| 1 | WSS Judda |
| 2 | Providing and fixing HDPE pipes complete with HDPE fittings excluding trenching and refilling etc. (external work).HDPE 110 mm dia. nominal bore |
| 3 | HDPE 75mm dia. nominal bore |
| 4 | HDPE 50mm dia. nominal bore |
| 5 | HDPE 32mm dia. nominal bore |
| 6 | HDPE 25mm dia. nominal bore |
| 7 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : |
| 8 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. |
| 9 | Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/by mechanical means including stacking of pipes within 50 meters lead as per direction of Engineer-in-charge :(Below 40 mm dia. nominal bore) |
| 10 | Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/by mechanical means including stacking of pipes within 50 meters lead as per direction of Engineer-in-charge :(Above 40 mm dia. nominal bore) |
| 11 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work.40mm & 50 mm dia. nominal bore G.I. pipes |
| 12 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work.25mm & 32 mm dia. nominal bore G.I. pipes |
| 13 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work.110 mm dia. nominal bore G.I. pipes |
| 14 | Welding, including transportation of plant at site etc. complete1. By electric plant |
| 15 | Carriage of HDPE Pipe from Jammu to Site of Work for an average distance of 170 km by Mechanical transport and 5 km by head load. |
| 16 | WSS Sawlakote |
| 17 | Providing and fixing HDPE pipes complete with HDPE fittings excluding trenching and refilling etc. (external work).HDPE 75 mm dia. nominal bore |
| 18 | HDPE 50mm dia. nominal bore |
| 19 | HDPE 40mm dia. nominal bore |
| 20 | HDPE 32mm dia. nominal bore |
| 21 | HDPE 25mm dia. nominal bore |
| 22 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : |
| 23 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. |
| 24 | Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/by mechanical means including stacking of pipes within 50 meters lead as per direction of Engineer-in-charge :(Below 40 mm dia. nominal bore) |
| 25 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work.25mm & 32 mm dia. nominal bore G.I. pipes |
| 26 | Welding, including transportation of plant at site etc. complete1. By electric plant |
| 27 | Carriage of HDPE Pipe from Jammu to Site of Work for an average distance of 170 km by Mechanical transport and 5 km by head load. Please Enable Macros to View BoQ information |