|
| 1 | Erection Part 100 KVA DTR |
| 2 | Erection of 100 KVA DTR, LT Box, Cable and Energy meter complete in all respect. |
| 3 | Mannual/ Transportation/ Loading /Unloading Charges of complete Material of 100 KVA,11/0.4kV S/Stn from road side |
| 4 | (Supply Part 100 KVA DTR) |
| 5 | Muffs (2000mm) with concerete filling |
| 6 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line |
| 7 | MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LA's |
| 8 | X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 9 | X-Arm [Channel Iron (100x50x6 mm), Length : (460 mm) x 2 Nos for supporting Main Channel of Transformer] |
| 10 | MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos |
| 11 | MS Angle Iron (35X35x6 mm), Length : (460 ) x 2 Nos |
| 12 | MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing |
| 13 | MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos |
| 14 | GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length : 460 mm |
| 15 | GO AB Switch Unit (11 kV, 400A, 25 KA |
| 16 | DO Fuse Unit |
| 17 | Surge Arrester, 9 kV Station Class (Porcelain Type) |
| 18 | Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) |
| 19 | Stay set complete (i/c Stay Clamps) |
| 20 | Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) |
| 21 | Pipe Earthing Set and |
| 22 | 6 SWG GI wire For Earthing |
| 23 | Half Clamp (M.S. Flat 50X6 mm) |
| 24 | Full Clamps (M.S. Flat 50X6 mm) |
| 25 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 26 | Aluminium Thimble off size |
| 27 | Copper Thimble 200 Amp |
| 28 | Danger Plate |
| 29 | Barbed Wire |
| 30 | LT Cable (3.5 Core) 120 mm² |
| 31 | Aluminium Paint. Please Enable Macros to View BoQ information |