|
| 1 | Road/Bridge Work |
| 2 | Constructio/Upgradtion of Rural Road and CDs/Bridges Under Package No. MP-32912 (Offer Based on SSR issued by MPRRDA Effective from 01.01.2024.) as per detailed BOQ attached in Annex-II A Please Enable Macros to View BoQ information Bill of Quantity Details For The Percentage (%) Rate Tender (As per SOR 01.01.2024) District - Rewa Package No MP-32912 No of Roads 5 S.No. Block Road Name Length (in km) Cost of Construction (in Lacs) |
| 3 | Sirmour |
| 4 | Sirmour |
| 5 | Sirmour |
| 6 | Sirmour |
| 7 | Sirmour Total 11.18 615.01 Total PAC Construction 615.01 Total PAC Maintanance 34.44 Grand Total PAC 649.45 S.NO SSR NO ITEM OF WORK UNIT QUANTITY RATE AMOUNT REMARK 23 23 |
| 8 | 1.6 A. Reference benchmark/working benchmark (As per drawing annex-I) No 59.0 1103.0 65077.0 23 23 B. Reference piller (As per drawing annex-I) No 200.4 642.0 128657.0 23 23 |
| 9 | 3.3 A |
| 10 | 3.3 (b) |
| 11 | 4.19 (a) |
| 12 | 10.12 |
| 13 | 10.12 |
| 14 | 10.13 |
| 15 | 10.2 A 900 mm equilateral & triangle Each 39.0 3695.0 144105.0 23 23 B 600 mm Circular Each 21.0 3531.0 74151.0 23 23 B 600 mm Circular Each 31.0 3284.0 101804.0 23 23 C 800 mm x 600 mm rectangular Each 15.0 4014.0 60210.0 23 23 D 600 mm x 450 mm rectangular Each 1.0 3499.0 3499.0 23 23 E 600 mm equilateral & triangle Each 60.0 3219.0 193140.0 23 23 |
| 16 | 10.6 (A) i) 5th Kilometre Stone (precast) Each 0.0 3756.0 0.0 23 23 ii) Ordinary Kilometer Stone (Precast) Each 18.0 2203.0 39654.0 23 23 iii) 200 m stone (precast) Each 45.0 623.0 28035.0 23 23 |
| 17 | 10.15 |
| 18 | 10.16 |
| 19 | 10.14 (a) For 7.50 M Formation Width No 18.0 29400.0 529200.0 23 23 |
| 20 | 10.18 (a) |
| 21 | 9.8 (A) 600 mm dia RM 50.0 1680.0 84000.0 23 23 (E) 300 mm dia RM 40.0 433.0 17320.0 23 23 |
| 22 | 9.8 (A) 600 mm dia RM 180.0 1669.0 300420.0 23 23 (E) 300 mm dia RM 140.0 422.0 59080.0 23 23 |
| 23 | 11.1(I) |
| 24 | 11.1(I) |
| 25 | 11.4 (i) |
| 26 | 11.4 (i) |
| 27 | 11.4 (ii) |
| 28 | 12.5 II i PCC Grade M15 Cum 84.75 4787.0 405698.0 23 23 |
| 29 | 2.5 B Cement Concrete Cum 153.0 444.0 67932.0 23 23 Total 55862070.0 23 23 23 23 |
| 30 | 9.1 (i) upto 1.5 m depth Cum 776.5 268.0 208102.0 23 23 upto 1.5 m to 3 m. depth Cum 134.1 360.0 48276.0 23 23 |
| 31 | 9.2 II |
| 32 | 9.3 B |
| 33 | 11.1 (i) upto 1.5 m depth Cum 110.23 268.0 29542.0 23 23 upto 1.5 m to 3 m. depth Cum 22.05 450.0 9923.0 23 23 ii Ordinary rock (not requiring blasting) Cum 14.7 471.0 6924.0 23 23 |
| 34 | 11.4 (i) |
| 35 | 12.5 II i PCC Grade M15 Cum 778.5 4787.0 3726680.0 23 23 B R.C.C grade M 20 Cum 4.59 5375.0 24671.0 23 23 |
| 36 | 13.1 (b) |
| 37 | 13.16 |
| 38 | 12.16 |
| 39 | 12.1 (I) Granular Material Cum 199.77 818.0 163412.0 23 23 |
| 40 | 7.5 Total CD Work 5639307.0 23 23 Total of Pavment work Lacs 558.62 23 23 Total of CD work Lacs 56.39 23 23 Grand Total Pavements, and CD works Lacs 615.01 Maintenance S.NO BT Length (T-5 and above) For Road Width 7.50 m. Rate/ km Amount Year |
| 41 | 10.02 |
| 42 | 10.02 |
| 43 | 10.02 |
| 44 | 10.02 |
| 45 | 10.02 Total 32.6 S.NO CC Length (T-5 and above) For Road Width 7.50 m. Rate/ km Amount Year |
| 46 | 1.16 Total 1.84 34.44 Total - Work + Maintenance - PAC 649.45 Note :- 1.0 If the static roller is used in place of vibratory roller the deduction will be made as per the following:- a. Embankment and subgrade @ Rs 8.00 / cum b. Granular -Sub base @ Rs 8.00 / Cum. 2.0 If Motor grader is not used the deduction will be made as per following :- a. Embankment and subgrade @ Rs 8.00 / cum b. Granular -Sub base @ Rs 30.00/ Cum. 3.0 If Tractor mount grader more than 65 HP ( 6 Wheel - 4 Wheel ) is used in place of motor grader the deduction will be made as per the following:- a. Embankment and subgrade @ Rs 4.00 / cum b. Granular -Sub base @ Rs 15.00 / Cum. 4.0 The nomenclatures of items in BOQ are as per Standard Schedule Of Rates, issued by MPRRDA ( wef. 01 January 2024, the general rates of SSR will, therefore, be applicable. Rates quoted against an item where quantity is zero , will be of no consequence. If such items to be executed subsequently it will be an extra item. |