Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation; Semi Turnkey - Cartage Of 8.5M/11M/13M Poles From Store Hamirpur Or Any Other Place To The Respective
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation; Semi Turnkey - Cartage Of 8.5M/11M/13M Poles From Store Hamirpur Or Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Aldo Including Etc And Also Including The Cost Of T&P Carrier Etc Require For Proper Completion Of Work. , Cartage Of Line Material Viz Stone Pad, Top Channel, Dropper Channel, Disc Insulator Etc And Other Material From Edc/Ask Hamirpur Or Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Including The Work Of Its Dragging Etc And Also Including The Cost Of Labour T&P And Carrier Etcrequire For Proper Compleion Of Work. , Erection Of 8.5M/11M/13M Poles Single Support Of Poles Including Complete Ht/Lt Fitting As Per Manual And As Per Direction Of Engineer Incharge The Cost Of Labour T&P And Carrier Etc Require For Proper Completion Of Work. , Erection Of 8.5M/11M/13M Poles Double Support Of Poles Including Complete Ht/Lt Fitting As Per Manual And As Per Direction Of Engineer Incharge The Cost Of Labour T&P And Carrier Etc Require For Proper Completion Of Work. , Grouting Of Poles 8.5M/11M/13M Poles As Per Resspo Manual And As Per Direction Of Engineer Incharge Included The Cost Of Labour T&P Carrier Etc Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement Sand Ballast/Stone Pad Etc As Per Actual Site Required. , Erection & Grouting Of Stya Set As Per Resspo Manual And Also Including The Cost Of All Grouting Material Labour T&P For Proper Completion Of Work. , Erection Of Earthing Complete As Per Direction Of Supervising Engineer. It Including The Cost Of Labour T&P Carrier Etc Required For Proper Completion Of Work. , Laying, Sagging, Stringing, Binding Etc Of All Type Cable New On The Newly Erected Pole Any Other Place Asper Resspo Manual And As Per Direction. , Laying, Sagging, Stringing, Binding Etc Of Lt Armoured Cable 3.5X70 & 3.5X120 Sqmm New On The Newly Erected Pole Any Other Place As Per Resspo Manual And As Per Direction Of Supervising Engineer. , Three Chooping Of 11 Kv Line , Supply & Installation Of All Type Cl S , Supply Of Different Size Of Nut Bolt
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 06-Jul-2026 | 09-Jul-2026 | ||
| 2 | 09-Jul-2026 | 13-Jul-2026 |
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | CARTAGE OF 8.5M/11M/13M POLES FROM STORE HAMIRPUR OR ANY OTHER PLACE TO THE RESPECTIVE SITE OF WORK THROUGH THE KACHHA PACCA ROAD INCLUDING THE WORK OF ITS LOADING & UNLOADING AT THE RESPECTIVE ENDS ALDO INCLUDING ETC AND ALSO INCLUDING THE COST OF T&P CARRIER ETC REQUIRE FOR PROPER COMPLETION OF WORK. | CARTAGE OF 8.5M/11M/13M POLES FROM STORE HAMIRPUR OR ANY OTHER PLACE TO THE RESPECTIVE SITE OF WORK THROUGH THE KACHHA PACCA ROAD INCLUDING THE WORK OF ITS LOADING & UNLOADING AT THE RESPECTIVE ENDS ALDO INCLUDING ETC AND ALSO INCLUDING THE COST OF T&P CARRIER ETC REQUIRE FOR PROPER COMPLETION OF WORK. |
| 2 | CARTAGE OF LINE MATERIAL VIZ STONE PAD, TOP CHANNEL, DROPPER CHANNEL, DISC INSULATOR ETC AND OTHER MATERIAL FROM EDC/ASK HAMIRPUR OR ANY OTHER PLACE TO THE RESPECTIVE SITE OF WORK THROUGH THE KACHHA PACCA ROAD INCLUDING THE WORK OF ITS LOADING & UNLOADING AT THE RESPECTIVE ENDS INCLUDING THE WORK OF ITS DRAGGING ETC AND ALSO INCLUDING THE COST OF LABOUR T&P AND CARRIER ETCREQUIRE FOR PROPER COMPLEION OF WORK. | CARTAGE OF LINE MATERIAL VIZ STONE PAD, TOP CHANNEL, DROPPER CHANNEL, DISC INSULATOR ETC AND OTHER MATERIAL FROM EDC/ASK HAMIRPUR OR ANY OTHER PLACE TO THE RESPECTIVE SITE OF WORK THROUGH THE KACHHA PACCA ROAD INCLUDING THE WORK OF ITS LOADING & UNLOADING AT THE RESPECTIVE ENDS INCLUDING THE WORK OF ITS DRAGGING ETC AND ALSO INCLUDING THE COST OF LABOUR T&P AND CARRIER ETCREQUIRE FOR PROPER COMPLEION OF WORK. |
