| 1 | Item Description |
| 2 | Remuneration for Local Professional Staff |
| 3 | Sub professional Staff |
| 4 | Support Staff |
| 5 | Transportation |
| 6 | Duty Travel to Site (Fixed Costs) |
| 7 | Office Rent (Fixed Costs) |
| 8 | Office Supplies, Utilities and Communication |
| 9 | Office Furniture and Equipment |
| 10 | Reports and Document Printing |
| 11 | Survey & Investigation |
| 12 | Bridge Inspection Equipment |
| 13 | Contingencies |
| 14 | Sub Total |
| 15 | Goods and services tax payble in india |
| 16 | A. Key Personnel |
| 17 | Team Leader cum Bridge Engineer |
| 18 | Senior Bridge Structural Engineer |
| 19 | Senior Geotechnical Engineer |
| 20 | Bridge Rehabilitation Expert |
| 21 | Highway Engineer |
| 22 | Sub Total |
| 23 | B: Sub Professional Staff |
| 24 | Survey Engineer |
| 25 | Assistant Highway Engineer |
| 26 | CAD Expert |
| 27 | Assistant Bridge Engineer |
| 28 | Quantity Surveyor |
| 29 | Lab Technician |
| 30 | Sub Total |
| 31 | Office Manager |
| 32 | Accountant cum cashier |
| 33 | Steno cum Computer Operator |
| 34 | Office Boy |
| 35 | Innova or equivalent ( not more than 3 years old) (01 no) |
| 36 | Scorpio or equivalent (not more than 3 years old) |
| 37 | Pick up Van |
| 38 | Duty Travel to Site (Fixed Costs) (for all lengths of projects): Professional and support staff |
| 39 | Minimum 150 sqm area of office shall be rented The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. complete. |
| 40 | Office Supplies |
| 41 | Drafting Supplies |
| 42 | Computer Running Costs |
| 43 | Domestic and International Communication |
| 44 | Office Furniture and Equipment(Rental) |
| 45 | The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer, furniture, conference table etc. Office equipment shall include as telephone , photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs, laser printers., Engineering Plan printer (1 no.), binding machine (1 no.) etc. |
| 46 | Inception Report – detailing methodology, data collection plan, and work schedule. |
| 47 | Feasibility cum Inventory Report– Feasibility-cum-Inventory Report, including Maneuverability Assessment of HT3 Vehicular Movement on Approaches and Curves, along with all requisite drawings for New Construction Requirements, and Rectification/Retrofitting Measures with Methodology for Existing Bridges requiring Rectification/Retrofitting Rectification/Retrofitting |
| 48 | Draft Detailed Project Report (DPR) , GAD’s along with the estimate/BOQ |
| 49 | Final Detailed Project Report (DPR) |
| 50 | 1. Visual inspection of bridge superstructure, substructure, foundations, deck, bearings, joints, drainage, waterways, and approach roads for cracks, corrosion, settlement, and structural distress.2. Non-Destructive Testing (NDT) including UPV, Rebound Hammer, GPR, Half-Cell Potential, Impact-Echo, and steel testing for assessment of structural integrity and corrosion.3. Static and Dynamic Load Testing to evaluate bridge performance, deflection, strain, and vibration under loading conditions.4. Material and foundation investigations including concrete core testing, scour assessment, foundation integrity, bearing inspection, and expansion joint evaluation.5. Hydrological and seismic assessment including flood analysis, hydraulic study, and seismic vulnerability evaluation for overall bridge safety and stability. |
| 51 | Bridge inspection using Mobile Bridge Inspection Unit |
| 52 | A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. The provisions of Contingency shall be operated with the specific approval from the Authority Please Enable Macros to View BoQ information |