Railways Government Departments Closing in 15 days TDR #56093036

Supply Of THREE TYPES SET OF PARTITION FRAME FOR LSDD AMRIT BHARAT

Issued by Government Departments · Kapurthala, Punjab
Tender Value
Ref. Documents
Estimated cost
Bid Submission
20 Jul 2026
15 days left
EMD
9.36 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Kapurthala → Punjab
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Supply Of three types set of partition frame for lsdd amrit bharat , set of partition frame for lsdd amrit bharat 3.0 ( (note- colour scheme is a s per design letter no md48161 dated- 15/05/2026 ), as per drawing: mp26pfgsab3.0 version 0, packing instruction: `packing condition of set of partition frame and procedure to achie ve best possible protection during transportation: 1. surface preparation: - thoroughl y clean the components to remove any dirt, grease or contaminants - apply a protectiv e film, such as pvc or laser film or bubble sheet, to shield surfaces from scratches an d environmental factor. 2. packing materials: - wooden crates: construct sturdy woo den cage tailored to the components dimensions. - steel strapping: utilize rust-proof s teel straps to securely bundle components, preventing movement during transit. 3. mo isture barrier: - incorporate moisture-proof materials, such as plastic film or water p roof ability paper, to guard against corrosion. 4. component arrangement: - place com ponents on wooden pallets or within custom-designed supports to distribute weight e venly and prevent deformation. - ensure that no part of the component extends beyon d the protective packaging to avoid exposure to potential damage. 5. securing the com ponents: - use steel straps or ropes to fimly anchor the components within the woode n crate, minimizing internal movement. - for added stability, employ bracing or cushioni ng materials, such as foam pads or corrugated inserts, to fill voids and absorb shock s. - hardware items to be suitably packed separately inside the crate. 6. labeling and do cumentation: - clearly label each package with essential information, including pl no. s pecifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firms & destination details. 7. loading onto trailer/ lorry/truck/transport: - strategically position the packaged components within the tr uck/suitable to maintain balance and prevent shifting during transit. - secure the pack ages to the containers structure using lashing ties or additional bracing as needed. 8. final inspection and sealing: - conduct a thorough inspection to verify that all comp onents are securely packed and that packaging materials are intact. [ warranty period: 30 months after the date of delivery ] ] , set of partition frame for lhb scn amrit bharat 3.0 coaches. (note- colour scheme is as as per design letter nomd48161 dated- 15/05/2026 ), as per drawing: mp26pfsc nab3.0 version 0, packing instruction: `packing condition of set of partition frame and pro cedure to achieve best possible protection during transportation: 1. surface preparati on: - thoroughly clean the components to remove any dirt, grease or contaminants - a pply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces fro m scratches and environmental factor. 2. packing materials: - wooden crates: constru ct sturdy wooden cage tailored to the components dimensions. - steel strapping: utili ze rust-proof steel straps to securely bundle components, preventing movement durin g transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plastic f ilm or water proof ability paper, to guard against corrosion. 4. component arrangeme nt: - place components on wooden pallets or within custom-designed supports to distr ibute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. sec uring the components: - use steel straps or ropes to fimly anchor the components wit hin the wooden crate, minimizing internal movement. - for added stability, employ braci ng or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorb shocks. - hardware items to be suitably packed separately inside the crate. 6. la beling and documentation: - clearly label each package with essential information, inc luding pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firms & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - sec ure the packages to the containers structure using lashing ties or additional bracing as needed. 8. final inspection and sealing: - conduct a thorough inspection to verify th at all components are securely packed and that packaging materials are intact. [ warr anty period: 30 months after the date of delivery ] ] , set of partition frame & pillar for slr amrit bharat 3.0 coaches.( (note- col our scheme is as per design letter no md48161 dated-15/05/2026 ), as per drawing: mp26pfp slrab3 version 0, packing instruction: `packing condition of set of partition frame and pro cedure to achieve best possible protection during transportation: 1. surface preparati on: - thoroughly clean the components to remove any dirt, grease or contaminants - a pply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces fro m scratches and environmental factor. 2. packing materials: - wooden crates: constru ct sturdy wooden cage tailored to the components dimensions. - steel strapping: utili ze rust-proof steel straps to securely bundle components, preventing movement durin g transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plastic f ilm or water proof ability paper, to guard against corrosion. 4. component arrangeme nt: - place components on wooden pallets or within custom-designed supports to distr ibute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. sec uring the components: - use steel straps or ropes to fimly anchor the components wit hin the wooden crate, minimizing internal movement. - for added stability, employ braci ng or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorb shocks. - hardware items to be suitably packed separately inside the crate. 6. la beling and documentation: - clearly label each package with essential information, inc luding pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firms & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - sec ure the packages to the containers structure using lashing ties or additional bracing as needed. 8. final inspection and sealing: - conduct a thorough inspection to verify th at all components are securely packed and that packaging materials are intact. [ warr anty period: 30 months after the date of delivery ] ]

