| 1 | Dismantling of over head lines comprising of copper/ aluminium overhead conductor, G.I. wire, cross arms, insulators etc. as required. |
| 2 | Excavation in trenches by mechanical means (hydraulic excavator) not exceeding 1.5m wide and not exceeding 1.5 m in depth and getting out all kind of soil complete all as specified and as directed by EIC. |
| 3 | M&L for Returning, filling in including spreading, levelling, watering and well ramming in layers not exceeding 25cm in hard/dense soil. complete all as specified and directed. |
| 4 | Removing excavated material/soil to a distance not exceeding 50m and depositing where directed at a level not exceeding 1.50m above the starting point complete all as specified and directed. |
| 5 | Supplying and laying of following size DWC HDPE pipe ISI marked along with all accessories like socket, bend, couplers etc. conforming to IS 14930, Part II complete with fitting and cutting, jointing etc. in the existing trench, complete as required.63 mm dia (OD-63 mm & ID-51 mm nominal) |
| 6 | Supplying and laying of following size DWC HDPE pipe ISI marked along with all accessories like socket, bend, couplers etc. conforming to IS 14930, Part II complete with fitting and cutting, jointing etc. in the existing trench, complete as required.90 mm dia (OD-90 mm & ID-76 mm nominal) |
| 7 | Supply, laying and testing LT XLPE insulated PVC bedded galvanised steel strip or wire armoured earthed electric power cable with aluminium conductor 1100 volts grade, heavy duty in trenches/along pole or wall of size 10 Sq mm 2 core complete all as specified and as directed by EIC. Note:- 1. Excavation and earth work, pipes, clamps, and cable joint shall be measured and paid separately under respective items :- |
| 8 | All as per item No 7 but size 25 sq mm 4 core |
| 9 | All as per item No 7 but size 35 sq mm 3½ core |
| 10 | All as per item No 7 but size 50 sq mm 3½ core |
| 11 | All as per item No 7 but size 70 sq mm 3½ core |
| 12 | All as per item No 7 but size 95 sq mm 3½ core |
| 13 | All as per item No 7 but size 120 sq mm 3½ core |
| 14 | Supplying and installing following size of perforated Hot Dipped Galvanised Iron cable tray (Galvanisation thickness not less than 50 microns) with perforation not more than 17.5%, in convenient standard lengths of 2.5 metres each tray, in convenient sections, joined with connectors, suspended from the ceiling with two numbers GI Suspenders i/c base of suitable size GI angle, GI bolts & nuts, fastner etc as required.150 mm width X 50 mm depth X 1.6 mm thickness |
| 15 | Supplying and installing following size of perforated Hot Dipped Galvanised Iron cable tray \\"bends\\" (galvanisation not less than 50 microns) with perforation not more than 17.5%, in convenient sections, joined with connectors, suspended from the ceiling with two numbers GI Suspenders i/c base of suitable size GI angle, GI bolts & nuts, fastner etc as required.150 mm width X 50 mm depth X 1.6 mm thickness |
| 16 | Supplying and installing following size of perforated Hot Dipped Galvanised Iron cable tray \\"Tee\\" (galvanisation not less than 50 microns)with perforation not more than 17.5%, in convenient sections, joined with connectors, suspended from the ceiling with two numbers GI Suspenders i/c base of suitable size GI angle, GI bolts & nuts, fastner etc as required 150 mm width X 50 mm depth X 1.6 mm thickness |
| 17 | Supplying and installing following size of perforated Hot Dipped Galvanised Iron cable tray \\"Cross member\\" (galvanisation not less than 50 microns) with perforation not more than 17.5%, in convenient sections, joined with connectors, suspended from the ceiling with two numbers GI Suspenders i/c base of suitable size GI angle, GI bolts & nuts,fastner etc as required.150 mm width X 50 mm depth X 1.6 mm thickness |
| 18 | Supply & laying in repair 40mm bore galvanized steel tubing \\"light grade\\" with all fittings in trenches/ under roads/ along pole/ wall for cable protection all as specified & as directed by EIC. . |
| 19 | All as per ser item No 18 above but of size 50 mm bore |
| 20 | All as per ser item No 18 above but of size 100 mm bore |
| 21 | Road cutting for laying UG cable under road /railway crossing, pavement, hardstanding by manually means, protection GI pipe for cable of required dia and making it good to match with the adjoining surfaces/structure for after cable passing complete all as specified and directed by EIC.Note :- GI Pipe and PCC will be measured and paid against respective item. |
| 22 | PCC (1:2:4) type C-1 using 20 mm graded stone aggregate as in coping/plinth block including necessary form work all as specifed and directed by Engineer-in-Charge. |
| 23 | PCC (1:3:6) type C-1 using 20 mm graded stone aggregate as in coping/plinth block including necessary form work all as specifed and directed byEngineer-in-Charge. |
| 24 | Supply and fixing of loop-in/loop-out box of internal size 400 × 300 × 190 mm made out of UV resistant FRP (hot moulded type), conforming to relevant IS standards, having minimum protection of IP65, complete with weatherproof canopy and locking arrangement. The box shall be provided with 5/6 Amp SP MCB – 01 No., 15 Amp rated 3-pole connector – 01 No., neutral link, and DIN rail of suitable size for mounting MCB/connector, all fitted inside the box. The box shall be duly fixed to steel tubular pole using 25 × 3 mm GI/FI clamp, complete with suitable size cable glands and lugs for termination of cables, including taking down the existing box, complete all as specified and as directed by Engineer-in-Charge . Please Enable Macros to View BoQ information |
| 25 | Supply and fixing of loop-in/loop-out box of internal size 400 × 300 × 190 mm made out of UV resistant FRP (hot moulded type), conforming to relevant IS standards, having minimum protection of IP65, complete with weatherproof canopy and locking arrangement. The box shall be provided with 5/6 Amp SP MCB – 01 No., 15 Amp rated 3-pole connector – 01 No., neutral link, and DIN rail of suitable size for mounting MCB/connector, all fitted inside the box. The box shall be duly fixed to steel tubular pole using 25 × 3 mm GI/FI clamp, complete with suitable size cable glands and lugs for termination of cables, including taking down the existing box, complete all as specified and as directed by Engineer-in-Charge . Please Enable Macros to View BoQ information |