| 1 | At 33/11kV S/stn Jabli (TS No. 26/2019-20 WBS No. D-19-1339) |
| 2 | Providing Installation testing and Comissioning of 1.5 Ton Capacity Split AC's white in colour (LG/Godrej/Llyod make) including indoor and outdoor units, MS stand for outdoor unit, insulated copper refrigerant piping, condensate drainage piping, interconnecting electrical cabling between indoor and outdoor units up to 10 metres, power cable, necessary fittings, accessories, hardware, commissioning, testing and all other allied works required for satisfactory operation of the AC, complete in all respects at site. |
| 3 | Providing Installation testing and Comissioning of 2 Ton Capacity Split AC's white in colour (LG/Godrej/Llyod make)including indoor and outdoor units, MS stand for outdoor unit, insulated copper refrigerant piping, condensate drainage piping, interconnecting electrical cabling between indoor and outdoor units up to 10 metres, power cable, necessary fittings, accessories, hardware, commissioning, testing and all other allied works required for satisfactory operation of the AC, complete in all respects at site. |
| 4 | At 33/11kV S/stn Beri (TS No. 26/2019-20 WBS No. D-19-1339) |
| 5 | Providing Installation testing and Comissioning of 1.5 Ton Capacity Split AC's white in colour (LG/Godrej/Llyod make) including indoor and outdoor units, MS stand for outdoor unit, insulated copper refrigerant piping, condensate drainage piping, interconnecting electrical cabling between indoor and outdoor units up to 10 metres, power cable, necessary fittings, accessories, hardware, commissioning, testing and all other allied works required for satisfactory operation of the AC, complete in all respects at site. |
| 6 | Providing Installation testing and Comissioning of 2 Ton Capacity Split AC's white in colour (LG/Godrej/Llyod make)including indoor and outdoor units, MS stand for outdoor unit, insulated copper refrigerant piping, condensate drainage piping, interconnecting electrical cabling between indoor and outdoor units up to 10 metres, power cable, necessary fittings, accessories, hardware, commissioning, testing and all other allied works required for satisfactory operation of the AC, complete in all respects at site. Please Enable Macros to View BoQ information |