|
| 1 | Material and labour for repairs to pot holes any depth not exceeding 1.00 Sqm each including sweeping free from dust and mud or water, scouring sunken surfacesin roads, path etc cutting edges at least 25 mm depth and making good by applying tack coat with bitumen @ 5 kg/X Sqm, putting in premix bituminous macadam using paving bitumen of grade VG-30 well rammed and sealed with binder @ 9.80 kg mixed with 0.09 cum of stone chippings 6.3 mm size per 10 Sqm and again well rammed including supply of premixed macadam, binder and chipings, depth of pot holes exe 30mm thick, complete all as specified and as directed by Engineer-in-charge. |
| 2 | Material and labour for providing and laying Premix Bituminous macadam of consolidated thickness 75 mm or less,using paving bitumen binder of grade VG-30 @ and binder content of 4% by weight of total mix with mixing of aggregates and VG-30 bitumen in electronic operated 100-120 TPH batch type hot mix plant, transporting the hot mix from HMP to work site by tippers and laying with hydrostatic paver finisher (Paver shall not be compulsory in case of patch work using B.M.) and as per approved mix and rolled & compacted to required camber and gradient with 8 to 12 tonne smooth wheeled, vibratory and tandem roller, complete all as per Clause 504 MoRTH (5th Rev) specification and as specified and as directed by Engineer-in-charge. NOTES :(i). The contractor shall quote the rate against Item considering 4% VG-30 bitumen content. Job Mix Formula as per CI. No. 505.3.3 of MORTH (5th Rev) for BM shall be worked out from Thapar Insti. of Engg & Tech Patiala/NIT Kurukhshetra /PEC Chandigarh/CTL for obtaining optimum binder content (OBC) by the Contractor without any financial effect to the Dept and same be submitted to the accepting officer for approval bfore commencement of work. Any variation in binder content on minus side shall be adjusted @ 50/kg of binder and no adjustment shall be made on plus side.(ii) The BM shall be covered with top layer/wearing course within in a maximum of 48 hours. If their is to be any delay, by the contractor the course shall be covered by seal coat to the requirement of Clause 512 of MORTH (5th Rev) before opening to the traffic. The seal coat in such cases shall be considered incidental to the work and shall not be paid for separately. |
| 3 | Material and labour for preparing existing black top surface by brushing with wire brushed for removing caked mud etc sweeping with brooms and finally fanning to cleaned surface with gunny bags to remove all loose dirt etc from black top surface and applying evenly a premix /tack coat with bitumen grade VG-10 @ 5.0 Kg per ten Sqm complete all as specified and as directed by Engineer-in-charge. |
| 4 | Material and labour for providing and laying Premix Bituminous asphaltic dense concrete 30mm consolidated thickness with 5.5% binder ( using paving bitumen of grade VG-30) content by weight of total mix and crushed aggregates of grading 2, mixing of agrgregates with VG-30 bitumen in electronic operated 100-120 TPH batch type hot mix plant, transporting the hot mix from HMP to work site by tippers and laying with hyrdostatic paver finisher and as per approved mix and rolled & compacted to required camber and gradient with 8 to 12 tonne smooth wheeled, vibratory and tandem roller, complete all as per Clause 507 MORTH (5th Rev) specification and as specified and as directed by Engineer-in-charge. |
| 5 | NOTES : (i). The contractor shall quotes the rate against Item considering 5.5% VG-30 bitumen content. Job Mix Formula as per CIause. No. 505.3.3 of MORTH (5th Rev) for BC shall be worked out from Thapar Insti. of Engg & Tech. Patiala/ NIT Kurukshetra/ PEC Changigarh/ CTL for obtaining Optimum Binder Content (OBC) by the Contractor without any financial effect to the Dept and same be submitted to the accepting officer for approval. Any variation in binder content on minus side shall be adjusted @ Rs 50/kg of binder and no adjustment shall be made on plus side.(ii). Cost of filler i.e. cement (Ordinary portland cement/OPC) is deemed to be included in quoted unit rate.(iii). After spreading of mix as per clause 507.4.7 entire surface during the operation shall be rolled with road roller 8-10 tonne (smooth wheeled) followed with vibratory road roller of 8-10 tonne static weight, followed by finished rolling with 6 to 8 tonne smooth wheel tendom roller as per Clause Nos. 507.4.8 and cost of the same is deemed to be included in quoted unit rate. (iv). The vintage of the T&P (Hot mix plant/road roller i.e. vidrating roller,static roller,hydraulic roller/paver) to be incorporated in the wk should not be more than 10 years except the tippers and shall be approved by GE before date of commencement of the work.(v). The certificate wrt the capactiy of the hot mix plant (HMP) shall be 100-120 TPH and the plant shall be electronic operated, batch type and location be intimlated and the same shall be approved by GE before date of commencement of the work. |
| 6 | (vi). The distance of the HMP shall not be more than 100 KM from the Mil Stn Patiala. Detail of plant to be submitted to GE for approval before date of commencement of the work.(vii). The calibration certificate for HMP shall be submittaed by the contractor for approval of GE before date of commencement of the work which should not be more than 06 months old.(viii). The minimum 2 Road roller each (vibrating and static road roller) are required at site before commencement of the work on the groung and the same shall be approved by GE before date of commencement of the work. |
| 7 | Material and labour for 2.50mm thick road marking thermo plastic reflective paint to be carried out mechanically with hot application of material (painting material @ 5 Kg /Sqm ) and glass beads @ 250 gm/Sqm confirming to CI No. 803.4 of MoRTH in strips of 100/150 mm width on road surfaces complete all as specified and as directed by Engineer-in-charge.Make : Reliance /Asian /Shalimar |
| 8 | Dismantling of bricks laid flat or on edge, laid dry as in road berms etc. including removing bricks and debris from site and complete all as specified and as directed by Engineer-in-charge. |
| 9 | Demolition of cement concrete (un-reinforced) in ground floor and paving not exceeding 150 mm thickness ( below or above ground level) compete all as specified and as directed by Engineer-in-charge. |
| 10 | Material and labour for 75mm thick cement concrete,1:4:8 , type D-2 using 40mm graded aggregate as in sub-floor,sub base, floors, hardstanding etc complete all as specified and as directed by Engineer-in-charge. |
| 11 | Material and labour for providing and laying 60 mm thick factory made chamfered edge cement concrete paver block of M-35 grade with approved colour,design &pattern as in footpath, parks,lawns, driveway or light taffic parking etc of required strength,thickness & size/shape made by vibratory method using PU mould, laid in required colour & pattern over and including 50 mm thick compacted bed of fine sand, compacting and proper embedding/laying of interlocking paver blocks into sand bedding layer through vibratory compaction by using plate vibrator, filling joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand complete all as specified and as directed by Engineer-in-charge. |
| 12 | Material and labour for providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed in cement mortar 1:3 including making joints with or without grooves (thickness of joint except at sharp curves shall not be more than 5mm) including making drainage opening where ever required complete all specified and as directed by Engineer-in-charge. |
| 13 | Supply and fixing solar cat eye aluminium alloy shall (100% water proofing design according to 65) of size 125mm x125mm x25 mm (shank 65 mm) of high efficency mono rystafie solar panel 2.4 V/0.3 watt one Nl-ed rechargeable battery (1.2 V/1600 MA) consisting of super bright LED with 10,0000 to 18,000 mcd as per manufacturers instructions complete all as specified and as directed by Engineer-in-charge Please Enable Macros to View BoQ information |