|
| 1 | Dismantaling of lime and cement mortor work including all complete of work. |
| 2 | Earth work in excavation in foul position soil lead 50mt.& lift 1.5 mt. incl. lab. T&P etc all complete. |
| 3 | Diversion by diesel pump including all complete. |
| 4 | P/L of base concrete in 1:6:12 with cement, L-Sand and 40mm S/B including mat. Lab. T&P,etc all complete. |
| 5 | M 150 class brick work in 1:4 with cement &approved Course Sand mortar including supply all material and S.I.N. labor etc. |
| 6 | 12mm thick cement plaster in 1:4 cement mortor with 1 cement and 4 coarse sand including etc. all complete of work. |
| 7 | P/L of CC 1:2:4 top of drain |
| 8 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (S.I No-289) |
| 9 | M.S. (Tor steel or plain) in plain work such as R.C.C or R.B work Including bending for proper shape as necessary including bending for proper completion of the work and Including supply of all steel & wastage, bend, hooks, and authorised overlapping shall be measured. (S.I-504) |
| 10 | P/F of floor tiles |
| 11 | S/Laying of GSB 53.-9.5 mm thick S/B upto 10Cm loose Layer including etc. all complete of work. |
| 12 | Consolidation of GSB upto 10 cm thick loose layer by hand ramming including etc. all.complete. |
| 13 | Water allowance to be allowed on above incl.Lab. T&P,etc all complete. |
| 14 | P/L of 125 micron polythin sheet |
| 15 | P/L C.C in 1:1.5:3 for road work. with cement, Course Sand20 mm & Stone Grit including supply of all material and labour etc. |
| 16 | P/Fixing of LED System 25 watt incl with pole and wireing all complete of work. |
| 17 | P/F of RCC bench |
| 18 | Painting of slab with one coat oil paint with all complete of work. |
| 19 | P/L of M.S sheet plate |
| 20 | CC cutting grove by machine |
| 21 | P/F of summer sable pump |
| 22 | Deduction cost of dismental materials - Old brick |
| 23 | Deduction cost of dismental materials - Old brick bats. |
| 24 | Plumbering work |
| 25 | Electrification work. Please Enable Macros to View BoQ information |