Dismantling of Old MS and concrete chimney above the concrete foundation plinth and clean the foundation Bolt (bottom of Chimney) Note : Lifting of Scrap (Concrete guniting and MS) will be in the scope of the contractor. contractor will arrange JCB/Hydra crane/Tractor-Trolley/Tipper etc at its own cost and no extra payment shall be made for this job.
2
Fabrication and erection of MS Chimney from the foundation plinth bolt from bottom to the top of chimney with New Ms Plate/ Channel/Angle etc including Ladder and APCD Ducting as per drawing no. SM88-153-2. Size :- > ID at Bottom = 3.60 MTR >ID at Top = 2.75 MTR >Height of Chimney = 40 MTR Note : Contractor will arrange JCB / Hydra crane etc. at its own cost and no extra payment shall be made for this job.
3
painting of chimney with 2 coat paint : (a) External Surface (b) Internal Surface Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.