| 1 | WSS Gari Gabbar |
| 2 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work). 32 mm dia. nominal bore |
| 3 | 25mm dia. nominal bore |
| 4 | 20mm dia. nominal bore |
| 5 | 15mm dia. nominal bore |
| 6 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : |
| 7 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. |
| 8 | Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/by mechanical means including stacking of pipes within 50 meters lead as per direction of Engineer-in-charge :65 mm nominal bore |
| 9 | 50 mm nominal bore |
| 10 | 40 mm nominal bore |
| 11 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work. 65 mm nominal bore |
| 12 | 50 mm nominal bore |
| 13 | 40 mm nominal bore |
| 14 | Carriage of GI Pipe from Jammu to Site of Work for an average distance of 125 km by Mechanical transport and 5 km by head load. |
| 15 | WSS Dheeran Thanpal |
| 16 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:50 meter beyond 1m from cutting edge |
| 17 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 18 | Dumping of stone incl. cost of stone on Horizontal level. |
| 19 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns |
| 20 | Carriage of Cement from nearest source to site of work for an average distance of 50 km by Mechanical Transport and 2000 M by Head load. |
| 21 | Carriage of Sand and stone aggregate from nearest source to site of work for an average distance of 55 km by Mechanical Transport and 5000 M by Head load. |
| 22 | Carriage of Solling Stone from nearest source to site of work for an average distance of 1 km by mannual labour/ head load. Please Enable Macros to View BoQ information |