| 3 | ERECTION OF 8.5M/11M/13M POLES SINGLE SUPPORT OF POLES INCLUDING COMPLETE HT/LT FITTING AS PER MANUAL AND AS PER DIRECTION OF ENGINEER INCHARGE THE COST OF LABOUR T&P AND CARRIER ETC REQUIRE FOR PROPER COMPLETION OF WORK. | ERECTION OF 8.5M/11M/13M POLES SINGLE SUPPORT OF POLES INCLUDING COMPLETE HT/LT FITTING AS PER MANUAL AND AS PER DIRECTION OF ENGINEER INCHARGE THE COST OF LABOUR T&P AND CARRIER ETC REQUIRE FOR PROPER COMPLETION OF WORK. |
| 4 | ERECTION OF 8.5M/11M/13M POLES DOUBLE SUPPORT OF POLES INCLUDING COMPLETE HT/LT FITTING AS PER MANUAL AND AS PER DIRECTION OF ENGINEER INCHARGE THE COST OF LABOUR T&P AND CARRIER ETC REQUIRE FOR PROPER COMPLETION OF WORK. | ERECTION OF 8.5M/11M/13M POLES DOUBLE SUPPORT OF POLES INCLUDING COMPLETE HT/LT FITTING AS PER MANUAL AND AS PER DIRECTION OF ENGINEER INCHARGE THE COST OF LABOUR T&P AND CARRIER ETC REQUIRE FOR PROPER COMPLETION OF WORK. |
| 5 | GROUTING OF POLES 8.5M/11M/13M POLES AS PER RESSPO MANUAL AND AS PER DIRECTION OF ENGINEER INCHARGE INCLUDED THE COST OF LABOUR T&P CARRIER ETC REQUIRED FOR PROPER COMPLETION OF WORK. THE SUPPORT SHALL BE GROUTED WITH CEMENT SAND BALLAST/STONE PAD ETC AS PER ACTUAL SITE REQUIRED. | GROUTING OF POLES 8.5M/11M/13M POLES AS PER RESSPO MANUAL AND AS PER DIRECTION OF ENGINEER INCHARGE INCLUDED THE COST OF LABOUR T&P CARRIER ETC REQUIRED FOR PROPER COMPLETION OF WORK. THE SUPPORT SHALL BE GROUTED WITH CEMENT SAND BALLAST/STONE PAD ETC AS PER ACTUAL SITE REQUIRED. |
| 6 | ERECTION & GROUTING OF STYA SET AS PER RESSPO MANUAL AND ALSO INCLUDING THE COST OF ALL GROUTING MATERIAL LABOUR t&p FOR PROPER COMPLETION OF WORK. | ERECTION & GROUTING OF STYA SET AS PER RESSPO MANUAL AND ALSO INCLUDING THE COST OF ALL GROUTING MATERIAL LABOUR t&p FOR PROPER COMPLETION OF WORK. |
| 7 | ERECTION OF EARTHING COMPLETE AS PER DIRECTION OF SUPERVISING ENGINEER. IT INCLUDING THE COST OF LABOUR T&P CARRIER ETC REQUIRED FOR PROPER COMPLETION OF WORK. | ERECTION OF EARTHING COMPLETE AS PER DIRECTION OF SUPERVISING ENGINEER. IT INCLUDING THE COST OF LABOUR T&P CARRIER ETC REQUIRED FOR PROPER COMPLETION OF WORK. |
| 8 | LAYING, SAGGING, STRINGING, BINDING ETC OF ALL TYPE CABLE NEW ON THE NEWLY ERECTED POLE ANY OTHER PLACE ASPER RESSPO MANUAL AND AS PER DIRECTION. | LAYING, SAGGING, STRINGING, BINDING ETC OF ALL TYPE CABLE NEW ON THE NEWLY ERECTED POLE ANY OTHER PLACE ASPER RESSPO MANUAL AND AS PER DIRECTION. |
| 9 | LAYING, SAGGING, STRINGING, BINDING ETC OF LT ARMOURED CABLE 3.5x70 & 3.5x120 SQMM NEW ON THE NEWLY ERECTED POLE ANY OTHER PLACE AS PER RESSPO MANUAL AND AS PER DIRECTION OF SUPERVISING ENGINEER. | LAYING, SAGGING, STRINGING, BINDING ETC OF LT ARMOURED CABLE 3.5x70 & 3.5x120 SQMM NEW ON THE NEWLY ERECTED POLE ANY OTHER PLACE AS PER RESSPO MANUAL AND AS PER DIRECTION OF SUPERVISING ENGINEER. |
| 10 | THREE CHOOPING OF 11 KV LINE | THREE CHOOPING OF 11 KV LINE |
| 11 | SUPPLY & INSTALLATION OF ALL TYPE CLAMPS | SUPPLY & INSTALLATION OF ALL TYPE CLAMPS |
| 12 | SUPPLY OF DIFFERENT SIZE OF NUT BOLT | SUPPLY OF DIFFERENT SIZE OF NUT BOLT |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
TodayBid Submission Deadline
Online submission via eProcurement portal.
TodayBid Opening Date
Technical bids will be opened and evaluated.
TodayTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender