|
| 1 | Cleaning of internal wall/floors of RCC over head reservoir of Capacity 25000 Gallon including removing fine sand/silt deposited inside the over head reservoirs with the help of wire brushes and removing any fungus formation inside the tank, removing the waste by opening wash out valves and applying caustic soda solution and one coat of lime wash internally including cement base white wash of complete OH tank to the external wall, bottom surface, pillar and painting of raising main pipe line and delivery line by black paint and writing work with one coat of synthetic enamel paint as per colour code mentioning (a) date of cleaning (b) Next due date of cleaning (c) Capacity of tank etc, complete all as specified and as directed.NOTE :All precautionery measure such as safety belt, climbing rope, scaffolding etc to be taken by the contractor to safeguard human life while working on overhead reservoir. The rates quoted for the item shall be inclusive of the same. |
| 2 | Cleaning of internal wall/floors of RCC over head reservoir of Capacity 50000 Gallon including removing fine sand/silt deposited inside the over head reservoirs with the help of wire brushes and removing any fungus formation inside the tank, removing the waste by opening wash out valves and applying caustic soda solution and one coat of lime wash internally including cement base white wash of complete OH tank to the external wall, bottom surface, pillar and painting of raising main pipe line and delivery line by black paint and writing work with one coat of synthetic enamel paint as per colour code mentioning (a) date of cleaning (b) Next due date of cleaning (c) Capacity of tank etc, complete all as specified and as directed.NOTE :All precautionery measure such as safety belt, climbing rope, scaffolding etc to be taken by the contractor to safeguard human life while working on overhead reservoir. The rates quoted for the item shall be inclusive of the same. |
| 3 | Cleaning of internal wall/floors of RCC over head reservoir of Capacity 100000 Gallon including removing fine sand/silt deposited inside the over head reservoirs with the help of wire brushes and removing any fungus formation inside the tank, removing the waste by opening wash out valves and applying caustic soda solution and one coat of lime wash internally including cement base white wash of complete OH tank to the external wall, bottom surface, pillar and painting of raising main pipe line and delivery line by black paint and writing work with one coat of synthetic enamel paint as per colour code mentioning (a) date of cleaning (b) Next due date of cleaning (c) Capacity of tank etc, complete all as specified and as directed.NOTE :All precautionery measure such as safety belt, climbing rope, scaffolding etc to be taken by the contractor to safeguard human life while working on overhead reservoir. The rates quoted for the item shall be inclusive of the same. |
| 4 | Cleaning of internal walls for underground or semi underground sump located at Stage I and Stage II, Pump House of Capacity 50000 Gallons. The work also includes washing with clean water and bleaching powder including scraping with wire brush on walls and floors & removing mud and grits & deposits etc throw out properly to a distance not exceeding 50m including cement base white washing of external wall and painting of raising main pipe line and delievery line by black paint and Writing the date of cleaning and due date of cleaning on a rectangular box of size 75cm x 50cm, wriing in white in colour on black back all as specified and as directed. |
| 5 | Cleaning of internal walls for underground or semi underground sump located at Stage I and Stage II, Pump House of Capacity 100000 Gallons. The work also includes washing with clean water and bleaching powder including scraping with wire brush on walls and floors & removing mud and grits & deposits etc throw out properly to a distance not exceeding 50m including cement base white washing of external wall and painting of raising main pipe line and delievery line by black paint and Writing the date of cleaning and due date of cleaning on a rectangular box of size 75cm x 50cm, wriing in white in colour on black back all as specified and as directed. |
| 6 | Cleaning of internal walls for underground or semi underground sump located at Stage I and Stage II, Pump House of Capacity 20000 Gallons. The work also includes washing with clean water and bleaching powder including scraping with wire brush on walls and floors & removing mud and grits & deposits etc throw out properly to a distance not exceeding 50m including cement base white washing of external wall and painting of raising main pipe line and delievery line by black paint and Writing the date of cleaning and due date of cleaning on a rectangular box of size 75cm x 50cm, wriing in white in colour on black back all as specified and as directed. |
| 7 | Chlorine testing kit compete with test tubes, solution complete all as specified and directed. |
