| 1 | 300 mm deep supply and erection of street light luminaireminimum IP-65/66 level protected single piece diaa cast almunium/ almunium sheet housing with pot optic reflector, heat resistant glass cover or HPSV lamp complete with copper wound blast capacitor complete.Sodium 250 W street light luminator |
| 2 | Wiring and CablingComplete wiring and cabling as per detailed specificationsi.) From control panel to starter 2x3 core x 185 sqm runs of armoured.ii.) Starters to motors 1 x 3 core x 185 sqm to armoured. |
| 3 | Providing and Installation of Horizontal submersible pumping set complete in all respect.4000 LPM 50 Mt. Head 75 BHP |
| 4 | Extra Provision for HD Camera High quality image with 12 MP, 1/27” CMOS sensor 12 MP (2880*1620) @25 fps: 4 MP (2560*1440) @25fps: 3 MP (2304*1296) @25fps: 2 MP (1920*1080) @30fps: Ultra 265, H.265, H.264 MJPEG Light Hunter technology ensures ultra-high image quality in low illumination environment 120 dB true WDR technology enable clear image in strong light Support 9:16 Corridor Mode Built -in Mic Smart IR, up to 40m (131ft) IR distance Support 256 G Micro SD Card P67 |
| 5 | Cost of Supply and erection of CFL/Tube light including PVC conduct wiring, modular sheet etc. complete in all respect... |
| 6 | Construction of HT/TL Panel Room, PLC Centrifuge house, blower room and Lab Cum Office building including doors. Window and fitting with toilet block including sanitary fittings etc. as per drawing Attached in DNIT at MPS and STO site covered area with RCC framed structure of brick work vitrified glaze tiles flooring, powder coated aluminum framed of size 100mm x 45mm gauge for chowkhat frame, 75mmx 45mm of 10gauge for door frame 45mm x 45mm of 10 gauge window frame, 5mm thick glass AIS/Saint Gobin /Modi float Covered area 250 sqm |
| 7 | MAIN PUMPING STATIONS:-Design, construction, erection, testing and commissioning of MPS and following components i) Panel room of 30 sqm. covered area and PLC room including toilet block of 20 Sqmtr. covered area with RCC framed structure of brick work vitrified glazed tiles flooring, Powder coated aluminum frame of size 100mm x 45mm of 10 gauge for chowkhat, 75mm x 45mm of 10 gauge for door frame, 45mm x 45mm of 10 gauge for window frame, 5mm thick glass AIS/Saint Gobin / Modi Float, The toilet block shall be with one half staff urinal and One European W/C, one wash hand basin as per approved drawings. ii) RCC Inlet chamber, Screen Chamber, rectangular collecting tank suitable for 2.50 MLD average flow with peak factor of 3.00, land scaping of the campus complete in all respect. Providing and installing 1 No motor of 3DWF,2 Nos of 1DWF and 2 Nos 0.50 DWF with 15 Mtr Head each with suitable LT Panel equipped with all safety devices, automative capacitor bank and submersible cable from LT panel to pump set complete in all respect. iii) K9 DI pipe of suitable Dia at MPS Including welding and screwing of flanges, ISI marked D.I. fittings, Sluice valve, non return valves as per requirements even for bye-pass arrangements complete in all respect. iv)3 nos. CI Gear Operated Sluice Gate with SS Spindle (SS 410) and seats (SS 304) (2 nos. for screen and 1 no. for partition of collecting tank) as per design. v)Supply and installation of 2 nos. mechanical course screens of minimum length 6 mtrs. for 3.00 MLD average flow with peak factor of 3.0. 1. The connecting sewer of same diameter and material of construction, laid at adequate depth between existing sewers to newly constructed structures is included in scope of work. 2. All the infrastructure except construction of Staff quarter ,Boundary wall (except Main Gate) and path ways/ roads required to be executed at site to make the MPS functional is included in the scope of work for lump-sump job. 3. All the pumping machinery, panel board, Level sensor etc. shall be controlled by PLC and SCADA and shall be synchronized with PLC panels at MPS and STP site through broadband internet facility. 4. The size and quantities of all the above components will be as per approved structural /Hydraulic /Mechanical /Electric design to be approved by Department before actual execution of work |
| 8 | SEWAGE TREATMENT PLANT :-Design, construction, erection, testing and commissioning of 2.50 MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect including Landscaping MCC Panel room and all other contingent Electrical, Mechanical, Electromagnetic Flow Measurement Device, Real Time Water Quality Monitoring with Data Collection System(Online analyzer), Piping and Instrumentation works with PLC and SCADA Arrangement for STP and MPS along with Synchronizing it with each other including furniture and laboratory equipment`s as per detail given in the bid document and including following components. i) 2 No. High Mast of 9 mtr GI Octagonal pole of 4 mm thickness (T=100 mm, B=200mm, Base Plate = 320 x 320 x 20 mm), Window at 500 mm