|
| 1 | Road/Bridge Work |
| 2 | Construction/Upgradation of Rural Road and CDs under Package No.MP 15904 (Offer Based on SSR issued by MPRRDA Effective from 01-01-2024.) as per detailed BOQ attached in Annex-II A. MPRRDA, PIU HARDA Annex-II A Bill of Quantity Details for the Percentage (%) Rate Tender Based on SSR 01.01.2024 District :- Harda PIU :- Harda Package No. :- MP15904 Sl. No. Block Name of the Road Length in Km |
| 3 | Timarni Total 2.5 Amount of Construction Cost 193.78 Lacs Amount of Maintenance Cost 5.62 Lacs Total Amount of PAC 199.4 Lacs 19940000.0 Sl. No. SOR .no. Description of item Unit Quantity RATE AMOUNT |
| 4 | 1.6 A A. Reference benchmark/working benchmark (As per drawing annex-I) Per no 1103.0 0.0 B B. Reference piller (As per drawing annex-I) Per no 642.0 0.0 |
| 5 | 2.1 a) In area of non-thorny jungle Total Qty Hac. 1.5 18004.0 27006.0 2.5 Dismantling of Structures Dismantlingof existingstructures likeculverts, bridges, retainingwallsandother structurecomprisingof cement concrete includingT&Pandscaffoldingwherevernecessary,sortingthedismantledmaterial, disposal of unserviceablematerial andstacking theserviceablematerial with all lifts and lead of 1000 m as per Technical Specification Clause 202. (B) Cement Concrete Cum 20.35 544.0 11070.0 2.6 Dismantling Brick/Stone Masonry, stone pitching Dismantlingofexistingstructures likeculverts,bridges, retainingwallsandotherstructurescomprisingofbrick/stonemasonry, includingdisposalofunserviceablematerialandstackingtheserviceablematerialwithall liftandleadof1000masperTechnicalSpecificationClause202. (B) Stone masonary (i) Cement Mortar Cum 42.78 304.0 13005.0 2.7 Removingall typesofHumepipesandstacking includingEarthworkandDismantlingof Masonry Works as per Technical Specification Clause 202. (a) Upto 600 mm dia Hume pipe RM 6.0 234.0 1404.0 (b) Above 600 mm to 900 mm dia Hume pipe RM 60.0 316.0 18960.0 (C ) Above 900 mm dia Hume pipe RM 60.0 541.0 32460.0 |
| 6 | 3.2A Construction of embankment with approved materials deposited at site from roadwaycutting and excavation from drain and foundation of other structures or from borrowarea graded by motor grader and compacted by using vibratory rollers of 80 to 100 kNstatic weight to meet requirement of Tables 300.1 and 300.2 as per TechnicalSpecification Clauses 301.3 & 301.5 including, watering rolling etc complete. Total Qty Cum. 339.84 80.0 27187.0 Construction of Embankment, subgrade & earthen shoulders with Material Obtained fromBorrow Pits |
| 7 | 3.3B Total Qty Cum. 7157.4 163.0 1166656.0 |
| 8 | 3.3A Construction of embankment, subgrade & earthen shoulders with approved material (Select soil having CBR > 7) obtained from borrow pits i/c all leads and lift and removal of top soil if any, including cost of land as a source of material, transporting to site, spreading, graded by motor grader to required slope and compacting using vibratory rollers of 80 to 100 kN static weight to meet requirement of Tables 300.1 and 300.2 including all leads, etc. as per Technical Specification Clauses 301.3, 301.5, and 303 Subgarade Section for - Total Qty Cum. 1442.82 198.0 285678.0 |
| 9 | 3.4 Total Qty Cum. 828.82 46.0 38126.0 |
| 10 | 4.1 A A ) Crushed stone materials Total Qty Cum. 1522.1 1069.0 1627125.0 |
| 11 | 4.7 Net Qty CUM 1136.63 1963.0 2231205.0 |
| 12 | 4.8 Hard Shoulders Construction of hard shoulder as per clause 407 with selected soil having CBR value not less than 12 inclusive of all leads and lifts providing 4% camber I/c operations like watering, rolling and compaction, royalty charges etc. as per clause 303.5 Net Qty Cum. 1107.0 376.0 416232.0 Wet Mix Macadam Prime Coat |
| 13 | 5.1(i) Net Qty SQM 7026.0 52.0 365352.0 |