BOQ

Sl. No.Item Description
1SET OF PARTITION FRAME FOR LSDD AMRIT BHARAT 3.0 ( (NOTE- COLOUR SCHEME IS A S PER DESIGN LETTER NO MD48161 DATED- 15/05/2026 ), as per Drawing: MP26PFGSAB3.0 VERSION 0, Packing Instruction: `PACKING CONDITION OF SET OF PARTITION FRAME AND PROCEDURE TO ACHIE VE BEST POSSIBLE PROTECTION DURING TRANSPORTATION: 1. SURFACE PREPARATION: - THOROUGHL Y CLEAN THE COMPONENTS TO REMOVE ANY DIRT, GREASE OR CONTAMINANTS - APPLY A PROTECTIV E FILM, SUCH AS PVC OR LASER FILM OR BUBBLE SHEET, TO SHIELD SURFACES FROM SCRATCHES AN D ENVIRONMENTAL FACTOR. 2. PACKING MATERIALS: - WOODEN CRATES: CONSTRUCT STURDY WOO DEN CAGE TAILORED TO THE COMPONENT'S DIMENSIONS. - STEEL STRAPPING: UTILIZE RUST-PROOF S TEEL STRAPS TO SECURELY BUNDLE COMPONENTS, PREVENTING MOVEMENT DURING TRANSIT. 3. MO ISTURE BARRIER: - INCORPORATE MOISTURE-PROOF MATERIALS, SUCH AS PLASTIC FILM OR WATER P ROOF ABILITY PAPER, TO GUARD AGAINST CORROSION. 4. COMPONENT ARRANGEMENT: - PLACE COM PONENTS ON WOODEN PALLETS OR WITHIN CUSTOM-DESIGNED SUPPORTS TO DISTRIBUTE WEIGHT E VENLY AND PREVENT DEFORMATION. - ENSURE THAT NO PART OF THE COMPONENT EXTENDS BEYON D THE PROTECTIVE PACKAGING TO AVOID EXPOSURE TO POTENTIAL DAMAGE. 5. SECURING THE COM PONENTS: - USE STEEL STRAPS OR ROPES TO FIMLY ANCHOR THE COMPONENTS WITHIN THE WOODE N CRATE, MINIMIZING INTERNAL MOVEMENT. - FOR ADDED STABILITY, EMPLOY BRACING OR CUSHIONI NG MATERIALS, SUCH AS FOAM PADS OR CORRUGATED INSERTS, TO FILL VOIDS AND ABSORB SHOCK S. - HARDWARE ITEMS TO BE SUITABLY PACKED SEPARATELY INSIDE THE CRATE. 6. LABELING AND DO CUMENTATION: - CLEARLY LABEL EACH PACKAGE WITH ESSENTIAL INFORMATION, INCLUDING PL NO. S PECIFICATIONS, DETAILS OF EACH SET WITH QTY. AND ALSO KEEP ONE COPY INSIDE OT THE CRATE, WEIGHT, HANDLING INSTRUCTIONS AND FIRM'S & DESTINATION DETAILS. 7. LOADING ONTO TRAILER/ LORRY/TRUCK/TRANSPORT: - STRATEGICALLY POSITION THE PACKAGED COMPONENTS WITHIN THE TR UCK/SUITABLE TO MAINTAIN BALANCE AND PREVENT SHIFTING DURING TRANSIT. - SECURE THE PACK AGES TO THE CONTAINER'S STRUCTURE USING LASHING TIES OR ADDITIONAL BRACING AS NEEDED. 8. FINAL INSPECTION AND SEALING: - CONDUCT A THOROUGH INSPECTION TO VERIFY THAT ALL COMP ONENTS ARE SECURELY PACKED AND THAT PACKAGING MATERIALS ARE INTACT. [ Warranty Period: 30 Months after the date of delivery ] ]