from Base Plate with 6 No. LED energy outdoor suitable size reputed make efficient lamps on each pole, including 20 no. LED outdoor lights with GI poles 7 mtr high including all accessories along the road and path complete in all respect. ii) Supply and installation of 1 No. Main Gate of (SS) 12 ft. wide main gate and 4 ft. wide wicket gate (total weight not less than 500 kg) at STP site. as per satisfaction of Engineer-in charge. iii) Providing and installing 2 No. centrifuges (1Working plus 1 Stand bye) including centrifuge feed pump, all fittings, instrumentations, electric panel board etc. as per design complete in all respect of the NIT, including packing dry sludge in 20Kg Bag and supplying the same Market Kisan Sewa Kendra or as directed by Engineer-in-charge within lead as pointed at clause 4.4.5 of NIT . iv) Providing and installation of 2 nos. pumping sets of suitable size (1 working and 1 standby) with head 15 mtrs. in chlorination tank to disposed off the treated effluent including all fittings, instrumentations, electric panel board etc. as per design complete in all respect . v) Supply, Installation, Testing, Commissioning, of effluent quality monitoring system at 2.50 MLD STP at Village for Online (Continuous) measuring of PH, total Suspended Solids (TSS) Chemical Oxygen Demand (COD), Biological Oxygen Demand (BOD) by single analyzer with various sensors (spectral measurement in the UV VIS range 200-720mm) performing reagent and chemical free analysis with automatic cleaning of censor, signal cables and power cable, local data acquisition and display the data of continuous basis for up linking the data of CPCB, HSPCB and PHED, TUV Board approved complete in all respect as per Central Pollution Control Board (CPCB) guidelines for online continuous monitoring system for effluents and as contained in scope of work in the notice inviting tender Multi-parameter measuring converter, for connecting up to 18 intelligent seniors Scope including 8 analog inputs/Outputs(4 Inputs and 4 outputs) (o/4- 20Ma), wide range power supply optical COD/BOD and TSS probe with spectral processing of the UV-VIS range for measurement plant of 2.50 MLD STP at with integrated with automatic cleaning. Robust digital pH/ORP sensor for pH/ORP electrodes, with built-in pre-amplifier and temperature sensor with Automatic Temperature Compensation (ATC) Cable length 100 Meter (minimum).Sensor adapter cable for all intelligent sensors, with IP68 water proof connection to intelligent sensors net system cable length 100 Meter (Minimum) Data Transfer to CPCB, HSPCB and PHED Servers . Providing GSM 3G, 4G Modem with mobile network connectivity. |
| 9 | Providing and Fixing of Fire Fighting System including 5 Nos. sand buckets with installation arrangement of wall, 5 Nos. ABC type Fire Extinguisher of capacity 5kg Each of reputed make complete in all respect. |
| 10 | Supplying, erection, testing and commissioning of Submersible motor pumping sets as per BIS SPECIFICATION No. 8034 - 1989 ( as amended up to date for pumps ) and IS 9283 - 1979 ( as amended up to date for motor ) the pump motor sets should be capable of pumping clear fresh cold water having character istics as specified in Clause - 4 of IS 8034 - 1989 and clause 4.1 of IS 9283 - 1979 ( 300LPM 50.00 Mtr. Head 7.50 BHP )... |
| 11 | Providing and Fixing in position UPVC SWR Bend 110 mm x110 mm as per S.I manufacture and reputed firm complete in all respect. |
| 12 | Operation and Maintenance (O and M)-cum-Defect Liability Period (DLP) for a period of 06 years after successful completion of trial run, covering all assets under the DNIT including Existing water supply infrastructures of the village Badoli i.e tubewells, UGTs, pumping machinery, water supply network, IPS, MPS, STP, all water works, lawns and horticultureareas, all civil structures, mechanical systems, electrical installations, instrumentation, PLC and SCADA systems, transformer, DG sets, control panels and all allied works: the scope includes deployment of skilledmanpower, operation of pumps and treatment units, routine and preventive maintenance as per relevant standards, chlorination of water supply system as well as chlorination/disinfection of treated effluent, operation of STP with required chemical dosing and treatment processes, maintaining prescribed water quality and effluent discharge standards, upkeep of lawns and horticulture provision of all consumables and chemicals, ensuring uninterrupted services, and rectification or replacement of any defects during the O and M/DLP period, with all systems to be maintained in sound and efficient working condition throughout. Note: 1. The contractor shall quote rates for O and M for the entireproject, inclusive of all components and activities specified above. 2. The O and M will be charged to Annual maintenance |
| 13 | HSR Items Please Enable Macros to View BoQ information |