| 1 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 2 | Renewing one damaged PSC/RCC Transformer DP structure with a new A type Transformer DP including excavation, dismantling accessories like AB switch, DO fuse, LA, LT fuses, HT, LT and earth connections, dismantling existing Transformer, keeping it in safe custody and re erecting all accessories including Transformer on the new DP as per standards and drawing sufficient length of GI earthing leads to the ground for earthing, excluding renewal of pipe earthing. |
| 3 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 4 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. |
| 5 | Renewal of existing damaged/old 11kV PSC/RCC Pole with new A type pole in place including excavation, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except pole. |
| 6 | Insertion of one HT A type pole in existing OH line including digging & backfilling pit in ordinary soil, fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 7 | Renewal of existing damaged/old 11kV PSC/RCC DP with new A type DP in place including excavation, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except poles. |
| 8 | Fitting and erecting one HT Double Pole Structure using A type pole in position including fitting 2 No. channel cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 9 | Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides. |
| 10 | Stringing of one km 3 PH 11kV line with XLPE Insulated ACSR Raccoon or equivalant (3 conductors) after fitting insulators, binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and removing tree branches wherever necessary excluding cut point works. |
| 11 | Transporting UG Cable |
| 12 | Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. |
| 13 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 14 | Renewal of existing damaged/old 11kV PSC/RCC Pole with new PSC pole in place including excavation, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except pole. |
| 15 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. |
| 16 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 17 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole including conveyance of materials. |
| 18 | Straightening one slanted 11kV pole after unbinding the line and binding the line after work. |
| 19 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 20 | Fitting one set (3No.) 11kV LA and giving connections excluding earthing. |
| 21 | Insertion of one HT PSC pole in existing HT/LT line including digging & back filling of pit in ordinary soil, fitting cross arm, insulator, binding etc. , drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 22 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 23 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 24 | Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point. |
| 25 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 26 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. |
| 27 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. |
| 28 | Additional rate for excavation of Pit for A type pole in Laterite. |
| 29 | Additional rate for excavation of Pit for A type pole in Hard Laterite. |
| 30 | Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite. |
| 31 | Additional rate for providing one HT Pin with insulator, complete on any type of HT pole. |
| 32 | Renewal of existing damaged/old 11kV Stay with new stay in place including excavation & backfilling of pit, dismantling, refitting of all items and conveyance of all materials. |
| 33 | Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil. |
| 34 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 35 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap 16-95 sqmm |
| 36 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 37 | Fitting one LT 4 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT Line. |
| 38 | Renewal of one damaged HT Pin insulator. |
| 39 | Renewal of existing damaged/broken old 11kV Stay to the existing stay rod. Please Enable Macros to View BoQ information |