Tender For Part A- Sewer- Providing Sewerage Scheme In Newly Approved Colonies In Farrukh Nagar Townpart B- W/S- Laying Of Distribution Pipe Line, Household Tap Connection And Provision For Metering For Newly Approved Colonies At Farrukh Nagar Town O
Tender Overview
Project Description
Tender for Part A- Sewer- Providing Sewerage Scheme In Newly Approved Colonies In Farrukh Nagar Townpart B- W/S- Laying Of Distribution Pipe Line, Household Tap Connection And Provision For Metering For Newly Approved Colonies At Farrukh Nagar Town Of maintenance Of All Scope Of Work As Per Dnit During 3 Year Defect Liability Cum maintenance Period After Sucessful Trial Run 3 Months And All Other Works Contingent There To As Per Specifications Mentioned In The Dnit
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 10-Jul-2026 | Time Extended | Date | 15-Jul-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Making ‘T’ connection from existing charged pipe lineto Boosting station bailing out water, cutting, jointing,testing complete job |
| 2 | Providing and fixing of domestic type water meter of 15 mm Class-B Multizet IS 779-1994 Copper ( ANDapproved by FCRI) Make- Kranti, Dashmish, Balton |
| 3 | FHTC: Making functional househlod tap connectionsincluding dismentling and restoration of existingCC/IPB Road / street, digging suitable size pit, trenchfor connecting line. Supply, erection andcommossioning of 10 mm i/d brass / Gun metal ferrule,3.00 m long IS marked 15 mm i/d G.i pipe class Bincluding all fittings as per specifications and entiresatisfaction of Engineer-in-charge complete in allrespect |
| 4 | Providing and fixing in position UPVC SWR Bend (110 mm x 110 mm) as per SI Manufacture of reputed firm complete in all respect. |
| 5 | Providing and fixing in position UPVC SWR Reducer(110 mm x 90 mm) as per SI Manufacture of reputedfirm complete in al respect. |
| 6 | Providing and fixing in position UPVC SWR Door Foot Bend (110 mm x 110 mm) as per S 13592 of E.D.C Manufacture of any other reputed firm complete in all respect. |
| 7 | Provision for Restoration of water connectionsdamaged due to laying of Sewerage network completein all respects. (Details attched) |
| 8 | Provision for connection of proposed sewer to existingsewer by dismantling of existing manhole wall or slabincluding reconstruction of it complete in all respect. |
| 9 | All HSR Items Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 2 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender