| 1 | Supply Transporting and laying specially selected Bio Media for underdrain 10 mm TO 40 mm aggregate including Geological Bio Media for Soil Bio technology Process and M Sand |
| 2 | FRP walkway Grating built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. |
| 3 | Geotextile Layer |
| 4 | Supply and installation of UPVC schedule -40, pipes and fitting of various size with Tee, Sockets, Elbow, Valve, Reducers, Flanges etc including labour for fitting 50 - 150 mm Dia |
| 5 | Office cum control panel porta cabin 20’X10’X8.6?feet |
| 6 | Supply and laying of special Patented Culture and Catalyst for Soil Bio Technology Process, including transportation from Mumbai and laying |
| 7 | Supervision of Project by technology provider |
| 8 | Preparation and submission of Design and Drawings vetted by any Govt. reputed engineering institute. |
| 9 | Providing and stacking of Cestrum noctumum (Raat ki Rani) of height 60-75 cm. with 4-5 branches in bag of size 25 cm as per direction of the officer-in-charge |
| 10 | Providing and stacking of Ficus panda of height 45-60 cm. with 6-7 branches and healthy foliage in p.bag of size 25 cm as per direction of the officer-in-charge. |
| 11 | Providing and stacking of Cassia laevigata of height 45-60 cm. in Polybag of size 20 cm as each 45 per direction of the officer-in-charge. |
| 12 | Providing and stacking of Bauhinia acuminata of height 60-75 cm. in Polybag of size 20 cm as per direction of the officer-in-charge. |
| 13 | Chemical Earthing |
| 14 | S.S. Bar Screen - Specially designedSS Screen (Stainless Steel Screen) used in sewer pipelines designed to remove solid waste, debris, and other large particles from the wastewater. High-grade 304/316 stainless steel, offering excellent corrosion resistance against sewage water and environmental factors complete with Frame. |
| 15 | Lamella Plate Clarifier Plates and Fittings : A lamella clarifier is a compact and efficient sedimentation device designed to separate suspended solids from wastewater. It is ideal for use in 3 MLD Sewage Treatment Plants (STPs) for primary or secondary treatment stages.- Key Advantages:No moving parts, thereby minimizing maintenanceContinuous operation possible for any length of time without shutdownEach plate is constructed of FRP corrosion resistant materialLifting arrangements are not required for plate installation or inspection individual Lamella plates can be easily removed and installed during installation or maintenance by a single operator without the need to shut down the system. Internal flow feed ducts ensure even distribution of water to each and every plate controlling velocity and thereby minimizing turbulence. Adjustable weir plates ensure even collection of the treated water without short circuiting The flash mix cum flocculation tank is a one piece configuration for bolt up to the lamella tank in the field. |
| 16 | Charges for Supply of design, drawings including transfer of process of Soil Biotechnology by Developer for execution of 3 MLD SBT STP |
| 17 | 3-Phase Main Electric Control Panel `1. General Overview:The 3-Phase Main Electric Control Panel is designed to manage and distribute electrical power effectively. It ensures safe and efficient operation of equipment, providing protection and control for a 3-phase power system.` `2. Technical Specifications:Operating Voltage: 415V AC, 50 Hz, 3-phase. Rated Current: Configurable, typically 63A to 630A (customizable based on load requirements).Ingress Protection (IP): IP54/IP65, suitable for indoor or outdoor installation. Enclosure Material: Mild Steel (MS): Powder-coated for durability and corrosion resistance.Busbar Material: Electrolytic grade copper or aluminium with heat-shrink sleeves.Current rating: 1.5 times the panel`s rated capacity. Circuit Breakers:Incoming: MCCB (Moulded Case Circuit Breaker) with overload and short-circuit protection.Outgoing: MCBs or MCCBs, as per load specifications.``Power Distribution: Phases: L1, L2, L3 with neutral and earth terminals.Color-coded wiring for easy identification.Metering and Monitoring:Digital multi-function meter (voltage, current, power factor, frequency, energy).Phase failure relay for protection against phase loss or imbalance.Control Features:Pushbuttons for ON/OFF control. Indicator lamps (R-Y-B for phase status, fault indication).Emergency stop button.Cabling:Copper cables for internal connections.Terminal blocks for external connections. Cooling:Natural air cooling or forced cooling (ventilation fans) for high-load panels.``3. Standards and Compliance:IS/IEC Standards: Compliant with IS 8623, IEC 61439, and other relevant standards.Earthing: Provided as per IS 3043.``4. Design Features:Modular design for easy maintenance and future expansion.Door interlocking with padlocking facility for safety.Cable entry from the bottom/top (as required).Powder-coated finish (minimum 70 microns) for corrosion resistance.`Site Survey and Contouring including Preparation of Site Drawings (To be undertaken by MCM)BOREHOLE TEST for SOIL TEST REPORT 10 Meter (To be undertaken by MCM) |
| 18 | 1.Online water Quantity monitoring Analyzer model EZ L- 700 probe type immersion insitu installation 2. DATA Transfer configuration to server reporting software on CPCB Server and centralized server for SPCB connectivity for 1 year 3. Supervision of installation for OCEMs and Commissioning |
| 19 | Laying Supply and jointing three core submersible flat cables of approved make with bare bunched copper conductor insulated and sheathed with PVC for submersible pump motors/fountain lights etc with voltage grade 1100 volts marked with IS:694, 1990 including cost of jointing, materials as well as carriage, loading, unloading etc. complete in all respect Copper Cable 3 Core 2,5 sqmm.including IP 65 Cable joint Junction Boxes 6-8 NOs, Cable tray, Underground laying etc |
| 20 | Sound Proof Diesel Generating Set comprising of 125 KVA Gen set with AMF Pannel canopy and standered accessories like water cooling system as per CPCV Norms (Make Kirloskar engine and AMF pannel ) |
| 21 | Operation and Maintenance of plant for 1 years |
| 22 | CONSTRUCTION OF 3 MLD STP BASED ON SOIL BIO TECHNOLOGY IN KASAN, WARD NO-9, UNDER JURISDICTION OF MC, MANESAR Please Enable Macros to View BoQ information |