2SET OF PARTITION FRAME FOR LHB SCN AMRIT BHARAT 3.0 COACHES. (NOTE- COLOUR SCHEME IS AS AS PER DESIGN LETTER NOMD48161 DATED- 15/05/2026 ), as per Drawing: MP26PFSC NAB3.0 VERSION 0, Packing Instruction: `PACKING CONDITION OF SET OF PARTITION FRAME AND PRO CEDURE TO ACHIEVE BEST POSSIBLE PROTECTION DURING TRANSPORTATION: 1. SURFACE PREPARATI ON: - THOROUGHLY CLEAN THE COMPONENTS TO REMOVE ANY DIRT, GREASE OR CONTAMINANTS - A PPLY A PROTECTIVE FILM, SUCH AS PVC OR LASER FILM OR BUBBLE SHEET, TO SHIELD SURFACES FRO M SCRATCHES AND ENVIRONMENTAL FACTOR. 2. PACKING MATERIALS: - WOODEN CRATES: CONSTRU CT STURDY WOODEN CAGE TAILORED TO THE COMPONENT'S DIMENSIONS. - STEEL STRAPPING: UTILI ZE RUST-PROOF STEEL STRAPS TO SECURELY BUNDLE COMPONENTS, PREVENTING MOVEMENT DURIN G TRANSIT. 3. MOISTURE BARRIER: - INCORPORATE MOISTURE-PROOF MATERIALS, SUCH AS PLASTIC F ILM OR WATER PROOF ABILITY PAPER, TO GUARD AGAINST CORROSION. 4. COMPONENT ARRANGEME NT: - PLACE COMPONENTS ON WOODEN PALLETS OR WITHIN CUSTOM-DESIGNED SUPPORTS TO DISTR IBUTE WEIGHT EVENLY AND PREVENT DEFORMATION. - ENSURE THAT NO PART OF THE COMPONENT EXTENDS BEYOND THE PROTECTIVE PACKAGING TO AVOID EXPOSURE TO POTENTIAL DAMAGE. 5. SEC URING THE COMPONENTS: - USE STEEL STRAPS OR ROPES TO FIMLY ANCHOR THE COMPONENTS WIT HIN THE WOODEN CRATE, MINIMIZING INTERNAL MOVEMENT. - FOR ADDED STABILITY, EMPLOY BRACI NG OR CUSHIONING MATERIALS, SUCH AS FOAM PADS OR CORRUGATED INSERTS, TO FILL VOIDS AND ABSORB SHOCKS. - HARDWARE ITEMS TO BE SUITABLY PACKED SEPARATELY INSIDE THE CRATE. 6. LA BELING AND DOCUMENTATION: - CLEARLY LABEL EACH PACKAGE WITH ESSENTIAL INFORMATION, INC LUDING PL NO. SPECIFICATIONS, DETAILS OF EACH SET WITH QTY. AND ALSO KEEP ONE COPY INSIDE OT THE CRATE, WEIGHT, HANDLING INSTRUCTIONS AND FIRM'S & DESTINATION DETAILS. 7. LOADING ONTO TRAILER/LORRY/TRUCK/TRANSPORT: - STRATEGICALLY POSITION THE PACKAGED COMPONENTS WITHIN THE TRUCK/SUITABLE TO MAINTAIN BALANCE AND PREVENT SHIFTING DURING TRANSIT. - SEC URE THE PACKAGES TO THE CONTAINER'S STRUCTURE USING LASHING TIES OR ADDITIONAL BRACING AS NEEDED. 8. FINAL INSPECTION AND SEALING: - CONDUCT A THOROUGH INSPECTION TO VERIFY TH AT ALL COMPONENTS ARE SECURELY PACKED AND THAT PACKAGING MATERIALS ARE INTACT. [ Warr anty Period: 30 Months after the date of delivery ] ]
