Name of Work:- RHTS,Hanger Shutter and Incinerator defect works on INS Project
Sl. No.
Item Description
1
The following RHTS,Hanger Shutter and Incinerator defect works to be carried out and satisfactory trials to be showned to the ship, all spares,consumables,certified tools and tackles,masuring instruments shell be within the contractor's scope of supply
2
A) RHTS works
3
Survey wire ropes, spare gear and other associated lifting gears to be renewed.
4
Inspect and replace hydraulic valve
5
B) Hanger Shutter works
6
Check gear box seals for sign of damage. Replace gear box seals
7
C) Incinerator works
8
INCINERATOR BOOSTER PUMPCarry out overhauling and performance trial of the pump including parameter checks (suction/ discharge pressure), vibration trials, insulation/ SPM checks on motor, motor starting-running current checks etc.
9
Carry out functional test of relief valve. Reset to specified lifting pressure.Set Pressure - 08 Bar
10
Inspect the suction strainer.Manufacture of new strainer as per sample
11
Carryout overhauling of suction and discharge valves.Replace defective valves.(a) Size - 25 MM Type - Ball Valve , Qty -01, Mat - CS
12
(b) Size - 20 MM Type - Ball Valve , Qty -01, Mat - CS
13
Disassemble flue gas fan and inspect impeller. Replace defective impeller Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.