| 1 | CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.3 M.S. Pipes 2.3.1 Gas cutting of M.S. pipes and/or M.S. plates of different thickness all complete as per specification and direction of the Engineer-in- Charge. Thikness in mm 5mm to 8mm thick plate |
| 2 | SUPPLY OF MS PIPE MADE OUT OF 8 MM THICK MS PLATE I/C WELDING, CUTTING, PAINTING BOTH APPROVED SIDE WITH BLACK ANTICORROSIVE BITUMINOUS PAINT OF APPROVED BRAND AND TESTED TO A HEAD OF RATE 15 KG/SQM CONFORMING TO IS 3589/1981, IS 7322-1974, IS 784-1978 AND RELEVANT CODES I/C COST OF PLATE AND CARRIAGE AT SITE COMPLETE AS DIRECTED BY ENGINEER-IN-CHARGE. (ACTUAL WEIGHT WILL BE PAID) A/R. RATE TAKEN FROM DELHI JAL BOARD SCHEDULE 2024-25. |
| 3 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. B. REPAIRING 2. Welding in M.S. structural work with gas or electric: (b) Continuous weld. |
| 4 | CHAPTER - VII MISCELLANEOUS ITEMS Dewatering by pumps including all leads, lifts and making all arrangements of disposal. where continuous flow of water from a source other than natural or ground water is encountered in case of emergency maintenance works related to leakage. breakage and making wet connections. [Note ;- In case of any other situation demanding such emergency dewatering. use of this item is to be approved by the Superintending Engineer/Tender Accepting Authority. This item shall be executed on the specific direction duly supported by proper clarification of the E.I.C. who will be satisfied in absolute discretion that such work has not been necessitated due to any natural source of water or any fault of the Contractor |
| 5 | CHAPTER - VIII SUPPLYING OF MATERIALS HIRE CHARGES OF MACHINERIES 8.28Hire charges of lighting generator of capacity 5KVA including fuel, mobil, operator, carriage etc. including all complete for water supply works. For beyond 8hrs. of working |
| 6 | CHAPTER - VII MISCELLANEOUS ITEMS Coating of 'Food Gr. Epoxy' Resin of thickness not less than 240 micron with a low-viscosity, crystallization-resistant food grade epoxy resin base with a reactive diluents combined with high build epoxy amine adducts as per BS 5493 standard and a polyamide or amido polyamine or any other suitable hardener. It shall react with epoxy resin at normal ambient temperature, suitable for solvent-free coatings as per recommended proportion for use on metal, concrete and wood surface to protect from corrosion, give anti-fungal properties ,as per guide line of FDA and USDA as well as damage from chemical reaction after making the surface free from dust, oil and moisture etc. all complete as per instruction and to the satisfaction of ElC. [ This item will be operated on prior permission from the concerned SE/Dy Chief Engineer] |
| 7 | CHAPTER - VIII SUPPLYING OF MATERIALS HIRE CHARGES OF MACHINERIES 8.26 Hire charges of moveable crane with fuel & manpower having load handling capacity upto 14MT with the 45 deg. moveable arrangement & the boom length of 40 feets for loading & unloading of various materials / accessories of water supply works. For minimum engagement of 8 hrs. In a day |
| 8 | CHAPTER - VIII SUPPLYING OF MATERIALS Supply of M.S. Flange (slipper type) as per IS-6392 TABLE 17 Thickness - 20mm -22mm NB Diameter in mm 300 |
| 9 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. |
| 10 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 17)Fitter Mechanic. Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. |
| 11 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 18)Fitter Mechanic (Helper). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. |
| 12 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 24)Welder. Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. |
| 13 | Sub Total |
| 14 | GST 18% |
| 15 | CESS 1% Please Enable Macros to View BoQ information |