| 8 | Testing of water from the approved govt lab authority’ and test the following perameter of water :- PH range, Total solids, total hardness, Floride, Nitrites, Nitrates, Lead Arsenic, Ammonia, Chlorides, Cadmium, Cyanide, Mercury Iron, Management, Surphate, Phernolic and submission the report to Deptt or as directed.Note :- Water collected in presence of medical staff / MES staff and empty collection sample bottle will be provided by the contractor |
| 9 | Supply only chlorination chemical highly efficient (high strength) calcium based granular(65 to 70% chlorine content) disinfectant more stable than chlorine gas/bleaching powder high stable in sealed container for water treatment stability projected shelf life of chlorination of chemical must be one year with min loss of chlorine all as per the relevant IS. The contractor has to produce manufacturers distributor test certificate and purchase voucher Lot wise from authrozied dealer/company while supply of calcium based granual for the verification of genuiness of material. No material shall be accepted without test certificate. |
| 10 | Design, fabrication, installation, testing and commissioning of 110 ampere auto starter cum fault analyzer cumprotection & control panel at Stage-4 including following job:-1) Fabrication of Power Handling Unit (PHU) / Auto Starter with power contactor MNX-110-2Nos., MNX-70-1No. of L&T make along with MCCB of 160 ampere rating also of L&T make.2) The system should be provided with a solidstate fault analyzer cum controller.3) The complete system should be enclosed in a floor / wall mounted MS sheet enclosure / box of suitable gauge and dimensions with proper entry and exit holes for incoming and outgoing cables. The enclosure should be finished with powder coated painting from inside as well as from outer surface of approved colour. Job also includes mounting of the panel to the wall / floor of the pump room. METERING:4) The enclosure should be front shutter mounted with key locking system having glass window. Digital electronicvoltmeter & ampere meter should be providedalong with the required current transformer and selector switches. The internalcontrol wiring should be done with flexible PVC LT cable with proper thimbing ateach end. |
| 11 | Continued Item No. 10 FEATURES AND SPECIFICATIONS:5) The system should trip the motor on power failure and on appearance of an electrical fault mentioned below which may otherwise damage the motor field coils and should not restart automatically until unless the system is reset manually, thus providing automation to the system and protection to the motor.6) The system shall provide protection against: -a. Low voltage below 350 Vb. High Voltage above 450 Vc. Single phasingd. Reverse phasinge. Un Balanced phasingf. Dry runningg. Overloading |
| 12 | Continued Item No. 10 INFORMATION SECTION:-In addition the system should have the following audio & visual features for a quick and accurate diagnosis of the appeared fault/status for a speedy rectification of the system.7) Separate LED fault/status indicators.8) LED phase indicators. 9) An isolation by pass system, for fault analysis system, with a blinking indicator.10) 3 LED, contactor 'COIL OK', indicators, one for each of the contactors/coils. LEDstar & delta indicators to access the star to delta timing11) A tamper proof starting system to avoid manipulations by the motor operator to keep the system in a permanently ON positionJob further includes providing & fitting of accessories for connection from main panel. Complete job includes cost of panel/ material, labour charges, transportation/ shifting charges up to site of work, including installation, testing, commissioning and all taxes. |
| 13 | Design, fabrication, installation, testing and commissioning of 140 ampere auto starter cum fault analyzer cumprotection & control panel at Stage-4 including following job:-1) Fabrication of Power Handling Unit (PHU) / Auto Starter with power contactor MNX-140-2Nos., MNX-110-1No. of L&T make along with MCCB of 200 ampere rating also of L&T make.2) The system should be provided with a solidstate fault analyzer cum controller.3) The complete system should be enclosed in a floor / wall mounted MS sheet enclosure / box of suitable gauge and dimensions with proper entry and exit holes for incoming and outgoing cables. The enclosure should be finished with powder coated painting from inside as well as from outer surface of approved colour. Job also includes mounting of the panel to the wall / floor of the pump room. METERING:4) The enclosure should be front shutter mounted with key locking system having glass window. Digital electronicvoltmeter & ampere meter should be providedalong with the required current transformer and selector switches. The internalcontrol wiring should be done with flexible PVC LT cable with proper thimbing ateach end. |
| 14 | Continued Item No. 10 FEATURES AND SPECIFICATIONS:5) The system should trip the motor on power failure and on appearance of an electrical fault mentioned below which may otherwise damage the motor field coils and should not restart automatically until unless the system is reset manually, thus providing automation to the system and protection to the motor.6) The system shall provide protection against: -a. Low voltage below 350 Vb. High Voltage above 450 Vc. Single phasingd. Reverse phasinge. Un Balanced phasingf. Dry runningg. Overloading |