3SET OF PARTITION FRAME & PILLAR FOR SLR AMRIT BHARAT 3.0 COACHES.( (NOTE- COL OUR SCHEME IS AS PER DESIGN LETTER NO MD48161 DATED-15/05/2026 ), as per Drawing: MP26PFP SLRAB3 VERSION 0, Packing Instruction: `PACKING CONDITION OF SET OF PARTITION FRAME AND PRO CEDURE TO ACHIEVE BEST POSSIBLE PROTECTION DURING TRANSPORTATION: 1. SURFACE PREPARATI ON: - THOROUGHLY CLEAN THE COMPONENTS TO REMOVE ANY DIRT, GREASE OR CONTAMINANTS - A PPLY A PROTECTIVE FILM, SUCH AS PVC OR LASER FILM OR BUBBLE SHEET, TO SHIELD SURFACES FRO M SCRATCHES AND ENVIRONMENTAL FACTOR. 2. PACKING MATERIALS: - WOODEN CRATES: CONSTRU CT STURDY WOODEN CAGE TAILORED TO THE COMPONENT'S DIMENSIONS. - STEEL STRAPPING: UTILI ZE RUST-PROOF STEEL STRAPS TO SECURELY BUNDLE COMPONENTS, PREVENTING MOVEMENT DURIN G TRANSIT. 3. MOISTURE BARRIER: - INCORPORATE MOISTURE-PROOF MATERIALS, SUCH AS PLASTIC F ILM OR WATER PROOF ABILITY PAPER, TO GUARD AGAINST CORROSION. 4. COMPONENT ARRANGEME NT: - PLACE COMPONENTS ON WOODEN PALLETS OR WITHIN CUSTOM-DESIGNED SUPPORTS TO DISTR IBUTE WEIGHT EVENLY AND PREVENT DEFORMATION. - ENSURE THAT NO PART OF THE COMPONENT EXTENDS BEYOND THE PROTECTIVE PACKAGING TO AVOID EXPOSURE TO POTENTIAL DAMAGE. 5. SEC URING THE COMPONENTS: - USE STEEL STRAPS OR ROPES TO FIMLY ANCHOR THE COMPONENTS WIT HIN THE WOODEN CRATE, MINIMIZING INTERNAL MOVEMENT. - FOR ADDED STABILITY, EMPLOY BRACI NG OR CUSHIONING MATERIALS, SUCH AS FOAM PADS OR CORRUGATED INSERTS, TO FILL VOIDS AND ABSORB SHOCKS. - HARDWARE ITEMS TO BE SUITABLY PACKED SEPARATELY INSIDE THE CRATE. 6. LA BELING AND DOCUMENTATION: - CLEARLY LABEL EACH PACKAGE WITH ESSENTIAL INFORMATION, INC LUDING PL NO. SPECIFICATIONS, DETAILS OF EACH SET WITH QTY. AND ALSO KEEP ONE COPY INSIDE OT THE CRATE, WEIGHT, HANDLING INSTRUCTIONS AND FIRM'S & DESTINATION DETAILS. 7. LOADING ONTO TRAILER/LORRY/TRUCK/TRANSPORT: - STRATEGICALLY POSITION THE PACKAGED COMPONENTS WITHIN THE TRUCK/SUITABLE TO MAINTAIN BALANCE AND PREVENT SHIFTING DURING TRANSIT. - SEC URE THE PACKAGES TO THE CONTAINER'S STRUCTURE USING LASHING TIES OR ADDITIONAL BRACING AS NEEDED. 8. FINAL INSPECTION AND SEALING: - CONDUCT A THOROUGH INSPECTION TO VERIFY TH AT ALL COMPONENTS ARE SECURELY PACKED AND THAT PACKAGING MATERIALS ARE INTACT. [ Warr anty Period: 30 Months after the date of delivery ] ]

