| 1 | 300 mm deep supply and erection of street light luminaireminimum IP-65/66 level protected single piece diaa cast almunium/ almunium sheet housing with pot optic reflector, heat resistant glass cover or HPSV lamp complete with copper wound blast capacitor complete.Sodium 250 W street light luminator |
| 2 | Providing and Installation of Horizontal Submersible Pumping set Complete in all respect.Line -I for Zone -I3000 LPM 50 Mt. Head 60 BHP |
| 3 | Providing and Installation of Horizontal Submersible Pumping set Complete in all respect. 2500 LPM 50 Mt. Head 50 BHP |
| 4 | Supply and erection of L.T Panel board, having independent incoming and outgoing feeder, fabrication from 14 SWG, CRCA sheet at MBS 60 BHP |
| 5 | Wiring and CablingComplete wiring and cabling as per detailed specificationsi.) From control panel to starter 2x3 core x 185 sqm runs of armoured.ii.) Starters to motors 1 x 3 core x 185 sqm to armoured. |
| 6 | Double loop earthing for all electrical equipment from the existing grid as per electricity rules with 4 Nos. earth pipe complete (1 existing) |
| 7 | Providing laying jointing and testing M.S. D/F pipes made of M.S. sheet confirming to IS:2262 welded as per IS: 816 pipes IS standard, Valves and specials required for suction and delivery pipes including testing etc. complete in all respect. |
| 8 | Credit of existing pumping machinery of Boosting station 800 LPM x 40 Mtr. Head x 12.50 BHP |
| 9 | Providing and fixing of clamp and MS stage including bolts and nuts for 100 mm pipe. |
| 10 | GI special/GI Elbow providing and fixing GI Elbow complete in all respect. |
| 11 | GI special/GI Nippal providing and fixing GI Nippal complete in all respect. |
| 12 | Providing and fixing GI Socket complete in all respect. |
| 13 | Extra Provision for HD Camera High quality image with 12 MP, 1/27” CMOS sensor 12 MP (2880*1620) @25 fps: 4 MP (2560*1440) @25fps: 3 MP (2304*1296) @25fps: 2 MP (1920*1080) @30fps: Ultra 265, H.265, H.264 MJPEG Light Hunter technology ensures ultra-high image quality in low illumination environment 120 dB true WDR technology enable clear image in strong light Support 9:16 Corridor Mode Built -in Mic Smart IR, up to 40m (131ft) IR distance Support 256 G Micro SD Card P67 |
| 14 | Construction of HT/LT Panel Room, PLC room ,Centrifue house, blower room and Lab cum office building including doors, windows and fitting etc. at MPS and STP site covered area with RCC framed structure of brick work vitrified glazed tiles flooring , powder coated aluminium frame of size 100mm x 45mm of 10 guage for chowkhat, 75mm x 45mm of 10 guage for door frame, 45mm x 45mm of 10 guage window frame with 5mm thick glass AIS/Saint Gobin/Modi Float. Covered area ( 250 Sqm ) |
| 15 | MAIN PUMPING STATIONS:-Design, construction, erection, testing and commissioning of MPSand following components including i) Panel room of 30 sqm. covered area and PLC room including toilet block of 20Sqmtr. covered area with RCC framed structure of brick work vitrified glazed tiles flooring, Powdercoated aluminium frame of size 100mm x 45mm of 10 gauge for chowkhat, 75mm x 45mm of 10 gaugefor door frame, 45mm x 45mm of 10 gauge for window frame, 5mm thick glass AIS/Saint Gobin / ModiFloat, The toilet block shall be with one half staff urinal and One European W/C, one wash hand basin asper approved drawings. ii) RCC Inlet chamber, Screen Chamber, rectangular collecting tank suitable for2.50 MLD average flow with peak factor of 3.00, land scaping of the campus complete in all respect.Providing and installing 1 No motor of 3DWF,2 Nos of 1DWF and 2 Nos 0.50 DWF with 15 Mtr Head eachwith suitable LT Panel equipped with all safety devices, automative capacitor bank and submersiblecable from LT panel to pump set complete in all respect. iii) K9 DI pipe of suitable Dia at MPS Includingwelding and screwing of flanges, ISI marked D.I. fittings, Sluice valve, non return valves as perrequirements even for bye-pass arrangements complete in all respect. iv)3 nos. CI Gear Operated SluiceGate with SS Spindle (SS 410) and seats (SS 304) (2 nos. for screen and 1 no. for partition of collectingtank) as per design. v)Supply and installation of 2 nos. mechanical course screens of minimum length 6mtrs. for 2.50 MLD average flow with peak factor of 3.0.. 1. The connecting sewer of same diameter andmaterial of construction, laid at adequate depth between existing sewers to newly constructedstructures is included in scope of work. 2. All the infrastructure except construction of Staff quarter,Boundary wall (except Main Gate) and path ways/ roads required to be executed at site to make theMPS functional is included in the scope of work for lump-sump job. 3. All the pumping machinery, panelboard, Level sensor etc. shall be controlled by PLC and SCADA and shall be synchronized with PLC panelsat MPS and STP site through broadband internet facility. 4. The size and quantities of all the abovecomponents will be as per approved structural /Hydraulic /Mechanical /Electric design to be approvedby Department before actual execution of work . |
