Tender For Periodical Services To Certain Otm Accn And Connected Works At Aundh Mil Station Under Ge (Mh & Rh) Khadki.
Tender Value
Ref. Documents
Estimated cost
Bid Submission
11 Jul 2026
2 days left
EMD
50000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Pune → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Periodical Services To Certain Otm Accn And Connected Works At Aundh Mil Station Under Ge (Mh & Rh) Khadki.
BOQ
| Sl. No. | Item Description |
| 1 | Material and labour for preparation of plastered or unplastered old decorated surfaces of walls including brooming down or scraping down with steel wire brushes of smoke spots, moulds, moss efflorescent salts, treating oil and greasy spots and applying of one coat of oil bound distemper on walls complete all as specified and directed. |
| 2 | Material and labour for preparation of plastered or unplastered old decorated surfaces of walls including brooming down or scraping down with steel wire brushes of smoke spots, moulds, moss efflorescent salts, treating oil and greasy spots and applying of two coat of oil bound distemper on walls complete all as specified and directed. |
| 3 | Material and labour for Complete removal of existing treatment of any description on walls with steel wire brushes etc., and applying two or more coats of Cement based Wall Care Putty having average minimum thickness of 3mm of make JK / Birla / Jenson & Nicholson / Altec on walls including rubbing with sand paper to obtain a smooth surface and making good any undulations on the surfaces and applying two coats of oil bound distemper over one coat of alkali resistant primer on walls complete all as specified and directed. |
| 4 | Material and labour for preparation of plastered or unplastered old decorated surfaces of walls including brooming down or scraping down with steel wire brushes of smoke spots, moulds, moss efflorescent salts, treating oil and greasy spots and applying of two coat of luster paint on walls complete all as specified and directed. |
| 5 | Material and labour for preparation of plastered or unplastered old decorated surfaces of ceiling including brooming down or scraping down with steel wire brushes of smoke spots, moulds, moss efflorescent salts, treating oil and greasy spots and applying of one coat of white wash on ceiling surfaces complete all as specified and directed. |
| 6 | Material and labour for complete removal of existing finishes by scraping down old decorative surface of walls with steel wire brushes and removing smoke spots, moulds, efflorescent salts including filling of spots with POP , chalk whiting priming and applying three coats of white wash on old surfaces of ceiling complete all as specified and directed. |
| 7 | Material and labour for preparation of plastered or unplastered old decorated surfaces of walls including brooming down or scraping down with steel wire brushes of smoke spots, moulds, moss efflorescent salts, treating oil and greasy spots and applying of one coat of cement base paint on walls complete all as specified and directed. |
| 8 | Material and labour for preparation of plastered or unplastered old decorated surfaces of walls including brooming down or scraping down with steel wire brushes of smoke spots, moulds, moss efflorescent salts, treating oil and greasy spots and applying of two coat of cement base paint on walls complete all as specified and directed. |
| 9 | Material and labour for preparation of plastered or unplastered old decorated surfaces of walls including brooming down or scraping down with steel wire brushes of smoke spots, moulds, moss efflorescent salts, and applying of one coat of white wash on walls complete all as specified and directed. |
| 10 | Material and labour for preparation of previously treated wood or wood based surfaces of any description over 10 cm width or girth and applying one coat of synthetic enamel paint complete all as specified and directed. |
| 11 | Material and labourfor preparing old painted steel and iron surfaces of any description over 10 cm width or girth not otherwise described and applying one coat of synthetic enamel paint complete all as specified and directed. |
| 12 | Material and labour for complete removal of existing treatment of old decorated surfaces of walls including brooming down or scraping down with steel wire brushes of smoke spots & preparing the surfaces and applying two coats of finishing walls with Premium Acrylic Smooth exterior emulsion paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)® upto 4 storey complete all as specified and directed.Make: Asian/Berger/Nerolac Note : Rate quoted by the contractor deemed to be include. Safety precautions like rope, safety belts, helmets , ladder etc & shall be responsibility of contractor. |
| 13 | Material and labour for removing peepul plant or any type of plant/ vegetations/Grass with root from wall, roof slab, over head tank portions, shafts, rain water pipe portions etc, and applying suitable chemical/ herbicide to the affected area to stop further growth and making good damaged portions with PCC 1:2:4 type B1 (20mm graded stoneaggerate) & plaster in CM 1:4 complete all as specified and directed. Note : Rate quoted by the contractor deemed to be include. Safety precautions like rope, safety belts, helmets , ladder etc & shall be responsibility of contractor. |
| 14 | Material and labour for preparation of previously treated surfaces of walls/Concrete and old plaster and applying one coat of synthetic enamel paint complete all as specified and directed. |
| 15 | Taking down cement or cement lime plaster from brick walls etc including raking out joints, hacking for key scrubbing down with water etc, complete all as specified and directed. |
| 16 | Material and labour for rendering 10mm thick on fair faces of brick work or concrete surface in cement mortar 1:6 finished even & smooth without using extra cement complete all as specified and directed. |
| 17 | Material and labour for applying two coat of oil bound distemper over a coat of primer to newly plastered surface including preparation of new plastered surfaces to wall complete all as specified and directed. |
| 18 | Material and labour for rendering 10 mm thick in cement mortar 1:3 on fair faces of concrete surfaces of ceiling finishing even and smooth without using extra cement complete all as specified and directed. |
| 19 | Material and labour for applying two coats of cement base paint to newly plastered surface of wall including preparation complete all as specified and directed. |
| 20 | Material and labour for 10 mm thick plastering in CM 1:3 on ceiling surfaces including a thin layer of sagol finished even and smooth complete all as specified and directed. |
| 21 | Material and labour for applying three coats of white wash to newly plastered surface of ceiling including preparation complete all as specified and directed. |
| 22 | Material and labour for providing water proofing plaster at the junction of wall and slab at chajjas, lintels etc, of average thickness 20mm in CM (1:3) with WPC including making drip on edges, finished even and smooth without using extra cement complete all as specified and directed,Note:WPC shall be measured and paid seperately. |
| 23 | Supply only intergral water proofing compound complete all as specified and directed. |
| 24 | Material and labour For PCC 1:2:4 type B0 (12.5 mm graded stone aggregate) in lintel upto 1.5mtr clear span, cills, steps, seismic and other similar bands, plinth course, string course, lacing course, parapete and railing upto 60cm in height, copings, kneelers, apex stone, bed plates, water throughs and like including weathering, slightly rounded for chamfered angles and throating including demoilition and removal of rubish off the premises complete all as specified and directed . |
| 25 | Hacking out old broken glass (any thickness size quality or description) from wooden frames etc glazed with putty or fixed with beads, complete all as specified and directed. |
| 26 | Supply and fix 4.8 mm thick sheet glass, ordinary quality and glazing in squares exceeding 0.5 Sqm in each pane complete all as specified and directed. |
| 27 | Supply and fix in repairs Figured glass, pinhead type 4mm thick glazing with oil putty in squares n exc 0.5 sqm each pane complete all as specified and directed. |
| 28 | Material and labour for spraying chemical /Herbicide of make Excel Mera 71 or equivalent on grass all around the building to remove grass for width nexc 0.75cm complete all as specified and directed. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jun 20, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedJul 11, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysJul 13, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender