Name of Work:- मोदीनगर सीमांतर्गत कान्हा गौशाला मे छोटे तालाब पर ईटो का खंडजा लगाने का कार्य
Sl. No.
Item Description
1
Cleaning jungle including up rooting of rank, vegetations grass, push, wood treesand samplings of grith upto 30 cms.measured at a height of 1 M. above ground level and removal of rubbish up to a distance of 50M. out side theperipheryof area cleared.
2
Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M.in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levels and slopes and also including 1.50 M. lift and 30 M. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with-in :30 M. distance as directed by the Engineer incharge. excluding Royallity. Wherever applicable for small work or Abadi area.(Where machine con not reach/move
3
Concrete with 4 cm. guage stone ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundation and under floors including supply of all materials, labour Tools & plants etc.required for proper completion of the work.
4
M-150 Brick work in one cement and four corse sand (1:4 ) in foundation and plinth including supply of all materials labour, T&Petc. Reqd. For proper completion of the work
5
M-150 Brick work in one cement and four corse sand (1:4 ) in superstructure including necessary cutting & moulding of brick including supply of all materials labour, T&P etc. Reqd. for proper completion of the work.
6
12 mm thick cement plaster with cement and corse sand mortar 1:4 over brick work thickness not less than 1cm including of all work complete
7
Brick soling with strainght over burnt bricks laid flat and dry with brick edging on both sides including preparation of subgrade to prescribed camber and including supply of bricks, filling joints with local earth of P.I. 5 to 7, spreading blinding coat 1 cm (3/8\\") depth of local earth over the entire surface and including supply of all materials, labourTools & Plants etc. required for propercompletion of the work.
8
P/Laying of 150 mm dia PVC pipe
9
P.C.C work in 1:2:4 Cement, c/ sand, and 20 mm stone grit including supply of all materials, labour , T & P etc. As per S.I.No 279(a)
10
ADD GST 18% Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.