Housing Urban and Rular Development Local Bodies Closing in 10 days TDR #56089466

Tender For maintenance of Completed Works Narela Zone.Sh : Supplying Of Potable Water Treated Through Ro Plant For Drinking Purpose & Supplying Softened Water For Non-Drinking Purpose At Pocket 3,4,6,7,9,11,13&14, Sector A-1 To A-4, Narela Delhi.

Issued by Local Bodies · Delhi, Delhi
Tender Value
11.71 Crore
Estimated cost
Bid Submission
20 Jul 2026
10 days left
EMD
21.71 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Delhi → Delhi
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for maintenance of Completed Works Narela Zone.Sh : Supplying Of Potable Water Treated Through Ro Plant For Drinking Purpose & Supplying Softened Water For Non-Drinking Purpose At Pocket 3,4,6,7,9,11,13&14, Sector A-1 To A-4, Narela Delhi.

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 25-Jun-2026 Corrigendum Date 16-Jul-2026
2 09-Jul-2026 Corrigendum 3 Date 20-Jul-2026
3 25-Jun-2026 Corrigendum Date 16-Jul-2026

BOQ

Name of Work:- M/o Completed works Narela Zone.SH : Supplying of potable water treated through RO plant for drinking purpose & supplying softened water for non-drinking purpose at Pocket 3,4,6,7,9,11,13&14, Sector A-1 to A-4, Narela Delhi.
Sl. No. Item Description
1Supplying of RO treated potable water for drinking purpose using RO plant of capacity 10000 lph i/c designing, testing, commissioning, maintenance (necessary maintenance of electric parts, wires, cables, pumps, motors etc.) and operation for three years in two shift (Each shift means 8 hours working). The treatment process shall include filtration, micro filtration, membrane filtration, Disinfection etc. as per detailed scope of work and special terms and conditions, whatever required as per quality of raw water. The treated water shall confirm to the drinking water parameters as per BIS 10500:2012 and as per direction and satisfaction of Engineer-in-Charge.(Excluding the cost of skilled labour and consumables for operation for a period of 3 years)
2Supplying of RO treated potable water for drinking purpose using RO plant of capacity 15000 lph i/c designing, testing, commissioning, maintenance (necessary maintenance of electric parts, wires, cables, pumps, motors etc.) and operation for three years in two shift (Each shift means 8 hours working). The treatment process shall include filtration, micro filtration, membrane filtration, Disinfection etc. as per detailed scope of work and special terms and conditions, whatever required as per quality of raw water. The treated water shall confirm to the drinking water parameters as per BIS 10500:2012 and as per direction and satisfaction of Engineer-in-Charge.(Excluding the cost of skilled labour and consumables for operation for a period of 3 years)
3Supplying of RO treated potable water for drinking purpose using RO plant of capacity 25000 lph i/c designing, testing, commissioning, maintenance (necessary maintenance of electric parts, wires, cables, pumps, motors etc.) and operation for three years in two shift (Each shift means 8 hours working). The treatment process shall include filtration, micro filtration, membrane filtration, Disinfection etc. as per detailed scope of work and special terms and conditions, whatever required as per quality of raw water. The treated water shall confirm to the drinking water parameters as per BIS 10500:2012 and as per direction and satisfaction of Engineer-in-Charge.(Excluding the cost of skilled labour and consumables for operation for a period of 3 years)
4Providing, installation and commissioning of water softening plant having a capacity of 150 KLD (Augmentation of capacity of already existing installed system) including necessasry maintenenace of electric parts, wires, cables, pumps, motors etc. and operation for next 3 years complete, in all respect as per satisfaction and direction of Engineer-in-charge.(Excluding cost of consumables and skilled labour for operation for a period of 3 years)
5Providing, installation and commissioning of water softening plant having a capacity of 200 KLD (Augmentation of capacity of already existing installed system) including necessasry maintenenace of electric parts, wires, cables, pumps, motors etc. and operation for next 3 years complete, in all respect as per satisfaction and direction of Engineer-in-charge.(Excluding cost of consumables and skilled labour for operation for a period of 3 years)
6Providing, installation and commissioning of water softening plant having a capacity of 250 KLD (Augmentation of capacity of already existing installed system) including necessasry maintenenace of electric parts, wires, cables, pumps, motors etc. and operation for next 3 years complete, in all respect as per satisfaction and direction of Engineer-in-charge.(Excluding cost of consumables and skilled labour for operation for a period of 3 years)
7Providing, installation and commissioning of water softening plant having a capacity of 300 KLD (Augmentation of capacity of already existing installed system) including necessasry maintenenace of electric parts, wires, cables, pumps, motors etc. and operation for next 3 years complete, in all respect as per satisfaction and direction of Engineer-in-charge.(Excluding cost of consumables and skilled labour for operation for a period of 3 years)
