of approved brand and manufacture |
| 13 | Carriage of materials by mechanical transport including loading / unloading and stacking complete. Lime lead up to 120 kms avg. |
| 14 | Carriage of materials by mechanical transport including loading / unloading and stacking complete. Surkhi lead up to 120 kms avg. |
| 15 | Carriage of materials by mechanical transport including loading / unloading and stacking complete. Sand lead up to 120 kms avg. |
| 16 | Carriage of materials by mechanical transport including loading / unloading and stacking complete. Stone lead up to 15 kms avg. |
| 17 | Carriage of materials by Manual Labour including loading / unloading and stacking complete. Lime lead up to 5 km avg. |
| 18 | Carriage of materials by Manual Labour including loading / unloading and stacking complete. Surkhi lead up to 5 km avg. |
| 19 | Carriage of materials by Manual Labour including loading / unloading and stacking complete. Sand lead up to 5 km avg. |
| 20 | Carriage of materials by Manual Labour including loading / unloading and stacking complete. Stone lead up to 5 km avg. Please Enable Macros to View BoQ information |