| 1 | Demolition of brick work or stone/boulder masonry built in cement mortar including all quoins, arches, pillars etc complete all as specified and directed. |
| 2 | M & L brick work with fly ash bricks, Straight or curved onplan exc 6m mean radius,built in 1:6 in cement mortar all as Specified and Directed |
| 3 | M & L for brick work with sub class \\"B\\" brick (old size) straight or curved on plan to any radius in half brick thick walls built in CM 1:4 to any radius complete all as specified and directed. |
| 4 | Taking down cement plaster any description on brick or stone walls etc including raking out joints, hacking for key, scrubbing down with water complete all as specified and directed. |
| 5 | M&L for rendering 15mm thick in CM 1:4 on fair faces of brick work or concrete surface of wall and to be finished even and smooth with out using extra cement complete all as specified and directed |
| 6 | M&L for rendering 15mm thick in CM 1:6 on other than fair faces of brick work or concrete surface of wall and to be finished even and smooth with out using extra cement complete all as specified and directed |
| 7 | Supply only integral water proofing compound all as specified and directed. |
| 8 | M&L for Preparation of Newly Plastered surfaces of Wall and applying Two coats of Oil Bound Distemper over a coat of primer all as specified and directed. |
| 9 | M&L for preparation of newly plastered surfaces of wall applying two coat of white wash over a coat of primer all as specified and directed. |
| 10 | M&L for preparation of old distempered surfaces of walls and applying one coat of oil bound distemper on walls all as specified and directed. |
| 11 | M&L for Preparation of old surfaces of Wall and applying One coat of Cement Base Paint on walls all as specified and directed by Engineer-in-Charge. |
| 12 | M&L for Complete Removal of existing treatment including preparation of old treated surface and applying Two coat of oil bound distemper over 3 mm thick wall care putty including preparation all as specified and directed. |
| 13 | M&L for preparation of existing sunken floor treatment incl plaster and removal of all debris with the following specification and sequence complete all directed by Engr-In-Chrg (a) Cleaning internal surface areas of sunken thoroughly to remove all dirt & loose materials by various mechanical/manual means.(b) Providing and making fillets at the junction of the walls and the slabs using CM 1:4. (c) Laying protection plaster 15mm th. in CM 1:4 on floor and wall with integral water proofing compound (d) Applying two coats of Epoxy resin polymer modified cementitious coating like brushbond of FOSROC/ Dr. Fixit Fastflex/ Bostic Powermix both on floor and wall of sunken. |
| 14 | Demolition of cement concrete unreinforced in ground floor and paving n exc 15cm thick (below or above ground level) complete all as specified and directed. |
| 15 | M&L for PCC 1:5:10 type E-2 using 40mm graded stone aggregate as in filling of sunken floor etc and mass concrete complete all as specified and directed. Please Enable Macros to View BoQ information |
| 16 | M&L for PCC 1:5:10 type E-2 using 40mm graded stone aggregate as in filling of sunken floor etc and mass concrete complete all as specified and directed. Please Enable Macros to View BoQ information |