8Providing, installation and commissioning of water softening plant having a capacity of 425 KLD (Augmentation of capacity of already existing installed system) including necessasry maintenenace of electric parts, wires, cables, pumps, motors etc. and operation for next 3 years complete, in all respect as per satisfaction and direction of Engineer-in-charge.(Excluding cost of consumables and skilled labour for operation for a period of 3 years)
9SCHEDULEOF QUANTITY (B)
10Day to day running, operation and maintenance of RO Plant & softening plant in Two shifts working (each shift having 8 working hours) for three years by deploying one skilled operator cum technician per shift as per direction and satisfaction of Engineer- in-Charge.
11Day to day maintenance of RO Plants i/c cost of consumable like chemical, anti – scalant solution , PH correction solution etc all complete for three years as per direction of Engineer- in – Charge
12Anti-Scalant dosing chemical (double shift of 8 hours consumption per month) RO plant.
13PH Booster
14CIP chemical
15Replacement of micron cartilage filter.
16Replacement of membrane of size 8\\"x40\\" including P/F in plant ( contractor shall replace newly layed membrance if found out of order during running and in operational period.
17Water Testing of treated water from RO Plant for chemical and bacteriological parameters from DDA approved laboratory after every three months including collection, transportation and submission of reports, complete as per direction and satisfaction of engineer-in-charge.
18Day to day maintenance of softening Plants of various capacity as required i/c cost of consumable like salt, Hypo chlorite, test kit etc all complete for three years as per satisfaction and direction of Engineer- in- Charge
19Salt, sodium chloride or equivalent etc.
20Hypo chlorite or equivalent etc.
21Test kit
22Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank.
23Terms & Conditions:-i) The tenderer are advised to visit the site before submitting their ratesii) The RO plants & softening plants shall be operated continuously in 2 shifts and no holiday shall be allowed.iii) The RO plants & softening plants shall be taken back by the department in good and running condition after expiry of the contract period.iv) Recovery of water should be more than 70% of supply water and the same shall be disposed to the flushing tank by the agency by suitable arrangement for which nothing extra will be paid to the agency.v) The contractor shall clean the premises wherein RO plant/Softening plants have been installed. Any challan levied by any civic agency shall be borne by the contractor and no claim shall be entertained by the Department in this regardsvi) Work shall be closed as and when the water from DJB is available in adequate amount and for the same no payment/ compensation shall be payable to the agencyvii) Payment of consumables shall be done as per consumption.viii) All the RO plant/ Softening plant as mentioned in schedule A shall have to be installed/commissioned within three months.ix) The contractor shall maintain and operate RO/softening plant for 3 years, in case of breakdown during O&M period, the contractor shall carry & potable drinking water through tankers from Delhi Jal Board at his own cost & no extra payment shall be admissiblex) The ground water from nearby tubewell will be supplied as raw water to the RO/softening plant. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56089466
AUTHORITY Local Bodies
TENDER VALUE 11.71 Crore
LAST DATE 20-07-2026
Authority
Authority Name Delhi Development Authority
Work Description Tender for maintenance of Completed Works Narela Zone.Sh : Supplying Of Potable Water Treated Through Ro Plant For Drinking Purpose & Supplying Softened Water For Non-Drinking Purpose At Pocket 3,4,6,7,9,11,13&14, Sector A-1 To A-4, Narela Delhi.
Basic Detail
Tender No 03/EE/NPD-2/DDA/2026-27
Bidding Type Tender
Location
City Delhi
State Delhi
Key Dates
Publish Date 09 Jul 2026
Submission Date 20 Jul 2026
Open Date 21 Jul 2026
Finance
Tender Value 11.71 Crore
Tender Fee Ref. Documents
EMD 21.71 Lakhs
Exemption Not Available
Document List
BOQ_960524.xls
d1a120bf-9445-4272-ae49-8db0d810e721.html
NIT03.pdf
Tendernotice_1 (2).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 09, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 16, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 6 days
Jul 20, 2026
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 10 days
Jul 16, 2026
18:00 IST

Corrigendum-3 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 6 days
Jul 20, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 10 days
Jul 21, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 11 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_960524.xls

html

d1a120bf-9445-4272-ae49-8db0d810e721.html

pdf

NIT03.pdf

pdf

Tendernotice_1 (2).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders