Name of Work:- Prvent entry of rain water to the Computer room 3rd Floor, PMB Block SDC
Sl. No.
Item Description
1
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
2
Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 10 mm and down gauge), including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design : In 75x75 mm deep chase
3
Distempering with 1st quality acrylic distempering of approved manufacturer of required shade, two or more coats i/c removing dry or oil bound distempering water proofing cement paint and the like by scrapping sand papering, P/A white cement based putty over the wall surface and applying primer with water thinable cement primer on wall surface etc. complete in all respect to get a smooth and even finish as directed by the Engineer-in charge
4
Regarding terracing of mud phaska covered with tiles or brick, in cement mortar by dismantling tiles or bricks, removing mud phaska to proper slope, relaying mud plaster gobri leaping and tiles or bricks, grouted in cement mortar 1:3 (1cement : 3 fine sand) including replacing unserviceable tiles or bricks with new ones and disposal of unserviceable materials to the dumping ground (The cost of the new tiles or brick excluded) all complete as per direction of Engineer-in Charge.
5
Furniture shifting labour
6
Making drain along the wall of existing pattern for the fine flow of wall line
7
Providing and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having Sun Reflectivity Index (SRI) of 105 on top of concrete roof in three coats @10.76 litre/ 10 sqm. One coat of self-priming of elastomeric waterproofing liquid (dilution with water in the ratio of 3:1) and two coats of undiluted elastomeric waterproofing liquid (dry film thickness of complete application/system not less than 500 microns). The operation shall be carried out after scrapping and properly cleaning the surface to remove loose particles with wire brushes, complete in all respect as per the direction of Engineerin- Charge. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.