| 14 | 5.2(i) Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.225 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. Net Qty SQM 7026.0 14.0 98364.0 |
| 15 | 5.9 II VG30 Sqm. 7026.0 137.0 962562.0 |
| 16 | 5.12 II TYPE-B (ii)VG30 Sqm. 7026.0 50.0 351300.0 Cement Concrete Pavement (CC M-30 without dowel bars) |
| 17 | 6.9 Total Qty CUM 245.5 5770.0 1416535.0 6.11 Cement Concrete Pavement (CC M-30 without dowel bars & without joints)Construction of un-reinforced, plain cement concrete pavement, thickness as perdesign, over a prepared sub base, with 43 grade cement or any other type as perClause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383,maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer ofnot less than 0.2 cum capacity and appropriate weigh batcher using approved mixdesign, laid in approved fixed side formwork (steel channel, laying and fixing of 125micron thick polythene film, wedges, steel plates including levelling the formwork as perdrawing), spreading the concrete with shovels, rakes, compacted using needle, screedand plate vibrators and finished in continuous operation. Including admixtures asapproved, curing of concrete slabs for 14-days, MORD 2014 Clause no. 1501.8. Cum 319.19 5747.0 1834385.0 |
| 18 | 6.10 (I) |
| 19 | 6.12 (iv) For 12.5cm thick CC Slab (Running meter of Joint) M 5400.0 16.0 86400.0 (ii) For 20 cm thick CC Slab (Running meter of Joint) M 25.0 0.0 7.5 Cement Concrete Pavement Construction of un-reinforced and construction joint only, plain cement concretepavement, thickness as per design, over a prepared sub base, with 43 grade cement orany other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregatesconforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixedin a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcherusing approved mix design, laid in approved fixed side formwork (steel channel, layingand fixing of 125 micron thick polythene film, wedges, steel plates including levelling theformwork as per drawing), spreading the concrete with shovels, rakes, compacted usingneedle, screed and plate vibrators and finished in continuous operation includingprovision of contraction and construction joints, applying debonding strips, primer,sealant, approaches to bridge/culvert and construction joints, admixtures as approved,curing of concrete slabs for 14-days, Total Qty Cum 5926.0 0.0 |
| 20 | 9.1 Earthwork in excavation for foundation of structures as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, sortingout servicible & unservicible materials and disposal of all materials upto 1000 m lead and backfilling with approved material. A. A Ordinary soil (i) Upto 1.5 m depth CUM 268.0 0.0 (II) 1.5 m to 3 m depth CUM 360.0 0.0 9.2 Bedding for Pipe (ii) Type B (First Class) Bedding Laying(FirstClass)beddingwithwell compactedsand,moorumorapprovedgranularmaterial as per Clause 1101.5 Cum 786.0 0.0 9.3 Providing and Laying Reinforced Cement Concrete Pipe NP3 ISI Marked,PlainEnds(conforming to IS Code 458-2003} as per design Providingand layingISImarkreinforcedcement concretehumepipeNP3 for culvertsonfirstclassbeddingofgranular material insinglerowincluding jointing withcementmortar1:2butexcludingexcavation,protectionworks,backfilling,bedding, concreteandmasonryworks in head walls and parapets Clause 1101.6 (B) 1000 mm dia RM 5009.0 0.0 |
| 21 | 9.8 A) NP3 Pipes 600 mm dia 10.00 m Length @ 2 per km RM 110.0 1680.0 184800.0 E) NP2 Pipes 300 mm dia 10.00 m Length @ 2 per km RM 50.0 433.0 21650.0 10.1 Printing New Letters and Figures of any Shade Printingnewletterandfiguresofanyshadewithsyntheticenamelpaintblackoranyother approvedcolour togiveanevenshadeasperdrawingsandTechnicalSpecificationClause 1701 (i) Hindi (Matrascommasandthelikenot tobemeasuredandpaidfor. Half lettersshallbe counted as half only) per cm height per 6250.0 1.0 6250.0 |