| 16 | SEWAGE TREATMENT PLANT :-Design, construction, erection, testing and commissioning of 2.50 MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect including Landscaping MCC Panel room and all other contingent Electrical, Mechanical, Electromagnetic Flow Measurement Device, Real Time Water Quality Monitoring with Data Collection System(Online analyzer), Piping and Instrumentation works with PLC and SCADA Arrangement for STP and MPS along with Synchronizing it with each other including furniture and laboratory equipments as per detail given in the bid document and including . i) 2 No. High Mast of 9 mtr GI Octagonal pole of 4 mm thickness (T=100 mm, B=200mm, Base Plate = 320 x 320 x 20 mm), Window at 500 mm from Base Plate with 6 No. LED energy outdoor suitable size reputed make efficient lamps on each pole, including 20 no. LED outdoor lights with GI poles 7 mtr high including all accessories along the road and path complete in all respect. ii) Supply and installation of 1 No. Main Gate of (SS) 12 ft. wide main gate and 4 ft. wide wicket gate (total weight not less than 500 kg) at STP site. as per satisfaction of Engineer-in-charge. iii) Providing and installing 2 No. centrifuges (1Working plus 1 Stand bye) including centrifuge feed pump, all fittings, instrumentations, electric panel board etc. as per design complete in all respect of the NIT, including packing dry sludge in 20Kg Bag and supplying the same Market KisanSewa Kendra or as directed by Engineer-in-charge within lead as pointed at clause 4.4.5 of NIT including . iv) Providing and installation of 2 nos. pumping sets of suitable size (1 working and 1 standby) with head 15 mtrs. in chlorination tank to disposed off the treated effluent including all fittings, instrumentations, electric panel board etc. as per design complete in all respect including . v) Supply, Installation, Testing, Commissioning, operation and Comprehensive Annual Maintenance of effluent quality monitoring system at 2.50 MLD STP at Village for Online (Continuous) measuring of PH, total Suspended Solids (TSS) Chemical Oxygen Demand (COD), Biological Oxygen Demand (BOD) by single analyzer with various sensors (spectral measurement in the UV-VIS range 200-720mm) performing reagent and chemical free analysis with automatic cleaning of censor, signal cables and power cable, local data acquisition and display the data of continuous basis for up linking the data of CPCB, HSPCB and PHED, TUV Board approved complete in all respect as per Central Pollution Control Board (CPCB) guidelines for online continuous monitoring system for effluents and as contained in scope of work in the notice inviting tender:Multi-parameter measuring converter, for connecting up to 18 intelligent seniors Scope including 8 analog inputs/Outputs(4 Inputs and 4 outputs) (o/4- 20Ma), wide range power supply optical COD/BOD and TSS probe with spectral processing of the UV-VIS range for measurement plant of 2.50 MLD STP at with integrated with automatic cleaning. Robust digital pH/ORP sensor for pH/ORP electrodes, with built-in pre-amplifier and temperature sensor with Automatic Temperature Compensation (ATC) Cable length 100 Meter (minimum).Sensor adapter cable for all intelligent sensors, with IP68 water proof connection to intelligent sensors net system cable length 100 Meter (Minimum) Data Transfer to CPCB, HSPCB and PHED Servers ). Providing GSM 3G, 4G Modem with mobilenetwork connectivity including network charges. |
| 17 | Providing and Fixing in position UPVC SWR Bend 110 mm x110 mm as per S.I manufacture and reputed firm complete in all respect. |
| 18 | Operation and Maintenance (O and M)-cum-Defect Liability Period (DLP) for a period of 06 years after successful completion of trial run, covering all assets under the DNIT including Existing water supply infrastructures of the village Chandhut i.e tubewells, UGTs, pumping machinery, water supply network, IPS, MPS, STP, all water works, lawns and horticulture areas, all civil structures, mechanical systems, electrical installations, instrumentation, PLC and SCADA systems, transformer, DG sets, control panels and all allied works: the scope includes deployment of skilled manpower, operation of pumps and treatment units, routine and preventive maintenance as per relevant standards, chlorination of water supply system as well as chlorination/disinfection of treated effluent, operation of STP with required chemical dosing and treatment processes, maintaining prescribed water quality and effluent discharge standards, upkeep of lawns and horticulture provision of all consumables and chemicals, ensuring uninterrupted services, and rectification or replacement of any defects during the O and M/DLP period, with all systems to be maintained in sound and efficient working condition throughout. Note: 1. The contractor shall quote rates for O and M for the entire project, inclusive of all components and activities specified above. 2. The O and M will be charged to Annual maintenance |
| 19 | HSR Items Please Enable Macros to View BoQ information |