AI Tender Summary

OUR REF NO 56093036
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 20-07-2026
Authority
Authority Name Rail Coach Factory
Work Description Supply Of three types set of partition frame for lsdd amrit bharat , set of partition frame for lsdd amrit bharat 3.0 ( (note- colour scheme is a s per design letter no md48161 dated- 15/05/2026 ), as per drawing: mp26pfgsab3.0 version 0, packing instruction: `packing condition of set of partition frame and procedure to achie ve best possible protection during transportation: 1. surface preparation: - thoroughl y clean the components to remove any dirt, grease or contaminants - apply a protectiv e film, such as pvc or laser film or bubble sheet, to shield surfaces from scratches an d environmental factor. 2. packing materials: - wooden crates: construct sturdy woo den cage tailored to the components dimensions. - steel strapping: utilize rust-proof s teel straps to securely bundle components, preventing movement during transit. 3. mo isture barrier: - incorporate moisture-proof materials, such as plastic film or water p roof ability paper, to guard against corrosion. 4. component arrangement: - place com ponents on wooden pallets or within custom-designed supports to distribute weight e venly and prevent deformation. - ensure that no part of the component extends beyon d the protective packaging to avoid exposure to potential damage. 5. securing the com ponents: - use steel straps or ropes to fimly anchor the components within the woode n crate, minimizing internal movement. - for added stability, employ bracing or cushioni ng materials, such as foam pads or corrugated inserts, to fill voids and absorb shock s. - hardware items to be suitably packed separately inside the crate. 6. labeling and do cumentation: - clearly label each package with essential information, including pl no. s pecifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firms & destination details. 7. loading onto trailer/ lorry/truck/transport: - strategically position the packaged components within the tr uck/suitable to maintain balance and prevent shifting during transit. - secure the pack ages to the containers structure using lashing ties or additional bracing as needed. 8. final inspection and sealing: - conduct a thorough inspection to verify that all comp onents are securely packed and that packaging materials are intact. [ warranty period: 30 months after the date of delivery ] ] , set of partition frame for lhb scn amrit bharat 3.0 coaches. (note- colour scheme is as as per design letter nomd48161 dated- 15/05/2026 ), as per drawing: mp26pfsc nab3.0 version 0, packing instruction: `packing condition of set of partition frame and pro cedure to achieve best possible protection during transportation: 1. surface preparati on: - thoroughly clean the components to remove any dirt, grease or contaminants - a pply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces fro m scratches and environmental factor. 2. packing materials: - wooden crates: constru ct sturdy wooden cage tailored to the components dimensions. - steel strapping: utili ze rust-proof steel straps to securely bundle components, preventing movement durin g transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plastic f ilm or water proof ability paper, to guard against corrosion. 4. component arrangeme nt: - place components on wooden pallets or within custom-designed supports to distr ibute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. sec uring the components: - use steel straps or ropes to fimly anchor the components wit hin the wooden crate, minimizing internal movement. - for added stability, employ braci ng or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorb shocks. - hardware items to be suitably packed separately inside the crate. 6. la beling and documentation: - clearly label each package with essential information, inc luding pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firms & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - sec ure the packages to the containers structure using lashing ties or additional bracing as needed. 8. final inspection and sealing: - conduct a thorough inspection to verify th at all components are securely packed and that packaging materials are intact. [ warr anty period: 30 months after the date of delivery ] ] , set of partition frame & pillar for slr amrit bharat 3.0 coaches.( (note- col our scheme is as per design letter no md48161 dated-15/05/2026 ), as per drawing: mp26pfp slrab3 version 0, packing instruction: `packing condition of set of partition frame and pro cedure to achieve best possible protection during transportation: 1. surface preparati on: - thoroughly clean the components to remove any dirt, grease or contaminants - a pply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces fro m scratches and environmental factor. 2. packing materials: - wooden crates: constru ct sturdy wooden cage tailored to the components dimensions. - steel strapping: utili ze rust-proof steel straps to securely bundle components, preventing movement durin g transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plastic f ilm or water proof ability paper, to guard against corrosion. 4. component arrangeme nt: - place components on wooden pallets or within custom-designed supports to distr ibute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. sec uring the components: - use steel straps or ropes to fimly anchor the components wit hin the wooden crate, minimizing internal movement. - for added stability, employ braci ng or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorb shocks. - hardware items to be suitably packed separately inside the crate. 6. la beling and documentation: - clearly label each package with essential information, inc luding pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firms & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - sec ure the packages to the containers structure using lashing ties or additional bracing as needed. 8. final inspection and sealing: - conduct a thorough inspection to verify th at all components are securely packed and that packaging materials are intact. [ warr anty period: 30 months after the date of delivery ] ]
Basic Detail
Tender No 05261436
Bidding Type Tender
Location
City Kapurthala
State Punjab
Key Dates
Publish Date 20 Jun 2026
Submission Date 20 Jul 2026
Open Date 01 Jan 0001
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 9.36 Lakhs
Exemption Not Available
Document List
5814206.pdf
a1a2a627-5023-48df-8080-ebaa5a70e0b8.pdf
5814199.pdf
5814201.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 20, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 20, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 15 days

Tender Documents

Download All (ZIP) ↓
pdf

5814206.pdf

pdf

a1a2a627-5023-48df-8080-ebaa5a70e0b8.pdf

pdf

5814199.pdf

pdf

5814201.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders