| 1 | Erection Part LT Line (TS. No. 16/2026-27 W.B.S. D-26-0389) |
| 2 | Erection of S/T pole 9 mtr long,(Single pole structure) with RCC muff Including digging of pit of size 1.10x0.75x1.50, drilling of holes in poles, X-bracing set, X-arms, Fixing of insulators, X-arms, X- bracing set, fixing of barbed wire, Danger plate, filling of pit & ramming and painting of pole complete in all respects(C.C. 1:3:6 for muffing will be provided by the contractor). |
| 3 | Erection of stay set LT line, comprising digging of pit, fixing of stay rod, filling of pit, Nozzeling and tightining complete in all respects. |
| 4 | Add Erection Charges for LT Earthing Set |
| 5 | Sagging of conductor 1 KM single GI wire, AAAC cond., comprising laying of Conductor, stringing & sagging, binding with insulator complete in all respects. |
| 6 | Erection of LT line with ACSR 30 mm² 6/1/2.59 mm such as stringing, tensioning and sagging,jointing and fastening . |
| 7 | Add Manual Carriage |
| 8 | Transportation Charges for complete Material of LT line |
| 9 | (Supply Part LT LIne) |
| 10 | ACSR 6/1/2.59 mm (30 mm²) { Neutral conductor including 1% (Sag, Jumpering and wastage} |
| 11 | Steel Tubular Poles (9 m, Working Load>200kgf/m²) (with Ruling Span 67 m) |
| 12 | Muffs with concerete filling |
| 13 | Shackle Insulator (16 kN) |
| 14 | D-Iron (U- Clamps) |
| 15 | Earth Knob complete |
| 16 | LT Stay Set |
| 17 | Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set) |
| 18 | Full Clamps |
| 19 | Earthing Set complete |
| 20 | Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 21 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 22 | Aluminium Paint |
| 23 | Spiral PVC Spacer |
| 24 | Chief Electrical Inspection fee (For LT Line) Please Enable Macros to View BoQ information |