| 22 | 10.2 (ii) B 600 mm Circular each 4.0 3531.0 14124.0 C 800 mm x 600 mm rectangular each 2.0 4014.0 8028.0 D 600 mm x 450 mm rectangular each 2.0 3499.0 6998.0 E 600 mm equilateral & triangle each 10.0 3219.0 32190.0 A 900 mm equilateral & triangle each 8.0 3695.0 29560.0 |
| 23 | 10.3 Painting two coats including primer coat after filling the surface with synthetic enamel paint in Total Qty SQM 120.0 0.0 |
| 24 | 10.6 Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 (A) i) 5th Kilometre Stone (precast) each 3756.0 0.0 ii) Ordinary Kilometer Stone (Precast) each 4.0 2203.0 8812.0 iii) 200 m stone (precast) each 10.0 623.0 6230.0 Providing and Fixing 'PMGSY Sign board' and 'Logo' of PMGSY Project (A) PMGSY Sign Board |
| 25 | 10.12(A) Construction of cement concrete PMGSY information board PMGSY Logo Board |
| 26 | 10.12 (B) Providing and Fixing 'citizen's information board' of PMGSY Project |
| 27 | 10.13 |
| 28 | 10.14 Providing and laying rounded hump type of Speed Breaker confirming to IRC – 99 and as per guidelines and drawings of NRRDA circular no. DO No. P-17019/6/2006/PII Dated 16 Sept 2009, including providing, laying and compaction of GSB, G II, G III, OGPC, Seal Coat Type B, as per specifications and appended drawing on both the sides of carriage way up to formation width maintaining rounded hump type shape with bituminous mix material i/c providing and painting of black and white strips, providing and fixing of two no. 600mm equilateral semi reflecting sign boards, i/c cost of all materials, labour T & P & Machinery etc complete and as directed by engineer in charge as per relevant clauses of MORD specifications. A For 7.50 M Formation Width each 3.0 29400.0 88200.0 Speed Braker (For 9.0 Mt Formation Width (5.50 carriage way width)) |
| 29 | 10.15 Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. Net Qty Sqm 279.0 638.0 178002.0 10.16 White washing of parapet walls of CD work and tree truncks White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916 Total Qty Sqm 29.6 20.0 592.0 |
| 30 | 11.1 1.0 Ordinary Soil (i) Upto 1.5 m depth (In Retaining Wall) Total Qty cum 739.73 268.0 198248.0 (ii) Upto 1.5 m to 3 m depth (In Retaining Wall) Total Qty CUM 41.42 360.0 14911.0 (iii) Ordinary rock (not requiring blasting) Upto 3 m dept Total Qty Cum 84.39 450.0 37976.0 (IV) Hard rock (blasting prohibited) Total Qty Cum 56.26 471.0 26498.0 |
| 31 | 11.2 ii ii) Granular material filling for Foundation CUM 491.0 0.0 |
| 32 | 11.4 I Nominal mix 1:3:6 with 40 mm and down graded metal CUM 60.251 4493.0 270708.0 II P C C GRADE M-15 cum. 171.1 4526.0 774399.0 11.8 Supplying, fixingandplacingTMTbar reinforcement infoundationcompleteasperdrawingsand technical specifications Clauses 1000 and 1202 Total Qty MT 1.97 69078.0 136084.0 12.3 Plasteringwith cement mortar (1:4), 15mm thick on brickwork in substructure as pertechnical specification Clauses 613.4 Total Qty Sqm 178.0 0.0 12.5 Plain/reinforcedcement concrete insubstructurecompleteasper drawingsand technical specification Clauses 802, 804, 805, 806, 807, 1202 (ii) (i) P.C.C grade M 15 Nominal mix (1:2.5:5) Cum 712.43 4787.0 3410402.0 (IV) R.C.C grade M 20 Cum 19.96 5375.0 107285.0 12.6 Supplying, fixing and placing TMT bar reinforcement (Fe 500) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1204.15 & 1202 Total Qty MT 69078.0 0.0 12.7 Supplying, fixingandplacingTMTbar reinforcement (Fe500) insubstructruecompleteasper drawings and technical specification Clauses 1002, 1005, 1204.15 & 1202 MT 2.896 69078.0 200050.0 Total Qty |
