| 1 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301.In all type of soil |
| 2 | Carriage of Materials by mechanical transport including loading, unloading and stacking ::Earth |
| 3 | Stone, boulders, gravelly material |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : |
| 5 | 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). |
| 6 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for : |
| 7 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete.Mild steel and Medium Tensile steel bars. |
| 8 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer.Cement Concrete Grade M-15 and above and PCC blocks |
| 9 | Brick work with FPS bricks of class designation 75 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 10 | Sludge clearance of drains, channels and canals with lift 1.5 Mtr and lead up to 50 Mtr. |
| 11 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets etc. upto two stories, excluding the cost of centring, shuttering and finishing :1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar. |
| 12 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar1:4 (1 cement : 4 fine/ coarse sand) Please Enable Macros to View BoQ information |