| 1 | WSS Neoch |
| 2 | Providing and fixing G.I/HDPE pipes complete with G.I. fittings excluding trenching and refilling etc. (external work).50 mm dia. nominal bore |
| 3 | 40 mm dia. nominal bore |
| 4 | 32 mm dia. nominal bore |
| 5 | 25mm dia. nominal bore |
| 6 | 20mm dia. nominal bore |
| 7 | 15mm dia. nominal bore |
| 8 | HDPE 63mm dia. nominal bore |
| 9 | HDPE 50mm dia. nominal bore |
| 10 | HDPE 40mm dia. nominal bore |
| 11 | HDPE 32mm dia. nominal bore |
| 12 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : |
| 13 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. |
| 14 | Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/by mechanical means including stacking of pipes within 50 meters lead as per direction of Engineer-in-charge :15 mm dia. nominal bore |
| 15 | 20 mm dia. nominal bore |
| 16 | 25 mm dia. nominal bore |
| 17 | 32 mm dia. nominal bore |
| 18 | 40 mm dia. nominal bore |
| 19 | 50 mm dia. nominal bore |
| 20 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work.15 mm dia. nominal bore G.I. pipes |
| 21 | 20 mm dia. nominal bore |
| 22 | 25 mm dia. nominal bore |
| 23 | 32 mm dia. nominal bore |
| 24 | 40 mm dia. nominal bore |
| 25 | 50 mm dia. nominal bore |
| 26 | Carriage of GI Pipe from Jammu to Site of Work for an average distance of 170 km by Mechanical transport and 10 km by head load. |
| 27 | Carriage of HDPE Pipe from Jammu to Site of Work for an average distance of 170 km by Mechanical transport and 10 km by head load. |
| 28 | WSS Dewal |
| 29 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work).80 mm dia. nominal bore |
| 30 | 65 mm dia. nominal bore |
| 31 | 50 mm dia. nominal bore |
| 32 | 40 mm dia. nominal bore |
| 33 | 32 mm dia. nominal bore |
| 34 | 25mm dia. nominal bore |
| 35 | 20mm dia. nominal bore |
| 36 | 15mm dia. nominal bore |
| 37 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : |
| 38 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. |
| 39 | Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/by mechanical means including stacking of pipes within 50 meters lead as per direction of Engineer-in-charge :15 mm dia. nominal bore |
| 40 | 20 mm dia. nominal bore |
| 41 | 25 mm dia. nominal bore |
| 42 | 32 mm dia. nominal bore |
| 43 | 40 mm dia. nominal bore |
| 44 | 50 mm dia. nominal bore |
| 45 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work.15 mm dia. nominal bore G.I. pipes |
| 46 | 20 mm dia. nominal bore |
| 47 | 25 mm dia. nominal bore |
| 48 | 32 mm dia. nominal bore |
| 49 | 40 mm dia. nominal bore |
| 50 | 50 mm dia. nominal bore |
| 51 | Carriage of GI Pipe from Jammu to Site of Work for an average distance of 170 km by Mechanical transport and 10 km by head load. |
| 52 | WSS Shibrass |
| 53 | Providing and fixing G.I/HDPE pipes complete with G.I. fittings excluding trenching and refilling etc. (external work).50 mm dia. nominal bore |
| 54 | 40 mm dia. nominal bore |
| 55 | 32 mm dia. nominal bore |
| 56 | 25mm dia. nominal bore |
| 57 | 20mm dia. nominal bore |
| 58 | 15mm dia. nominal bore |
| 59 | HDPE 63mm dia. nominal bore |
| 60 | HDPE 50mm dia. nominal bore |
| 61 | HDPE 40mm dia. nominal bore |
| 62 | HDPE 32mm dia. nominal bore |
| 63 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : |
| 64 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. |
| 65 | Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/by mechanical means including stacking of pipes within 50 meters lead as per direction of Engineer-in-charge :15 mm dia. nominal bore |
| 66 | 20 mm dia. nominal bore |
| 67 | 25 mm dia. nominal bore |
| 68 | 32 mm dia. nominal bore |
| 69 | 40 mm dia. nominal bore |
| 70 | 50 mm dia. nominal bore |
| 71 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work.15 mm dia. nominal bore G.I. pipes |
| 72 | 20 mm dia. nominal bore |
| 73 | 25 mm dia. nominal bore |
| 74 | 32 mm dia. nominal bore |
| 75 | 40 mm dia. nominal bore |
| 76 | 50 mm dia. nominal bore |
| 77 | Carriage of GI Pipe from Jammu to Site of Work for an average distance of 170 km by Mechanical transport and 10000 M by head load. |
| 78 | Carriage of HDPE Pipe from Jammu to Site of Work for an average distance of 170 km by Mechanical transport and 10000 M by head load. Please Enable Macros to View BoQ information |