| 1 | Supply of Line Material as per relevant ISS |
| 2 | 140 mm OD PN-4PE-80 Grade UV Stabilized HDPE Pipe in 6 Mtr |
| 3 | Stone Pad 300x300x75 mm |
| 4 | Nut Bolts off size |
| 5 | LT Clamp |
| 6 | LT Shackle isolator |
| 7 | Nut and Bolts for LT Shackle isolator |
| 8 | I Hook |
| 9 | Dead and Clamp |
| 10 | Suspension Clamp |
| 11 | PG Clamp |
| 12 | Number Plate |
| 13 | GI Pipe 6 inch Dia |
| 14 | F Clamp |
| 15 | PRC Connector |
| 16 | Safe Carriage & Erection Work |
| 17 | Safe carriage of PCC 8.5 m Pole from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 18 | Safe carriage of PCC 9 m Pole from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 19 | Safe carriage of ST Pole 11 m Pole from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 20 | Safe carriage of ST Pole 13 m Pole from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 21 | Safe carriage of 33 KV 3x300 sq. mm Jointing Kit O/D from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 22 | Safe carriage of 33 KV XLPE Cable 3x300 sq. mm from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 23 | Safe carriage of LT AB Cable 3x120+1x95+1x16 sq. mm from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 24 | Safe carriage of LT AB Cable 3x50+1x35+1x16 sq. mm from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 25 | Safe carriage of LT AB Cable 3x95+1x70+1x16 sq. mm from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 26 | Safe carriage of 3 Ph. Distribution Box from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 27 | Safe carriage of 33 KV Cross Arm V Type from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 28 | Safe carriage of 33 KV Pin Insulator from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 29 | Safe carriage of 33 KV Pin with Nut from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 30 | Safe carriage of Earthing Complete from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 31 | Erection of 8.5 mtr long PCC Pole as single support including fixing of HT/LT accessories etc complete, pole should be gruted properly as per DVVNL/Respo norms. |
| 32 | Erection of 9 mtr long PCC Pole as single support including fixing of HT/LT accessories etc complete, pole should be gruted properly as per DVVNL/Respo norms. |
| 33 | Erection of 11 mtr long ST Pole as single support including fixing of HT/LT accessories etc complete, pole should be gruted properly as per DVVNL/Respo norms. |
| 34 | Erection of 13 mtr long ST Pole as single support including fixing of HT/LT accessories etc complete, pole should be gruted properly as per DVVNL/Respo norms. |
| 35 | Dismentalling of LT AB cable (3x50/3x120) sq. mm stacking of proper place. |
| 36 | Laying sagging stringing, binding, jumpering & fixing of all accessories etc. of LT AB Cable 3x50+1x35+1x16 sq. mm |
| 37 | Laying sagging stringing, binding, jumpering & fixing of all accessories etc. of LT AB Cable 3x120+1x95+1x16 sq. mm |
| 38 | Laying sagging stringing, binding, jumpering & fixing of all accessories etc. of 33 KV XLPE Cable 3x300 sq. mm |
| 39 | Laying sagging stringing, binding, jumpering & fixing of all accessories etc. of LT AB Cable 3x95+1x70+1x16 sq mm |
| 40 | Laying and Fixing of Cable Jointing Kit O/D 3x300 |
| 41 | Laying and Fixing of Stone Pad |
| 42 | Laying and Fixing Number Plate |
| 43 | Laying and Fixing Earthing Complete |
| 44 | Fixing of Distribution Box with Clamp |
| 45 | Laying and Fixing of GI Pipe |
| 46 | FIXING OF HDPE PIPE 140 MM DIA PIPE FOR LAYING OF 33 KV, 3X300 SQMM XLPE CABLE WITH HDD (TRANCHLESS) MATHOD INCUDING CABLE LAYING |
| 47 | Carriage of cable & conductor old material from pit site to JE store/store center Etah in distance range 0 to 60 km. including loading & unloading and proper stacking. Please Enable Macros to View BoQ information |