| 1 | 8 Port gigabit L2 managed |
| 2 | 24 Port gigabit switch with 4 SFP ports (L2) |
| 3 | CAT 6A Cable |
| 4 | CAT 6A UTP surface mount box |
| 5 | RJ 45 connector |
| 6 | 1 mtrs Patch Cord cat 6A |
| 7 | 3 mtrs Patch Cord cat 6A |
| 8 | 24 Port Keystone Patch Panel Cat6A |
| 9 | I/O Cat 6A UTP Single Port, face plate(single) |
| 10 | 6 Amp Modular Electric Switch |
| 11 | 6 Amp Modular Electric Socket |
| 12 | Electrical copper wire:2.5 sq mm wire |
| 13 | PVC casing & capping 1” |
| 14 | PVC casing & capping 2” |
| 15 | 6 U Rack |
| 16 | 6 Core armored cable –SM |
| 17 | 12 Core armored cable –SM |
| 18 | Single-Mode Fiber Converter |
| 19 | 12 Port Rack Mount LIU loaded with Splice Tray and Cable spool |
| 20 | Pigtail SC/LC SM - 2 mtr |
| 21 | Single Mode Fiber Transceiver |
| 22 | 8/24 Port Rack mount LIU |
| 23 | Fiber Patch Cord Sc-Lc Type – SM (3 mts) |
| 24 | Fiber Pig Tails Sc / Lc - SM |
| 25 | CAT6A cable laying: Fixing & laying of cat6A cable in PVC casing from client node to the LAN main 24 port network switch/Rack/Junction box. |
| 26 | Input /output Termination: Install, test and commission of input /output cat 6A UTP single port with surface mount box. The work shall include for all labour crimping and end terminations with proper tools as per the company standards. |
| 27 | Rack fixing with all networking components. The work shall include for all labour cost for rack fixing, end termination of patch panel and 24 port switch using 1 mtrs patch cord. |
| 28 | Fiber Termination: Install, test and commission of Optical fiber termination. The work shall include for all labour of fiber splicing and end terminations with proper tools as per the company standards. (1 core=2 fusion for fiber spicing). It also includes fixing of LIU, transreceiver, Fiber patch cord LC-SC Type, Fibre SM Pig Tails LC, LC Adapters, Fiber to copper converter in rack. |
| 29 | Fibre Cable Laying: Laying & fixing of Outdoor ArmoredFiber Cable without HD & GI Steel pipe.- Aerial. |
| 30 | Fibre Cable Laying: Fixing & Laying of Outdoor Armoredfiber Cable in Gi/steel Piping of 10 m.m. when passing through tar/concrete road. |
| 31 | Fibre Cable Laying: Fixing of Outdoor ArmoredFiber Cable in High density (HD) pipe of 40/33mm when laid under soil. |
| 32 | Excavating & refilling of soil (Hard/Soft) without ROW /Permissions |
| 33 | Excavating & refilling of tar/concrete road without ROW/Permissions |
| 34 | Removal of Old cabling (LAN) work including shifting/ rework, Bidder is required to remove the same & shift at new place or at DITE&C store. (Without transport cost) |
| 35 | Re-installation and commissioning work that includes shifted items (racks, patch chords, patch panels switches, any other items, etc). (Without transport cost) |
| 36 | Electrical Termination: Install, test and commission 3 nos of 6A socket & switch and 1 nos of 6 X 16A universal socket & 6 A switch with module modular polycarbonate surface box and module modular polycarbonate surface box and moulded modular polycarbonate switch plate including the termination of wires. |
| 37 | Electrical Wire laying: fixing &layingof electrical wiring in PVC casing from Rack to UPS output. Please Enable Macros to View BoQ information |