| 15 | Continued Item No. 10 INFORMATION SECTION:-In addition the system should have the following audio & visual features for a quick and accurate diagnosis of the appeared fault/status for a speedy rectification of the system.7) Separate LED fault/status indicators.8) LED phase indicators. 9) An isolation by pass system, for fault analysis system, with a blinking indicator.10) 3 LED, contactor 'COIL OK', indicators, one for each of the contactors/coils. LEDstar & delta indicators to access the star to delta timing11) A tamper proof starting system to avoid manipulations by the motor operator to keep the system in a permanently ON positionJob further includes providing & fitting of accessories for connection from main panel. Complete job includes cost of panel/ material, labour charges, transportation/ shifting charges up to site of work, including installation, testing, commissioning and all taxes. |
| 16 | Material and labour for painting and writing letters \\"SAVE WATER\\" in Black letter size 36\\"X18\\" on dome of over head water RCC tank and UG Sump , writing tank capacity and date of cleaning and due date of cleaning in capital letters of 80 mm size on external surface of wall with white synthetic enamel paint over black background of any capacity over head tank and UG Sump all as directed. NOTE :All precautionery measure such as safety belt, climbing rope, scaffolding etc to be taken by the contractor to safeguard human life while working on overhead reservoir. The rates quoted for the item shall be inclusive of the same. |
| 17 | Supply and fixing Glow sign board made of acrylic sheet reactangular shape having lighting arrangement of superior quality of size 5'x3'x1\\" showing installation Nomenclature as approved marked all as specified and directed. Note: Installation line diagram to be enfaced will be approved by AGE E/M and no extra will be paid of any addition and alteration of words or marking of colours. |
| 18 | Fabrication of angle stand made of angle size 50x50x6mm for Glow sign board, incl jointing of Tees, incl PCC all as specified and directed. |
| 19 | Preparation of new or previously untreated steel surfaces of any description not otherwise described, over 10cm width or girth and applying two coats of synthetic enamel paint of Ist quality over a coat of red oxide primer, complete all as specified and as directed. |
| 20 | Supply and fixing in replacement sluice valve size 80mm cast iron ISI marked with flanged ends drilled with iron wheels head shuts and open direction cast on it, class PN 1.6 confirming to IS 14846-2000 including necessary fixing arrangement such as rubber insulation , packing rings, joiniting materials nuts,bolts, washers , gaskets and packings material all as specified and directed . |
| 21 | Supply and fixing in replacement sluice valve size 100mm cast iron ISI marked with flanged ends drilled with iron wheels head shuts and open direction cast on it, class PN 1.6 confirming to IS 14846-2000 including necessary fixing arrangement such as rubber insulation , packing rings, joiniting materials nuts,bolts, washers , gaskets and packings material all as specified and directed . |
| 22 | Supply and fixing in replacement sluice valve size 150mm cast iron ISI marked with flanged ends drilled with iron wheels head shuts and open direction cast on it, class PN 1.6 confirming to IS 14846-2000 including necessary fixing arrangement such as rubber insulation , packing rings, joiniting materials nuts,bolts, washers , gaskets and packings material all as specified and directed . |
| 23 | Supply and fixing in replacement sluice valve size 200mm cast iron ISI marked with flanged ends drilled with iron wheels head shuts and open direction cast on it, class PN 1.6 confirming to IS 14846-2000 including necessary fixing arrangement such as rubber insulation , packing rings, joiniting materials nuts,bolts, washers , gaskets and packings material all as specified and directed . |
| 24 | Supply and fixing in replacement non return valve 100 mm dia heavy duty both ends flanged ISI marked,class PN 1.6 complete with nuts, bolts washers etc complete all as specified and directed. |
| 25 | Supply and fixing in replacement non return valve 150 mm dia heavy duty both ends flanged ISI marked,class PN 1.6 complete with nuts, bolts washers etc complete all as specified and directed. |
| 26 | Supply and fixing in replacement non return valve 200 mm dia heavy duty both ends flanged ISI marked,class PN 1.6 complete with nuts, bolts washers etc complete all as specified and directed. Please Enable Macros to View BoQ information |
| 27 | Supply and fixing in replacement non return valve 200 mm dia heavy duty both ends flanged ISI marked,class PN 1.6 complete with nuts, bolts washers etc complete all as specified and directed. Please Enable Macros to View BoQ information |