Bids Are Invited For Repair And Overhauling Service - Rate Contract For Removal Shifting To Shop Floor And Re Fitmentof Srgm Gun Mount Shield And Its Accessories Vice Versa Onboard In Vessels; Any Other Suitable Brand; No; Buyer Premises - Transporta, Visakhapatnam-Andhra Pradesh
TDR : 56071717
Tender Notice
BOQ
10 Days Left
Visakhapatnam
Andhra Pradesh
Bids Are invited for Repair And Overhauling Service - Rate Contract For Removal Shifting To Shop Floor And Re Fitmentof Srgm Gun Mount Shield And Its Accessories Vice Versa Onboard In Vessels; Any Other Suitable Brand; No; Buyer Premises - Transporta
Transportation of SRGM from IN ships to shop floor as per TECHNICAL DOCUMENT 1576.90.379 Volume 06 of Chapter 08 Installation: a) Draining of hydraulic oil and other lubricants safely. b) Removal of cooling lines. c) Removal of rotary feed magazine. d) Removal all electrical connections. e) Removal of base bolts of gun mount f) Shifting of gun mount onto transportation fixture with specialized lifting gear g) Securing with fasteners on transportation fixture h) Bringing transportation fixture with gun together to horizontal position for transportation. j) Shifting and unloading of the gun along with transportation fixture at shop floor/ specific location. k) Bringing transportation fixture with gun together to vertical position l) Shifting of the gun onto SRGM test pit. m) Securing Base bolts of Gun to SRGM Test pit in C 68 S/F
Transportation of SRGM from IN ships to shop floor as per TECHNICAL DOCUMENT 1576.90.379 Volume 06 of Chapter 08 Installation: a) Draining of hydraulic oil and other lubricants safely. b) Removal of cooling lines. c) Removal of rotary feed magazine. d) Removal all electrical connections. e) Removal of base bolts of gun mount f) Shifting of gun mount onto transportation fixture with specialized lifting gear g) Securing with fasteners on transportation fixture h) Bringing transportation fixture with gun together to horizontal position for transportation. j) Shifting and unloading of the gun along with transportation fixture at shop floor/ specific location. k) Bringing transportation fixture with gun together to vertical position l) Shifting of the gun onto SRGM test pit. m) Securing Base bolts of Gun to SRGM Test pit in C 68 S/F
2
Transportation of SRGM from shop floor to ship as per TECHNICAL DOCUMENT 1576.90.379 Volume 06 of Chapter 08 Installation: a) Removal of fasteners of gun on SRGM test pit. b) Bringing transportation fixture to vertical position c) Shifting of gun mount onto transportation fixture with specialized lifting gear. d) Securing with fasteners on transportation fixture. e) Bringing transportation fixture with gun together to horizontal position for transportation f) Shifting and unloading of the gun along with transportation fixture at specified jetty. g) Bringing transportation fixture with gun together to vertical position. h) Shifting on gun onto SRGM foundation of the ship. j) Lowering of COT panel and fitment k) Fitment of cooling lines l) Fitment of rotary feed magazine m) Fitment of all electrical connections
Transportation of SRGM from shop floor to ship as per TECHNICAL DOCUMENT 1576.90.379 Volume 06 of Chapter 08 Installation: a) Removal of fasteners of gun on SRGM test pit. b) Bringing transportation fixture to vertical position c) Shifting of gun mount onto transportation fixture with specialized lifting gear. d) Securing with fasteners on transportation fixture. e) Bringing transportation fixture with gun together to horizontal position for transportation f) Shifting and unloading of the gun along with transportation fixture at specified jetty. g) Bringing transportation fixture with gun together to vertical position. h) Shifting on gun onto SRGM foundation of the ship. j) Lowering of COT panel and fitment k) Fitment of cooling lines l) Fitment of rotary feed magazine m) Fitment of all electrical connections
3
Shifting empty transportation fixture from jetty to shop floor and vice versa: a) Bringing transportation fixture to horizontal position and mustering all special tools and assemblies of the fixture. b) Transportation to shop floor. c) Unloading and securing of transportation fixture in horizontal position at specific location.
Shifting empty transportation fixture from jetty to shop floor and vice versa: a) Bringing transportation fixture to horizontal position and mustering all special tools and assemblies of the fixture. b) Transportation to shop floor. c) Unloading and securing of transportation fixture in horizontal position at specific location.
4
Removal and fitment of shield of SRGM: a) Removal of all fasteners. b) Lifting preparation with special fixture. c) Renewal of elevation seal. d) Renewal of training seal. e) Fixing cupola back to original position securing with fasteners. f) Repair / refurbishment of cupola lifting brackets
Removal and fitment of shield of SRGM: a) Removal of all fasteners. b) Lifting preparation with special fixture. c) Renewal of elevation seal. d) Renewal of training seal. e) Fixing cupola back to original position securing with fasteners. f) Repair / refurbishment of cupola lifting brackets
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.