| 33 | 12.9 Total Qty M 282.0 160.0 45120.0 12.1 Backfillingbehindabutment,wingwallandreturnwallcompleteasperdrawings&technicalspecification Clause 1206.3. (i) Granular material Cum 548.06 818.0 448313.0 12.16 Providng and fixing in position bituminious paper bearing for slabs as per approved drawing and confirming to IS:1398 Total Qty Sqm 30.24 48.0 1452.0 13.1 Providing and laying reinforced cement concrete in superstructure as per drawing andtechnical specifications Clauses 800, 1400 (ii) R.C.C M 25 Cum 94.92 6156.0 584328.0 13.2 Supplying, fixing, andplacingTMTbar reinforcement in superstructurecompleteasperdrawing and technical specifications Clauses 1002, 1204.15 and 1202 Total Qty MT 0.94 69078.0 64933.0 13.3 Supplying, fixing, andplacingTMTbar reinforcement in superstructurecompleteasperdrawing and technical specifications Clauses 1002, 1204.15 and 1202 Total Qty MT 9.5 69078.0 656241.0 13.5 Providingand laying cement concretewearing coat 75mmthickM30grade includingreinforcementof8mmdiameterand150mmspacinginbothdirectionshallbeprovidedatthemiddepthof thewearingcoatetccompleteasperdrawingandtechnical specificationsClauses 800 and 1400 Total Qty Cum 13.17 12088.0 159199.0 13.6 Construction of R.C.C. railing of M25 grade in cast-in-situwith 20mmnominal sizeaggregate, trueto lineandgrade, toleranceof vertical railingpostnot toexceed1 in500,centre-to-centrespacingbetweenverticalpostsnot toexceed2000mmasperdrawingandtechnical specifications Clauses 800, 900, 1404 & 1706 Total Qty M 70.8 3021.0 213887.0 13.9 Drainage spouts complete as per drawing and technical specifications Clause 1404.5 Total Qty No. 8.0 1651.0 13208.0 13.16 Filler Joint (iii) Providingandfixing20mmthickcompressiblefibreboardinexpansionjointcompleteas per drawing and technical specifications Total Qty Sqm 25.66 611.0 15678.0 |
| 34 | 14.3 14.1 Guard stones Providing and fixing guard stones on curves or at any other place as directed by engineer incharge made of 220 X220X1000 mm hammer dressed stones / RCC M-15 and fixed 400mm into the ground in morum and broken agreegates block of size 500X500X500mm and painted with white and black bands in 2 coat with redimix enamel paint including excavation of pit etc. complete. each 160.0 544.0 87040.0 |
| 35 | 15.7 (a) aintenance of Hume pipe Culvert by way of Clearing of silt or debris on both up stream & down stream Cleaning, Erosion repair, repairs to cracks, parapet wall, protection work and invert to restore in original condition as per drawing and technical specification Clause 1909 (For one row) For 1 Row of HPC No. 1311.0 0.0 (B) For 2 Row of HPC No. 1639.0 0.0 For 3 Row of HPC No. 1967.0 0.0 19377624.0 Say Rs. 193.78 PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY) {Ministory Of Rural Devlopment , Govt. Of India} Maintenance of Road Project Package No MP15904 Road Name Mahukhal To Kayari Road District HARDA Length 2.5 KM Block Timarni Description of Item Amount Required for maintenance of Road for five years after completion of Project. For BT Road 5.50m(KM) Rate(Rs) Amount For BT Road 3.75m(KM) Rate(Rs) Amount For CC Road (KM) Rate(Rs) Amount Amount (Rs) 1st Year 0.0 48600.0 0.0 1.6 41460.0 66336.0 0.9 31660.0 28494.0 94830.0 2nd Year 0.0 57800.0 0.0 1.6 48540.0 77664.0 0.9 31660.0 28494.0 106158.0 3rd Year 0.0 108800.0 0.0 1.6 68655.0 109848.0 0.9 31660.0 28494.0 138342.0 4th Year 0.0 130200.0 0.0 1.6 78455.0 125528.0 0.9 31660.0 28494.0 154022.0 5th Year 0.0 151600.0 0.0 1.6 88255.0 141208.0 0.9 31660.0 28494.0 169702.0 0.0 520584.0 130000.0 142470.0 562054.0 663054.0 Total Amount in Rs. 562054.0 Say in Lacs. 5.62 Lac Total Maintenance Cost I/c 18 % GST 6.63 Please Enable Macros to View BoQ information |