| 1 | Providing and Fixing Wooden Fencing around Lawn of Newly Constructed Office Building, including Anchoring Arrangement with Cement Concrete Footings, MS Angle Iron Supports, and Wooden Fence Panels.Details of the Job are as under:- |
| 2 | Earth work in bulk excavation by manual means over areas including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. (300 X 300 X 450 )mm X 17 No's |
| 3 | Providing and laying cement concrete (1:2:4 grade) in foundation for anchoring posts, including shuttering, curing, and finishing.(300 X 300 X 400 )mm X 17 No's |
| 4 | Fabrication and installation of MS angle iron (40×40×5 mm) and MS Strip of size (25 x3)mm, for anchoring of the Vertical Posts of the Fencing. The anchoring shall be done as per the directions of the Incharge Engineer.ISA 40 : (460 + 230 + 125)mm X 17 No's = 13.86 M @ 3.78 kg/M = 52.39 KgMS Strip (25x3)mm : 230 mm X 60 No's = 13.8 M @ 0.6 kg/M = 8.28 KTotal = 60.67 Kg |
| 5 | Wood Work/ FenceErection of Wooden-Fence by way of fixing in position of wooden planks machined/ sawed out of the wooden packing material of 870 kW 11kV Slip Ring Induction Motor (Apprx. 40 CFT) around the periphery of piece of land infront of the Sub-Divisional Office building. Works shall be executed as per the directions of the Engineer incharge. The sizes of the wooden Panels/ Posts is detailed below. 1. (3\\"×3\\"×4') ... 20 Nos apprx2. (2\\"x1\\"X6').... 50 Nos apprx3. (4\\"x1\\"x4') .... 250 Nos apprx The frame shall be erected by securing the wooden Panels with MS Bolts/ Screws/ Fastners etc. However the cost of Jigs and fixtures is excluded. |
| 6 | Carriage of material (Wooden Planks)Mechanical transportation, loading, unloading and handling of various items such as pump parts, motors, starters, voltage stabilizers, coil assemblies, welding tools & plant, etc. using appropriate means of transport as under: |
| 7 | Truck, tipper or similar with 1.0 km lead3 Trips |
| 8 | Extra per kilometer for lead >10.0 kms upto 20.0 kms. |
| 9 | Supply and fixing of galvanized / SS fasteners (Geyser-bolts, Nails, nuts, screws, washers) and fittings |
| 10 | Painting of the Fencing with one coat of wood Primer paint and Applying two coats of wood finish / enamel paint over one coat of primer including surface preparation. Job involves cost of material and labour. |
| 11 | Site cleaning and disposal of debris after completion |
| 12 | Landscaping: Supplying and stacking of good earth at site including royalty (earth measured in stacks will be reduced by 20% for payment) |
| 13 | Mechanical transportation, loading, unloading and handling of various items such as pump parts, motors, starters, voltage stabilizers, coil assemblies, welding tools & plant, etc. using appropriate means of transport as under: |
| 14 | Truck, tipper or similar with 1.0 km lead3 Trips3 Trips |
| 15 | Extra per kilometer for lead >10.0 kms upto 20.0 kms. 3 Trips of 19 Kms Each |
| 16 | Providing and fitting of 1500 Watt Capacity Romm Heat Pillars with Dual Heat Settings, Oscillating Fan, Copper Winding and Rust free Reflector. Job also involves providing and fitting of 16 Amp Extension Chords having atleast 02 Sockets of reputed Brand. |
| 17 | Providing and fitting of 2000 Watt Capacity portable Room Heating Blower with atleast two heating modes and overheat protection, horizonta & vertical mount. Job also involves providing and fitting of 16 Amp Extension Chords having atleast 02 Sockets of reputed Brand. Please Enable Macros to View BoQ information |