Tender For maintenance of Completed Works Narela Zone.Sh : Supplying Of Potable Water Treated Through Ro Plant For Drinking Purpose & Supplying Softened Water For Non-Drinking Purpose At Pocket 3,4,6,7,9,11,13&14, Sector A-1 To A-4, Narela Delhi.
Tender Overview
Project Description
Tender for maintenance of Completed Works Narela Zone.Sh : Supplying Of Potable Water Treated Through Ro Plant For Drinking Purpose & Supplying Softened Water For Non-Drinking Purpose At Pocket 3,4,6,7,9,11,13&14, Sector A-1 To A-4, Narela Delhi.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 25-Jun-2026 | Corrigendum | Date | 16-Jul-2026 |
| 2 | 09-Jul-2026 | Corrigendum 3 | Date | 20-Jul-2026 |
| 3 | 25-Jun-2026 | Corrigendum | Date | 16-Jul-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Supplying of RO treated potable water for drinking purpose using RO plant of capacity 10000 lph i/c designing, testing, commissioning, maintenance (necessary maintenance of electric parts, wires, cables, pumps, motors etc.) and operation for three years in two shift (Each shift means 8 hours working). The treatment process shall include filtration, micro filtration, membrane filtration, Disinfection etc. as per detailed scope of work and special terms and conditions, whatever required as per quality of raw water. The treated water shall confirm to the drinking water parameters as per BIS 10500:2012 and as per direction and satisfaction of Engineer-in-Charge.(Excluding the cost of skilled labour and consumables for operation for a period of 3 years) |
| 2 | Supplying of RO treated potable water for drinking purpose using RO plant of capacity 15000 lph i/c designing, testing, commissioning, maintenance (necessary maintenance of electric parts, wires, cables, pumps, motors etc.) and operation for three years in two shift (Each shift means 8 hours working). The treatment process shall include filtration, micro filtration, membrane filtration, Disinfection etc. as per detailed scope of work and special terms and conditions, whatever required as per quality of raw water. The treated water shall confirm to the drinking water parameters as per BIS 10500:2012 and as per direction and satisfaction of Engineer-in-Charge.(Excluding the cost of skilled labour and consumables for operation for a period of 3 years) |
| 3 | Supplying of RO treated potable water for drinking purpose using RO plant of capacity 25000 lph i/c designing, testing, commissioning, maintenance (necessary maintenance of electric parts, wires, cables, pumps, motors etc.) and operation for three years in two shift (Each shift means 8 hours working). The treatment process shall include filtration, micro filtration, membrane filtration, Disinfection etc. as per detailed scope of work and special terms and conditions, whatever required as per quality of raw water. The treated water shall confirm to the drinking water parameters as per BIS 10500:2012 and as per direction and satisfaction of Engineer-in-Charge.(Excluding the cost of skilled labour and consumables for operation for a period of 3 years) |
| 4 | Providing, installation and commissioning of water softening plant having a capacity of 150 KLD (Augmentation of capacity of already existing installed system) including necessasry maintenenace of electric parts, wires, cables, pumps, motors etc. and operation for next 3 years complete, in all respect as per satisfaction and direction of Engineer-in-charge.(Excluding cost of consumables and skilled labour for operation for a period of 3 years) |
| 5 | Providing, installation and commissioning of water softening plant having a capacity of 200 KLD (Augmentation of capacity of already existing installed system) including necessasry maintenenace of electric parts, wires, cables, pumps, motors etc. and operation for next 3 years complete, in all respect as per satisfaction and direction of Engineer-in-charge.(Excluding cost of consumables and skilled labour for operation for a period of 3 years) |
| 6 | Providing, installation and commissioning of water softening plant having a capacity of 250 KLD (Augmentation of capacity of already existing installed system) including necessasry maintenenace of electric parts, wires, cables, pumps, motors etc. and operation for next 3 years complete, in all respect as per satisfaction and direction of Engineer-in-charge.(Excluding cost of consumables and skilled labour for operation for a period of 3 years) |
| 7 | Providing, installation and commissioning of water softening plant having a capacity of 300 KLD (Augmentation of capacity of already existing installed system) including necessasry maintenenace of electric parts, wires, cables, pumps, motors etc. and operation for next 3 years complete, in all respect as per satisfaction and direction of Engineer-in-charge.(Excluding cost of consumables and skilled labour for operation for a period of 3 years) |
| 8 | Providing, installation and commissioning of water softening plant having a capacity of 425 KLD (Augmentation of capacity of already existing installed system) including necessasry maintenenace of electric parts, wires, cables, pumps, motors etc. and operation for next 3 years complete, in all respect as per satisfaction and direction of Engineer-in-charge.(Excluding cost of consumables and skilled labour for operation for a period of 3 years) |
| 9 | SCHEDULEOF QUANTITY (B) |
| 10 | Day to day running, operation and maintenance of RO Plant & softening plant in Two shifts working (each shift having 8 working hours) for three years by deploying one skilled operator cum technician per shift as per direction and satisfaction of Engineer- in-Charge. |
| 11 | Day to day maintenance of RO Plants i/c cost of consumable like chemical, anti – scalant solution , PH correction solution etc all complete for three years as per direction of Engineer- in – Charge |
| 12 | Anti-Scalant dosing chemical (double shift of 8 hours consumption per month) RO plant. |
| 13 | PH Booster |
| 14 | CIP chemical |
| 15 | Replacement of micron cartilage filter. |
| 16 | Replacement of membrane of size 8\\"x40\\" including P/F in plant ( contractor shall replace newly layed membrance if found out of order during running and in operational period. |
| 17 | Water Testing of treated water from RO Plant for chemical and bacteriological parameters from DDA approved laboratory after every three months including collection, transportation and submission of reports, complete as per direction and satisfaction of engineer-in-charge. |
| 18 | Day to day maintenance of softening Plants of various capacity as required i/c cost of consumable like salt, Hypo chlorite, test kit etc all complete for three years as per satisfaction and direction of Engineer- in- Charge |
| 19 | Salt, sodium chloride or equivalent etc. |
| 20 | Hypo chlorite or equivalent etc. |
| 21 | Test kit |
| 22 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. |
| 23 | Terms & Conditions:-i) The tenderer are advised to visit the site before submitting their ratesii) The RO plants & softening plants shall be operated continuously in 2 shifts and no holiday shall be allowed.iii) The RO plants & softening plants shall be taken back by the department in good and running condition after expiry of the contract period.iv) Recovery of water should be more than 70% of supply water and the same shall be disposed to the flushing tank by the agency by suitable arrangement for which nothing extra will be paid to the agency.v) The contractor shall clean the premises wherein RO plant/Softening plants have been installed. Any challan levied by any civic agency shall be borne by the contractor and no claim shall be entertained by the Department in this regardsvi) Work shall be closed as and when the water from DJB is available in adequate amount and for the same no payment/ compensation shall be payable to the agencyvii) Payment of consumables shall be done as per consumption.viii) All the RO plant/ Softening plant as mentioned in schedule A shall have to be installed/commissioned within three months.ix) The contractor shall maintain and operate RO/softening plant for 3 years, in case of breakdown during O&M period, the contractor shall carry & potable drinking water through tankers from Delhi Jal Board at his own cost & no extra payment shall be admissiblex) The ground water from nearby tubewell will be supplied as raw water to the RO/softening plant. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 6 daysCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 10 daysCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 6 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 11 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender